The extruded Aluminum Sections of Alloy 6063 T6 and tolerances, flatness, twist, bend and angularity
conforming to DIN standard from approved extruder. All the visible surfaces shall have Powder Coating with a
minimum thickness of 60 to 80 microns, shade shall be as per Clients and Architect requirement. The non
visible aluminum surfaces shall have minimum chromotizing treatment.
Fabricating and supplying Mild Steel YST 310 Mpa. (Hot Dip Galvanized 80 microm) Brackets to
accommodate 3 Dimensional movement for achieving perfect verticality and proper fixing of structural
glazing system with the RCC / structural steel framework of building structure, using T Bolts, Teflon separator
to prevent bimetallic contacts with nuts and washers etc. of Stainless Steel Grade 316, of the required
capacity and in required numbers.
The rate shall include closure of 1.5 mm Aluminum flashing of the Glazing End, termination & floor ceiling
closure and also office partition wall gap, 90 degree corner joint, all in line with the Tender Drawing. The
Flashing fixed with the help of Aluminium Cleat by SS pan head screw all in line with the Tender Drawing. All
the visible surfaces shall have Powder Coating with a minimum thickness of 60 to 80 microns, shade shall be
as per Clients and Architect requirement. Rate shall include necessary non visible GI 0.8 mm thick primary
seal for closing the gap between system & wall / clamps / brackets, fastening straps, Screws, rivets, washers
and other fastening materials shall be in stainless steel grade 316. Gap between RCC & flashing filled with
Backer rod & Weather Sealant (DC 991)/ GE(SCS-9000NB)of approved make.
The quote rate shall include all Scaffolding and statutory obligations and safety code compliance as per client.
A.2 SPANDREL TREATMENT for RCC Slab, Extra Over and above Cost Item No. A.1
Supply, fabrication and fixing of GI Tray 50mm back fold periphery of the tray and tray locked with screw
along with mullion/stack head and Spandrel Insulation make Glasswool insulation of 50 mm thick 48 kg/m3
density slab with side factory laminated 50 gsm black/grey veil of 0.5 mm, firmly held on the Powder
Coating GI tray of 1 mm thick using adhesive GI locking pin and glue. The insulation material shall comply
with IS 8183 standard & shall have thermal conductivity 0.030 W/m.K at 25 degree mean temperature. SQ.M. 730.0
The assembly is kept atleast 50mm away from the Glass surface. Quote rate for DC 789/GE-3600 Weather
Sealant for sealing the gap between the GI tray and Aluminium Profile. Powder Coating color / shade as per
Architect/Client requirement.
A.3 TOP HUNG WINDOW, Extra over and above cost item no. A.1
Supply, Fabrication, Installation, Protection, Cleaning & Handover of Top Hung Window. Outer frame and
Shutter panels shall be Top hung openable with minimum four point locking system with Friction type hinges
(Heavy Dutty), Stay arm (Window opening will be restericted to 15 deg.) and necessary hardware of SQ.M. 405.0
approved make (Cotsworld/GU/Geiesse) (The quote rate shall be include Window Framing profile, Hardware
and Accessories) Openable Window.
A.4 FIRE STOP TREATMENT, Extra over and above cost item no. A.1
Fire Stop Siderise the continuous gap between the façade and the concrete slab edge is to be filled with
approved fire-rated insulation compressed to the manufacturers’ recommendations and/or other relevant
Authority approved.
Mineral fibre insulation material & intumescent sealant with a 2-hour fire resistant period (Integrity and
Insulation) or equivalent to the rating of the floor slab. Compliance to BS 476 Part 20 or ASTM E 119 when
tested to EN 1364 Part 4 or ASTM E 2307 respectively. To provide manufacturer's engineering judgements for
site specific conditions and compliance. The thickness of the safing shall be 120 mm minimum top to bottom
and Minimum 80kg/m3 density rock fibre insulation compressed at site as per manufacturer
recommendation and testing standards.
Rmt. 1700.0
Fire-stop that is in multiple pieces (width smaller than that supplied by the manufacturer) will not be
accepted.
The installation shall be in accordance with the manufacturer recommendation and testing standards.
Provide impaling clips configured as per fire stop manufacturer’s requirements except as noted herein.
Impaling clips shall be fastened to floor slab.
Galvanized sheet shall be min. 1.5mm thick galvanized sheet, with sealed overlaps and interfaces for
bearing the screed load.
