The document provides a Material and Consumables Cost Estimation Form for a building project, detailing various materials and their associated costs. It includes quantities and total costs for concrete, timber, metal roofing sheets, bricks, windows, and consumables like nails and paint. The total costs for each item are calculated based on unit prices and quantities specified.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
15 views1 page
5 - CPCCBC4004 - Appendix C
The document provides a Material and Consumables Cost Estimation Form for a building project, detailing various materials and their associated costs. It includes quantities and total costs for concrete, timber, metal roofing sheets, bricks, windows, and consumables like nails and paint. The total costs for each item are calculated based on unit prices and quantities specified.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1
CPCCBC4004
Appendix C: Material and Consumables Cost Estimation Form
Template
Material and Consumables Cost Estimation Form
Class of the building
Materials Quantity Cost per unit Total cost
20 cubic $150 per cubic
Concrete (Mpa25 for slab) $3,000 meters meter 300 linear Timber (90 x 45 mm framing) $5 per meter $1,500 meters 120 square $25 per square Metal Roofing Sheets $3,000 meters meter Bricks (Standard clay bricks) 10,000 units $0.60 per brick $6,000
Windows (Double-glazed) 10 units $300 per window $3,000
Consumables Quantity Cost per unit Total cost
Nails 10 kg $10 per kg $100
Paint (Interior, 10L buckets) 5 buckets $60 per bucket $300