L8 Hotel Corridor - L8 - Blow Up Mock-Up Plans

The document outlines the review status of a construction drawing related to the Solaire North project, indicating that it has been reviewed by relevant consultants without relieving the Trade Contractor of their responsibilities. It includes details on various consultants involved, such as architectural, structural, and interior design firms, along with their contact information. The drawing title is 'Hotel Corridor & Lift Lobby Corridor Blow-Up Plan at Level 8', and it is intended for construction purposes.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
23 views2 pages

L8 Hotel Corridor - L8 - Blow Up Mock-Up Plans

The document outlines the review status of a construction drawing related to the Solaire North project, indicating that it has been reviewed by relevant consultants without relieving the Trade Contractor of their responsibilities. It includes details on various consultants involved, such as architectural, structural, and interior design firms, along with their contact information. The drawing title is 'Hotel Corridor & Lift Lobby Corridor Blow-Up Plan at Level 8', and it is intended for construction purposes.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

REVIEWED

The document has been reviewed by the relevant Consultant (s) and is accorded to the following status in
Sureste's Project Procedure for the action by the Trade Contractor.

A B C
Consultant review of this document does not relieve the Trade Contractor of its responsibilities under the
Trade Contract.

CONSULTANT MM / DD / YYYY

FE

0 FOR APPROVAL
REV. DATE DESCRIPTION

SURESTE PROPERTIES INC.


1, ASEAN AVENUE, ENTERTAINMENT CITY, TAMBO,
PARAÑAQUE CITY, PHILIPPINES

ARCHITECT OF RECORD:

CASAS + ARCHITECTS, INC.

T
Penthouse, Paseo Center, 8757
Paseo De Roxas Avenue, Salcedo
Village, Makati City

N
ARCHITECTURAL CONSULTANT:

I
AEDAS PTE LTD
The Metropolis Tower 2,
11 North Buona Vista Drive,
#12-07, Singapore 138589
T: +65 6734 4733
F:+65 67346233
www.aedas.com

R
STRUCTURAL CONSULTANT:

SY^2 + ASSOCIATES, INC.


9801 Kamgong St., cor.

CORRIDOR BLOW-UP PLAN

P
Baticulin St., Makati City
E: [email protected]
T: 893-4157 / 896-9760
/ 896-9755

MEPF CONSULTANT:
FORSSPAC

K
No. 117, 2nd Flr, Prince Bldg,
Rada Street, Legaspi Village,
Makati, Philippines
T:+632 310 5130
F:+632 310 5134
M:+63 928 500 4727

C
INTERIOR DESIGN CONSULTANT:

HABITUS

E
228 Pasong Tamo Ext.
(Chino Roces Ave.)
Makati Metro Manila Philippines
T: +63 920 974 4852

QUANTITY SURVEYOR:

CH TRADE CONTRACTOR:
ARCADIS
Level 5, Tower 6789, Ayala Avenue,
Barangay Bel-Air, Makati,
1226 Metro Manila, Philippines

2/F 111 Paseo Bldg., Paseo de Roxas Ave.,


Legazpi Village, Makati City 1229
Tel. Nos: (632) 841-0480 / (632) 842-8166
Fax No.: (632) 812-8155
E-mail Address: [email protected]

FE
EXIT
SOLAIRE NORTH
EDSA, VERTIS NORTH, QUEZON CITY, PHILIPPINES

PROJECT STAGE: FOR CONSTRUCTION DRAWING

EXIT
DISCIPLINE: ARCHITECTURAL

KEY PLAN

DO NOT SCALE DRAWINGS, VERIFY ALL DIMENSIONS ON SITE

-4 -2 3 5 6 8 11 13 15

N
L

DRAWING TITLE:

HOTEL CORRIDOR & LIFT LOBBY


CORRIDOR BLOW-UP PLAN AT LEVEL 8
(1 OF 2)
VICTOR B. TALICURAN
CIVIL ENGINEER

DESIGNED BY: VBT DATE DRAWN: 12-23-2022


CHECKED BY: GPD DATE REVISION:

