985
500
985
500
100
100
FASCIA
500
985 18mm THK. PARTICLE
BOARD DOOR PANEL
500 ON WOOD FINISH
500 (VERIFY APPROVED
SPECS)
HANGER ROD 1" Ø HANGER ROD
WITH FLANGES 3
4"PLYBOARD IN SEMI
DUCCO WHITE PAINT
600
FINISH
2400
2400
2200
1300
3
1700
4"PLYBOARD IN SEMI
DUCCO WHITE PAINT
PLAN
FLUSH PULL HANDLE
FINISH
900
400
MASTER'S BEDROOM
100
100
BASEBOARD
SECTION ELEVATION
NOTE:
DOOR PANEL 800
18mm thk. Particle Board in 800 400 400
Laminated Finish w/
100
100
Edgeband FASCIA FASCIA
CARCASS 800
500
500
3 400 400
4:" thk. Plyboard in Semi ORDINARY HANDLE
Ducco Paint Finish SHELF
HANGER ROD 1" Ø HANGER ROD
HARDWARE - VERIFY
600
WITH FLANGES 18mm THK. PARTICLE
APPROVED SPECS BOARD DOOR PANEL
ON WOOD FINISH
(VERIFY APPROVED
2400
2400
1300
· Concealed Hinges (Full SPECS)
& Half) for Swing Door 3
1700
1700
4"PLYBOARD IN SEMI
· 1" Ø Hange Rod with DUCCO WHITE PAINT ORDINARY HANDLE
FINISH
Flanges
· Ordinary Handle - for PLAN
Swing Door SHELF
· Flush Full Handle - for
400
Sliding Door
· Sliding Track & Sliding BEDROOM 1 & 2
100
100
roller BASEBOARD BASEBOARD
REFER TO APPROVED SECTION ELEVATION
SPECS
1 CLOSET DETAILS SCALE 1: 50 MTS.
ARCHITECT: PROJECT TITLE: DEVELOPER: SHEET CONTENT: REVISIONS: REVISED BY DATE Drawn by: DATE/SIGN SHEET No.:
THIS DRAWING AND OTHER
DOCUMENTS ARE INTELLECTUAL Architect: Ar. Christian V. Gonzales
BEDROOM CLOSETS DETAIL 1 Detailer:
PROPERTY OF ME T ROST AR
REALTY AND DEVELOPMENT INC. TWO STOREY UNIT 2 Checked by:
IT IS UNLAWFUL TO DUPLICATE
OR TO MAK E C O PIE S O F SAI D
SINGLE ATTACHED 01 MODEL METROSTAR 3
Team Leader: Ar. Mark Villegas
Sr. Architect: Ar. Edmyrson Lipana
DOCUMENTS WITHOUT THE EMINENZA RESIDENCES IV
WR ITT EN C O NS EN T OF TH E IR REALTY & DEVELOPMENT INC. 4 Approved by:
ARCHITECT. ALL DRAWINGS AND PRC No.: PTR No.: (ALTA MERRA) Design Head: Ar. John Henson
DOCU MENT S AR E T O BE KEPT 5 COO: Mr. Eugene Eugenio
FOR REFERENCE. (R.A. 9266) BAYANI ROAD, BRGY. TUNGKONG MANGGA, CITY OF SAN JOSE DEL Received By / Date:
TIN:
ISSUED ON: ISSUED AT: LOCATION: MONTE, BULACAN ADDRESS: 839 EDSA SOUTH TRIANGLE, QUEZON CITY. PROJECT NO.: DATE: