Property Manage
PERMIT TO WORK (HOT WORK/ EXCAVATION/ ENTRY INTO
CONFINED SPACE/ WORK AT HEIGHT/ CRANE HOIST
OPERATION/ ISOLATION/CONNECTION OF LIFE SAFETY
SYSTEMS/ WORK ON OR NEAR UNPROTECTED ENERGIZED
SYSTEMS OR EQUIPMENT)
Property Management – Fit out
Date submitted:
1/24/2025
Task Performer:
BMTS
Task Location: GD-04 L-01
Task Description: fire alarm system isolation been scheduled on 25th Jan 2025 to 30th Jan 2025 at DIFC Fund center
Date of Work: From 25/01/2025 08:00(hrs) To 30/01/2025 06:59(hrs)
Tenant Name: DIFC Investments Ltd.
Tenant Location:
- The isolation to affect only the particular FACP of the unit and other tenants shall not be affected
by the task during business hours.
- Works to be done by BMTS & ensure proper coordination for successful process.
Affected Tenant(s):
- MSRA should be implemented accordingly with competent supervision.
Fire warden to monitor the site during the period when both systems are in isolation.
Important Notes:
1. For isolation/connection of life safety systems, the contractor must submit this form to FOSP prior to the starting date of
the planned works (three (3) working days for all requests, except for electrical connection/disconnection which needs
to be submitted five (5) working days prior to planned date).
2. If the Tenant is operating from the leased premises during the period of fit-out works (Type C Major/Minor fit-out), the
Tenant’s Contractor confirms that the requirement of service isolation/connection has been coordinated with and
approved by the Tenant.
3. For hot works, excavation, entry into confined space, work at height, crane hoist operation and work on or near
unprotected energized system/equipment, the contractor must submit this form to FOSP two (2) working days prior to
starting the planned works.
4. Others (please specify):
_____________________________________________________________________________________
_____________________________________________________________________________________
Approved By:
CONFIDENTIALITY NOTICE and DISCLAIMER – This document and any attachment are confidential and may be privileged or otherwise protected from
disclosure and solely for the use of Dubai International Financial Centre Authority. No part of this document may be copied, reproduced, or transmitted in any form
or by any means without written permission.
Document Control No. Document Classification: Document Updated on: Date / Frequency of Review: 24/01/2025 11:15 Page
DIFC-FT-FO-18 Rev. 07 Public 01 March 2021 As Required Uncontrolled copy if printed 1 of 2
Property Manage
PERMIT TO WORK (HOT WORK/ EXCAVATION/ ENTRY INTO
CONFINED SPACE/ WORK AT HEIGHT/ CRANE HOIST
OPERATION/ ISOLATION/CONNECTION OF LIFE SAFETY
SYSTEMS/ WORK ON OR NEAR UNPROTECTED ENERGIZED
SYSTEMS OR EQUIPMENT)
Property Management – Fit out
Musab Hadrab
FOSP
(Name and Stamp)
Date 24/01/2025
CONFIDENTIALITY NOTICE and DISCLAIMER – This document and any attachment are confidential and may be privileged or otherwise protected from
disclosure and solely for the use of Dubai International Financial Centre Authority. No part of this document may be copied, reproduced, or transmitted in any form
or by any means without written permission.
Document Control No. Document Classification: Document Updated on: Date / Frequency of Review: 24/01/2025 11:15 Page
DIFC-FT-FO-18 Rev. 07 Public 01 March 2021 As Required Uncontrolled copy if printed 2 of 2