TRA of Sandblasting

The document is a task risk assessment for sandblasting and painting activities at Engineering Kinetics (Pvt.) Ltd., dated December 16, 2014. It outlines various hazards associated with the task, evaluates risks, and specifies actions to mitigate those risks, including the use of personal protective equipment and continuous monitoring. The assessment concludes with approval from team members, indicating that the safeguards in place are sufficient to reduce risks to an acceptable level.

Uploaded by

Irfan Khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
48 views

TRA of Sandblasting

The document is a task risk assessment for sandblasting and painting activities at Engineering Kinetics (Pvt.) Ltd., dated December 16, 2014. It outlines various hazards associated with the task, evaluates risks, and specifies actions to mitigate those risks, including the use of personal protective equipment and continuous monitoring. The assessment concludes with approval from team members, indicating that the safeguards in place are sufficient to reduce risks to an acceptable level.

Uploaded by

Irfan Khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

TASK RISK ASSESSMENT

Engineering Kinetics (Pvt.) ltd


TASK TITLE: Sandblasting and painting Date: 16-12-2014
Activity: Sand Blasting of Sheets/Spools TRA No. 007.EKL
Location: EKL Worshop
Description: Sandblasting and painting of Sheets/Spools
RISK
EVALUATION RESIDUAL

ALARP
HAZARD ACTION TO BE TAKEN
S/No.

Y/N
HAZARD (Refer to CONTROLS RISK
EFFECT Evaluation form)
S P R DESCRIBE ACTION MANPOWER S P R
1. PA
>Continuous monitoring of activities.
>Skilled personnel. Supervisor
Untrained Personnel >Adhere to Equipment Handling
>Use of standard manual (SPA)
1. Personnel Injury G 7 8 procedure. G 2 3 Y
handling technique. 2. Safety
>Ensure to barricade the area with
Supervisor
signage and barricade tape.
>GCM/Tool Box talk >Dead man handle shall not be modified,
/Task Briefing to be to avoid accident
conducted before >Blasting area shall be covered properly
Occupational starting activity. with tarpaulin.
Inhalation of dust
Illness with > Personal other then >Concerned workforce to wear blasting PA Supervisor
2. material G 8 9 G 2 3 Yes
respect to lungs specific job restricted. suit and protective shield for face and
>Waste materials neck
collected immediately protection.
and bagged. > Usage of inspected equipment
mandatory.
3. High Pressure Personnel F 5 7 >Safety pins & Whip >Hoses to be inspected and whip lash SPA: Sand F 2 4 Yes
Injury, Property Lashes at couplings / checked. Blasting,
loss connections. >Hose layout minimized and managed to Supervisor,
>Prior arrangement of reduce tripping hazards. Safety Watch
equipments & other >Grit blasting equipments certified &
related accessories. calibrated.
>Restrict unauthorized >Use of high pressure industrial hoses
movement of personnel according to pressure rating.
in job area. > Continuous Monitoring for any
>Pressure rating abnormality during pressure holding.
understanding by >Personal trained for positioning during
operator. Grit blasting.
>Experienced personal >Establish communication protocol to
involvement on switch OFF equipment in case of
hazardous job. emergency.
>Personal position
during grit blasting.
Equipment roll
Unsafe placement SPA: Sand
over, Hit Safe placement of Place the equipment at plane location,
of compressor with Blasting,
4. people, G 4 5 equipment, Barricaded. area barricaded. G 2 3 Yes
sand blasting Supervisor,
equipment
equipment Safety Watch
damage,
SPA: Sand
High Noise Poor audibility > Ear protection > Ensure use of ear plugs / ear muff. Blasting,
5.
Supervisor,
Safety Watch
Equipment roll
Unsafe placement Place the equipment at plane location, SPA: Sand
over, Hit Safe placement of
of compressor with area barricaded. Blasting,
6. people, G 4 5 equipment, Barricaded. G 2 3 Yes
sand blasting Supervisor,
equipment
equipment Safety Watch
damage,
Painting & Coating.
1. MSDS shall be provided for epoxy and
1. Personal other than their contents.
specific job restricted. 2. Concerned workforce to wear
Certified
Dizziness 2.Tool Box talk to be respiratory or dust mask
Painter
1. Vapor Inhalation lungs effected conducted prior to start 3. Drinking/eating in coating area is G 2 3 Yes
G 8 9 Safety
Suffocation of activity prohibited.
Supervisor
3. MSDS available on site 4. Use of cartridge Mask mandatory.
and clearly understood. 5. Ventilation plan cleared to person
prior start of job.
1. Use Rubber gloves 1. Use of suitable Gloves mandatory.
Separation 2. In case of skin contact, rinse affected
Thinner/Paint Storage areas with clean water and wash gently
Painting
Contact with body, 2. Tool Box Briefing to be with soap.
2. Injury Sup(SPA) G 2 3 Yes
Eye, Skin G 8 9 conducted before 3. Eye protection, appropriate safety
Safety Watch
starting activity. goggles.
3. Immediate rinsing in 4. Follow the instruction as mentioned in
area. the MSDS.
1. Area prohibited near 1. Fire extinguisher available in painting Painting
Hot Work activity area. area. Sup(SPA)
3. Fire Serious Injury E 6 9 E 2 5 Yes
2. Epoxy storage not 2. Fire watch deputed in area of job. Safety /Fire
onsite work location. 3. Housekeeping before and after job. Watch
GENERAL COMMENTS:
1. TBT will be conducted prior to start.
2. Unauthorized person are not allowed in work premises.
3. Safety watch man does his designated job.
4. Proper PPE is a must for sand blasting and painting crew.
5. Stand by vehicle with driver must be present at the site in case of emergency.
6. First Aid Box must be in place near the activity.
7. Housekeeping of the area must be done on prior basis.
RISK ASSISMENT APPROVAL
NAME OF TEAM MEMBERS I’m satisfied that the safeguard put in place will reduce the level of Risk to an acceptable level
Muhammad Asif (Project Manager) and the Task/Action is permitted to proceed.
Soba Khan (Sand Blasting ) Reviewed by: _________________________
Farhat Ali HITRA ( HSE Engineer)
Date: ________________________ Time: ____________________
Authorizing
S = Severity; P = Probability, R = Risk
Signatory: _______________ DATE: ________________