HSE-Safety (Ref) - 2023-339 Non - Compliance To KIPIC Work Permit System & HSE Inspection # HSE-SAZ-2023-24-SIR-008

An internal memo from KIPIC highlights non-compliance with the work permit system during a hydrotesting activity by contractor M/s TSH J at Al Zour Refinery on May 3, 2023. Observations included the absence of a work permit, ongoing work without supervision, and a request for the contractor to adhere to safety protocols. Feedback is requested by May 18, 2023, for necessary actions to be taken.

Uploaded by

Shiela Fernando
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
141 views4 pages

HSE-Safety (Ref) - 2023-339 Non - Compliance To KIPIC Work Permit System & HSE Inspection # HSE-SAZ-2023-24-SIR-008

An internal memo from KIPIC highlights non-compliance with the work permit system during a hydrotesting activity by contractor M/s TSH J at Al Zour Refinery on May 3, 2023. Observations included the absence of a work permit, ongoing work without supervision, and a request for the contractor to adhere to safety protocols. Feedback is requested by May 18, 2023, for necessary actions to be taken.

Uploaded by

Shiela Fernando
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

o..lot5.1A.I I ~gji.+11 .::., u:Un.l.J ~cµJ I o.

5J-W-l I

KIPIC
aJ...o 11i..o.JI a.-b,lg_µ..!,-11
~g....5...J I JgJ-l...,-J I a...J..U...JJJg....D .::., tS_µ.u cS:L:l]
Kuwait Integrated Petroleum Industries Company
A Subsidiary of Kuwait Petroleum Corporation

Internal Memo

Date 04th May 2023 ,.,. WI


\,.~)

From Team Leader, Safety {Al Zour Refinery.L____ _ _ _ _ _ _ _ _ _ __ v.o


To Team Leader Ma·or Pro·ects I {Al Zour Refinery)_ _ _ _ _ _ _ __ ..svl
Ref. HSE /Safety {Re(~)/,_2_0_2~
3~/ 3_3_9 _ _ _ _ _ _ _ _ _ _ _ __ p-.,.o.11
Non - Compliance to KIPIC Work Permit system & HSE Inspection #
Sub. f,-o,-o.JI
HSE/SAZ/2023-24/SIR/008

Reference to the above subject, please be informed that on 03 May 2023, EPC contractor M/s
TSH J was carrying out hydrotesting activity for the RG line modification in Unit-21 heater
area and the following observations were noted:

1. There was no KIPIC work permit available for the said activity.
2. Contactors personnel were already carrying out the hydrotesting activity.
3. No supervision was available in the work area.

Hence, you are requested to highlight this observation to EPC Contractor and ensure that the
Contractor shall strictly complies with KIPIC Work permit system and its requirements within
KIPIC handed over areas.

Your feedback by 18th May 2023 will be highly appreciated.

This is for your kind information & further necessary action.

irza

~ /AMA/MS~

Attachments: HSE Inspection Report #(HSE/SAZ/2023-24/SIR/008)

Cc: Team Leader, Operations Area I - ZOR


File.

An ISO 9001:2015, ISO 14001:2015, ISO 45001:2018, ISO 50001:2018 & ISO 31000:2018 Certified Company
iil.olilAJ I Cl.,!-) gJl+l I 0 Ld..i..a.J.J Q,µ,!µj I iiSJ-W-11

KIPIC
a.l.o ~ I a..u
.. <;)~II
I ·; I
~g...5-J I Jgj...l..µ I Cl...l.lLWg._.o .::, 15_µ1 u~!
Kuwait Integrated Petroleum Industries Company
A Subsidiary of Kuwait Petroleum Corporation

Ref. # KJPIC/ ZOR/HSE/TS/1401-Rl


HSE INSPECTION REPORT- HSE/SAZ/2023-24/SIR/008

Location: Unit- 21 Date: 03.05.2023

Facility: Crude Distillation Unit Time: 09:45AM

Directorate: Al Zour Refinery Group: Team: Major Projects I

Project Title:

Contract No.:
Contractor: M/s TSH l
INSPECTED BY:

# Name KIPIC # Designation Team/ Group


1. Alaa Aladwani 1387 Safety Engineer Safety (Al Zour) / HSE

2. Mani Siva Shankar 50552 Safety Engineer Safety (Al Zour) / HSE

FACILITY PERSONNEL INVOLVED:


# Name KIPIC # Designation Team/ Group
1. Veera Venkatesh Safety Supervisor M/s TSH JV

FINDINGS FOR IMPROVEMENT

# Observation Recommendation Severity Action by

In compliance with Company


Unit - 21 - Observed M/s SBH employees under
1 High Immediate
the supervision of M/s TSH JV, engaged in Procedure for Work Permit System
Hydrotesting activities for the RG line pipe
Page 1 of 3
"\~I cil.ofil.a.JI o+Jg_µ.+JI ulcl.ic.J.J ~µJI a.5j.-WJI
. .~~~t~f
■.!!'.~.,,~ KIPIC a..+-l-,1g...5.J I Jg.J--l..µ I a....u.uug....o 0 l:SJ-llJ ,si..:i!
Kuwait Integrated Petroleum Industries Company

''"'
a.l.o l1i..oJ I fu.J I ·; I II
.. 9~ A Subsidiary of Kuwait Petroleum Corporation

modification using manual pump, manifold, and (KIPIC/HSE S&F/SA/17/006), EPC


hand tools in the heater area.
Contractor shall ensure strict
compliance KIPIC Work permit system
The following observations were noted:
and its requirements for any work
1. There was no KIPIC work permit available
activities that will be carried out in
for the said activity.
KIPIC handed over areas.
2. Contactors personnel were already
carrying out the hydrotesting activity.
3. No supervision was available in the work
area.

ACTION PLAN FOR GAPS OBSERVED {To be filled by Controlling Team)


# Actual Completion Status
Corrective Action Priority Target Date
Date (Open or Closed)

NUMBER OF FINDINGS
Findings for Improvement
Good Practices Total
Open Closed
0 1 0 1

Signature Alaa Aladwani


~ 03 May. 2023

Signature Mani Siva Shankar t-{-%~ 03 May. 2023

Page 2 of 3
a.J..ofil.o..11 a,µgJ4l I wl.cw::i..LI 0,µ,!~I ci.5.J-W-11

KIPIC
a.Lo l1i..oJ I fuJ
.. g~II
I ·; I
ii..µ.Jg....5..JI Jgµ..µ ! 6....J..u....wg.....o wlSJ....W ...si...:i!
Kuwait Integrated Petroleum Industries Company
A Subsid iary of Kuwait Petroleum Corporation

nvnno 'l'ES'l IN
1

JJUOGUESS
HEEP 1UfJtf