This work order is issued to Goyal Construction Co for the laying of optical fiber cable (OFC) over a distance of 10.4 KM in a wildlife area from Sawai Madhopur to Bodal. The total cost for the project is 52,00,000 INR, with detailed breakdowns of materials and services provided. The contractor must sign and return the work order within three days to avoid payment delays or potential termination of the order.

Uploaded by

Sanket Gite
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views1 page

0 0 111121122712141wo

This work order is issued to Goyal Construction Co for the laying of optical fiber cable (OFC) over a distance of 10.4 KM in a wildlife area from Sawai Madhopur to Bodal. The total cost for the project is 52,00,000 INR, with detailed breakdowns of materials and services provided. The contractor must sign and return the work order within three days to avoid payment delays or potential termination of the order.

Uploaded by

Sanket Gite
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Work Order

To
382305
GOYAL CONSTRUCTION CO Work Order No. :
Date:

GSTN Of Biller :
Phone : +919425137001 Bill From State : Rajasthan
Fax : Bill From :
E-Mail : [email protected] Date:
Attention: Mr. Arun Goyal Our Ref:

In accepting this WORK ORDER, CONTRACTOR agrees to furnish the GOODS/Do WORK specified in full accordance with
all conditions set forth herein and / or attachments hereto. All drawings, designs, specifications and other data prepared
by OWNER and related thereto are the property of the OWNER and must be returned to OWNER upon completion by
CONTRACTOR of the obligations under this WORK ORDER. The information contained herein is not to be released or
disclosed for any other use or purpose other than for the execution of this WORK ORDER. It is important that
CONTRACTOR signs and returns the Work Order copy within three (3) days of receipt. No other form of Order acceptance
will be accepted. Failure to return the Order acceptance does not diminish the responsibilities as set forth herein, but
may result in delay to any payment(s) that may be due and may be the cause for termination of this WORK ORDER. For
all correspondence, Please quote Contract/Work Order No. For detailed commercial terms & conditions, please refer line
items terms/enclosures.

WO Period From DT : 01.12.2017 to 31.01.18

OFC LAYING - SERVICES IN WILD LIFE from Sawai Madhopur to Bodal


Scope of Work for Laying OFC in wild life area (RTR) - 10.4 KM
Type Qty. UOM Rate Amount
Duct - 2 Type 20,800 Mtr 56 11,64,800
Fiber - 48F 10,400 Mtr 51 5,30,400
Manhole 100 No 3,216 3,21,600
Joint Closure 4 No 1,497 5,988
FDP 2 No 2,606 5,212
Service Cost 10,400 Mtr 305 31,72,000
Grand Total 52,00,000

Delivery Terms : N/A


Engineer in Charge : Mr. Pradeep S Jain

Contractor’s Acceptance

Manoj Likhyani – G.M.


For Reliance Jio Infocomm Ltd. Contractor’s Signature