CORRIDOR BLOW-UP PLAN APPROVED BY: VBT


DRAWING NO.: SOLN-SD-FIT-EEB-BC704-L8-10113 REV.:
SCALE: AS SHOWN
0
JOB NUMBER:

CAD FILE NAME:


*Copyrighted 2012 - Sureste Properties Inc. Manila, Philippines
REVIEWED
The document has been reviewed by the relevant Consultant (s) and is accorded to the following status in
Sureste's Project Procedure for the action by the Trade Contractor.

A B C
Consultant review of this document does not relieve the Trade Contractor of its responsibilities under the
Trade Contract.

CONSULTANT MM / DD / YYYY

FE

0 FOR APPROVAL
REV. DATE DESCRIPTION

SURESTE PROPERTIES INC.


1, ASEAN AVENUE, ENTERTAINMENT CITY, TAMBO,
PARAÑAQUE CITY, PHILIPPINES

ARCHITECT OF RECORD:

CASAS + ARCHITECTS, INC.

T
Penthouse, Paseo Center, 8757
Paseo De Roxas Avenue, Salcedo
Village, Makati City

N
ARCHITECTURAL CONSULTANT:

I
AEDAS PTE LTD
The Metropolis Tower 2,
11 North Buona Vista Drive,
#12-07, Singapore 138589
T: +65 6734 4733
F:+65 67346233
www.aedas.com

R
STRUCTURAL CONSULTANT:

SY^2 + ASSOCIATES, INC.


9801 Kamgong St., cor.

CORRIDOR BLOW-UP PLAN

P
Baticulin St., Makati City
E: [email protected]
T: 893-4157 / 896-9760
/ 896-9755

MEPF CONSULTANT:
FORSSPAC

K
No. 117, 2nd Flr, Prince Bldg,
Rada Street, Legaspi Village,
Makati, Philippines
T:+632 310 5130
F:+632 310 5134
M:+63 928 500 4727

C
INTERIOR DESIGN CONSULTANT:

HABITUS

E
228 Pasong Tamo Ext.
(Chino Roces Ave.)
Makati Metro Manila Philippines
T: +63 920 974 4852

QUANTITY SURVEYOR:

CH TRADE CONTRACTOR:
ARCADIS
Level 5, Tower 6789, Ayala Avenue,
Barangay Bel-Air, Makati,
1226 Metro Manila, Philippines

2/F 111 Paseo Bldg., Paseo de Roxas Ave.,


Legazpi Village, Makati City 1229
Tel. Nos: (632) 841-0480 / (632) 842-8166
Fax No.: (632) 812-8155
E-mail Address: [email protected]

J H
FE
H J J J J J
J SOLAIRE NORTH
EDSA, VERTIS NORTH, QUEZON CITY, PHILIPPINES

PROJECT STAGE: FOR CONSTRUCTION DRAWING

DISCIPLINE: ARCHITECTURAL

KEY PLAN

DO NOT SCALE DRAWINGS, VERIFY ALL DIMENSIONS ON SITE

-4 -2 3 5 6 8 11 13 15

J H J J
J
N

H L

J
H
J J J
H

J J F

DRAWING TITLE:

HOTEL CORRIDOR & LIFT LOBBY


CORRIDOR BLOW-UP PLAN AT LEVEL 8
(2 OF 2)
VICTOR B. TALICURAN
CIVIL ENGINEER

DESIGNED BY: VBT DATE DRAWN: 12-23-2022


CHECKED BY: GPD DATE REVISION:

CORRIDOR BLOW-UP PLAN APPROVED BY: VBT


DRAWING NO.: SOLN-SD-FIT-EEB-BC704-L8-10114 REV.:
SCALE: AS SHOWN
0
JOB NUMBER:

CAD FILE NAME:


*Copyrighted 2012 - Sureste Properties Inc. Manila, Philippines