REVIEWED
The document has been reviewed by the relevant Consultant (s) and is accorded to the following status in
Sureste's Project Procedure for the action by the Trade Contractor.
A B C
Consultant review of this document does not relieve the Trade Contractor of its responsibilities under the
Trade Contract.
CONSULTANT MM / DD / YYYY
FE
0 FOR APPROVAL
REV. DATE DESCRIPTION
SURESTE PROPERTIES INC.
1, ASEAN AVENUE, ENTERTAINMENT CITY, TAMBO,
PARAÑAQUE CITY, PHILIPPINES
ARCHITECT OF RECORD:
CASAS + ARCHITECTS, INC.
T
Penthouse, Paseo Center, 8757
Paseo De Roxas Avenue, Salcedo
Village, Makati City
N
ARCHITECTURAL CONSULTANT:
I
AEDAS PTE LTD
The Metropolis Tower 2,
11 North Buona Vista Drive,
#12-07, Singapore 138589
T: +65 6734 4733
F:+65 67346233
www.aedas.com
R
STRUCTURAL CONSULTANT:
SY^2 + ASSOCIATES, INC.
9801 Kamgong St., cor.
CORRIDOR BLOW-UP PLAN
P
Baticulin St., Makati City
E: [email protected]
T: 893-4157 / 896-9760
/ 896-9755
MEPF CONSULTANT:
FORSSPAC
K
No. 117, 2nd Flr, Prince Bldg,
Rada Street, Legaspi Village,
Makati, Philippines
T:+632 310 5130
F:+632 310 5134
M:+63 928 500 4727
C
INTERIOR DESIGN CONSULTANT:
HABITUS
E
228 Pasong Tamo Ext.
(Chino Roces Ave.)
Makati Metro Manila Philippines
T: +63 920 974 4852
QUANTITY SURVEYOR:
CH TRADE CONTRACTOR:
ARCADIS
Level 5, Tower 6789, Ayala Avenue,
Barangay Bel-Air, Makati,
1226 Metro Manila, Philippines
2/F 111 Paseo Bldg., Paseo de Roxas Ave.,
Legazpi Village, Makati City 1229
Tel. Nos: (632) 841-0480 / (632) 842-8166
Fax No.: (632) 812-8155
E-mail Address:
[email protected]FE
EXIT
SOLAIRE NORTH
EDSA, VERTIS NORTH, QUEZON CITY, PHILIPPINES
PROJECT STAGE: FOR CONSTRUCTION DRAWING
EXIT
DISCIPLINE: ARCHITECTURAL
KEY PLAN
DO NOT SCALE DRAWINGS, VERIFY ALL DIMENSIONS ON SITE
-4 -2 3 5 6 8 11 13 15
N
L
DRAWING TITLE:
HOTEL CORRIDOR & LIFT LOBBY
CORRIDOR BLOW-UP PLAN AT LEVEL 8
(1 OF 2)
VICTOR B. TALICURAN
CIVIL ENGINEER
DESIGNED BY: VBT DATE DRAWN: 12-23-2022
CHECKED BY: GPD DATE REVISION:
CORRIDOR BLOW-UP PLAN APPROVED BY: VBT
DRAWING NO.: SOLN-SD-FIT-EEB-BC704-L8-10113 REV.:
SCALE: AS SHOWN
0
JOB NUMBER:
CAD FILE NAME:
*Copyrighted 2012 - Sureste Properties Inc. Manila, Philippines
REVIEWED
The document has been reviewed by the relevant Consultant (s) and is accorded to the following status in
Sureste's Project Procedure for the action by the Trade Contractor.
A B C
Consultant review of this document does not relieve the Trade Contractor of its responsibilities under the
Trade Contract.
CONSULTANT MM / DD / YYYY
FE
0 FOR APPROVAL
REV. DATE DESCRIPTION
SURESTE PROPERTIES INC.
1, ASEAN AVENUE, ENTERTAINMENT CITY, TAMBO,
PARAÑAQUE CITY, PHILIPPINES
ARCHITECT OF RECORD:
CASAS + ARCHITECTS, INC.
T
Penthouse, Paseo Center, 8757
Paseo De Roxas Avenue, Salcedo
Village, Makati City
N
ARCHITECTURAL CONSULTANT:
I
AEDAS PTE LTD
The Metropolis Tower 2,
11 North Buona Vista Drive,
#12-07, Singapore 138589
T: +65 6734 4733
F:+65 67346233
www.aedas.com
R
STRUCTURAL CONSULTANT:
SY^2 + ASSOCIATES, INC.
9801 Kamgong St., cor.
CORRIDOR BLOW-UP PLAN
P
Baticulin St., Makati City
E: [email protected]
T: 893-4157 / 896-9760
/ 896-9755
MEPF CONSULTANT:
FORSSPAC
K
No. 117, 2nd Flr, Prince Bldg,
Rada Street, Legaspi Village,
Makati, Philippines
T:+632 310 5130
F:+632 310 5134
M:+63 928 500 4727
C
INTERIOR DESIGN CONSULTANT:
HABITUS
E
228 Pasong Tamo Ext.
(Chino Roces Ave.)
Makati Metro Manila Philippines
T: +63 920 974 4852
QUANTITY SURVEYOR:
CH TRADE CONTRACTOR:
ARCADIS
Level 5, Tower 6789, Ayala Avenue,
Barangay Bel-Air, Makati,
1226 Metro Manila, Philippines
2/F 111 Paseo Bldg., Paseo de Roxas Ave.,
Legazpi Village, Makati City 1229
Tel. Nos: (632) 841-0480 / (632) 842-8166
Fax No.: (632) 812-8155
E-mail Address:
[email protected] J H
FE
H J J J J J
J SOLAIRE NORTH
EDSA, VERTIS NORTH, QUEZON CITY, PHILIPPINES
PROJECT STAGE: FOR CONSTRUCTION DRAWING
DISCIPLINE: ARCHITECTURAL
KEY PLAN
DO NOT SCALE DRAWINGS, VERIFY ALL DIMENSIONS ON SITE
-4 -2 3 5 6 8 11 13 15
J H J J
J
N
H L
J
H
J J J
H
J J F
DRAWING TITLE:
HOTEL CORRIDOR & LIFT LOBBY
CORRIDOR BLOW-UP PLAN AT LEVEL 8
(2 OF 2)
VICTOR B. TALICURAN
CIVIL ENGINEER
DESIGNED BY: VBT DATE DRAWN: 12-23-2022
CHECKED BY: GPD DATE REVISION:
CORRIDOR BLOW-UP PLAN APPROVED BY: VBT
DRAWING NO.: SOLN-SD-FIT-EEB-BC704-L8-10114 REV.:
SCALE: AS SHOWN
0
JOB NUMBER:
CAD FILE NAME:
*Copyrighted 2012 - Sureste Properties Inc. Manila, Philippines