PRODUCED BY AN AUTODESK STUDENT VERSION
OUTER FACE
COLUMN
31'-10" C10,C13
C2,C11
C14
C12
C5
C6
C8
26'-10" C4
C3
C9
C1
C7
1)FOR SLABS , BEAMS & LINTELS
36'-8"
37'-0"
49'-4"
51'-3"
51'-8"
13'-9"
14'-6"
14'-7"
0'-0"
4.5"
8mm Tor = 460mm
9"
10mm Tor = 570mm
12mm Tor = 690mm
16mm Tor = 920mm
C11 C12 C13 C14 20mm Tor = 1140mm
30'-5" C12,C13,C14
30'-2" C11 2) FOR COLUMNS & FOOTINGS
8mm Tor = 370mm
10mm Tor = 460mm
12mm Tor = 560mm
16mm Tor = 740mm
30'-10" COLUMN OUTER TO OUTER
C8 C9 C10
20mm Tor = 920mm
CLEAR COVER
PRODUCED BY AN AUTODESK STUDENT VERSION
18'-10" C8,C9,C10
PRODUCED BY AN AUTODESK STUDENT VERSION
C6 C7 1)FOR SLAB = 20 mm
15'-1" C6,C7 2) FOR BEAMS = 25 mm
3) FOR COLUMNS = 40mm
C2 C3 C4 C5
3'-8" C2
C1 3'-5" C3,C4,C5
4.5" C1
0'-0" COLUMN 2ND STEP
52'-0" COLUMN OUTER TO OUTER
OUTER FACE
FOUNDATION / COLUMN CENTRE LINE PLAN IST STEP Min 450mm
Dmax
D min
SCHEDULE OF COLUMNS (LOAD CONSIDERED G+2) 75mm
150mm
C11 C2 C1,C3,C4,C5,C8,C12 C6,C7,C13 C9 C10,C14
COLUMN NUMBERS
150mm THICK P.C.C
TYPICAL ISOLATED FOOTING SECTION
2ND SLAB LEVEL SIZE 9" X 15" 9" X 15" 9" X 15" 9" X 15" 9" X 18" 9" X 18"
SECOND TO STEEL 6 12 6 12 8 12 8 12 8 16 4 16 + 4 12
FLOOR TERRACE LEVEL LINKS 8 @ 7" c/c 8 @ 7" c/c 8 @ 7" c/c 8 @ 7" c/c 8 @ 9" c/c 8 @ 7" c/c
1ST SLAB LEVEL SIZE 9" X 15" 9" X 15" 9" X 18" 9" X 18" 9" X 21" 9" X 18"
FIRST TO STEEL 6 12 8 12 8 12 4 16 + 4 12 8 16 8 16
FLOOR 2ND SLAB LEVEL LINKS 8 @ 7" c/c 8 @ 7" c/c 8 @ 7" c/c 8 @ 7" c/c 8 @ 9" c/c 8 @ 9" c/c
FOOTING SIZE 9" X 15" 9" X 15" 9" X 18" 9" X 18" 9" X 21" 9" X 18"
GROUND TO STEEL 6 12 8 12 8 12 4 16 + 4 12 8 16 8 16
FLOOR LONG BARS
1ST SLAB LEVEL LINKS 8 @ 7" c/c 8 @ 7" c/c 8 @ 7" c/c 8 @ 7" c/c 8 @ 9" c/c 8 @ 9" c/c
REMARKS
FOOTING WIDTH
16MM DIA FOOTING PCC WIDTH
12MM DIA
TYPICAL ISOLATED STEPPED FOOTING PLAN
FOUNDATION / COLUMN CENTRE LINE PLAN ECTIONS
SCHEDULE OF STEPPED FOOTINGS (SBC CONSIDERED FOR (H.M.) = 300 KN/SQM)
C11 C2 C1,C3,C4,C5,C8 C6,C7,C13 C9 C10,C14
COLUMN NUMBERS C12 FOUNDATION / COLUMN CENTRE LINE PLAN
WITH SCHDULE
DEPTH OF Dmax 18" 18" 18" 21" 24" 21"
PROPOSED CONSTRUCTION OF G+2 RESIDENTIAL
FOOTING Dmin 9" 9" 9" 11" 12" 11" BUILDING FOR MR. KHONDE SHAB (AMJAD PATHAN)
SIZE OF 1ST STEP 3'6" X 4'6" 4'0" X 4'6" 4'0" X 5'0" 4'0" X 5'6" 5'0" X 6'0" 4'0" X 5'6" STRUCTURAL DESIGN BY
FOOTING (B X L) 2ND STEP 2'0" X 3'0" 2'6" X 3'0" 2'6" X 3'6" 2'6" X 4'0" 3'6" X 4'6" 2'6" X 4'0"
JVStructural
Consultants
Engineers &
SIZE OF P.C.C 4'0" X 5'0" 4'6" X 5'0" 4'6" X 5'6" 4'6" X 6'0" 5'6" X 6'6" 4'6" X 6'0"
OFFICE :-Plot 311/P,Opp Patel Junior College,
SHORT REINF. S-BARS 10 @ 6" C/C 10 @ 6" C/C 10 @ 6" C/C 10 @ 5" C/C 10 @ 4.5" C/C 10 @ 5" C/C Hussain Nagar, Beed By Pass Aurangabad .
Mobile : 9423028563, 9673071706,9141685474
LONG REINF. L-BARS 10 @ 6" C/C 10 @ 6" C/C 10 @ 6" C/C 10 @ 5" C/C 10 @ 4.5" C/C 10 @ 5" C/C Email : [email protected]
PRODUCED BY AN AUTODESK STUDENT VERSION EMPANELLMENT ON PWD REGION AURANGABAD AS A STRUCTURAL
NOTE :-1) ALL STEPS OF EACH FOOTING SHOULD BE CASTED WITHIN 10 HRS PERIOD ONLY DESIGNERS VIDE C.E. LTR NO. CEA/D-7/4625 OF DT.31-08-2019