A.5 SINGLE LEAF ALUMINIUM FRAME DOOR, Extra over and above cost item no. A.1
Design, Supply, fabrication, Installation and Handover Single leaf Framed Door opening outward comprising
DGU Glass with handle with Lock (Make Cotswold/G-U/ Giesse) as approved by Architect and Client. The
System shall be Designed to withstand Wind Pressure of 1.46kpa. System consist of Aluminum outer, Shutter
& Beading Profiles, all in line with Tender Drawing. Hinges Shall be Butt Hinges, Door Handle, Door lock,
corner clites & Door closer with Approved make. The Door Accessories includes the wool pile, Epdm Gaskets
all in line with the Tender Drawing. All exposed Aluminum profiles shall be Powder Coating with 60 to 80 SQ.M. 26.0
microns, shade shall be as per Clients and Architect requirement. The non visible Aluminum Surfaces shall
have minimum chromatizing treatment. Provide exterior perimeter sealants with Dow Corning DC
991/GE(SCS-9000 NB), where these System abuts other adjacent materials such as concrete shear walls. The
quote rate shall include all design, engineering, shop drawing approval from Architect & consultant,
Scaffolding and statutory obligations and safety code compliance as per client.
A.7 ACP SHEET CLADDING for COPPING Extra over and above cost item no. A.1
Design, Supply, Fabrication, Installation, Protection, Cleaning and Handover of ACP Cladding comprises of
4mm Thk. Aluminium composite panels (ACP) FR Grade B1 cladding system of approved shade & make fixed
on to the Extruded aluminium section framing mechanically fixed on the MS Structure/RCC slab & beam the
help of SS 316 grade Anchor fastener, nut bolt, screws, rivets MS HDG Bracket & Material Separator all in
line with Tender Drawing. Fabricated Aluminium Composite Panels (ACP) with grooving and bending along
with corner cleats are mechanically fixed to the aluminium framing using extruded aluminium cleats and SQ.M. 7.0
stainless steel 316 grade screws. The horizontal joints are to be sealed with weather silicone (DC 991) of
approved make. Rate shall included 0.8mm thick GI Primary seal should be fixed on Copping/Horizontal band
cladding top & front facia all complete in line with tender drawing. Rate shall include 18MM thick Bison
Cement Board below the copping ACP sheet.(the system must pass the proof test at 1.5 times designed wind
pressure without any failure, permanent deformation)
Quote rate include Aluminium composite panels of approved colour/Make and the panel shall be of 4mm
thick aluminum composite panel material consisting of 3mm thick FR grade mineral based polymer core with
minimum 72% inorganic (2 hrs Fire resistance as per ASTM E119-12 and Class - B s1 d0 as per EN13501-1 and
sandwiched between two Aluminum coated sheets (each 0.5mm thick of Alloy grade of AA3105). The
aluminum composite panel cladding sheet shall be coil coated, with Kynar 500 based/Hylar 5000 PVDF /
Exterior Grade compliance to AAMA2605 based fluoropolymer resin lead free coating of approved colour
and shade on face 1 and polymer (Service) coating on face 2 with overall weight of not less than 7.6 kg per
Sqm. The manufacturer should be having all the required test equipment’s (yearly calibrated from NABL
accredited Lab) for providing Technical Data Sheet mentioning the required Technical Parameters for Quality
Check of all the batches supplied and OEM should have valid F.P.C (Factory Production control) Certificate on
Reaction to fire as per Class B1.
A.8 GLASS SPECIFICATION FOR VISION & SPANDREL AREA, (Extra over and above cost item no. A.1)
DGU GLASS - 6MM THICK PERFORMANCE GLASS Heat Strength + 12MM AIR GAP + 6MM THICK CLEAR GLASS Heat
Strength, ( Shade as per Architect & Client requirement) SQ.M. 4735.0
Glass Parameters:- VLT 30% to 40%, IR-10%, ER-15%, SHGC 0.3 , U value 1.8
B FLOOR TO FLOOR STRUCTURAL UNITISED GLAZING SYSTEM, Wall Type - WT-02 (Office Area)
The scope of work is to Design & Supply for complete Unitized Structural Glazing System (for Male – Female
Mullions) of Three barrier system of approved make. The system should support / hold Glass of approved
make having main frame work consisting Mullions, Transom and Clip Profiles of extruded sections. all in line
with Tender Drawings and fixed at all levels, elevation and heights. The system shall withstand the Wind
Pressure of 1.46 KPa conforming to IS 875 Part III and the system shall pass the proof test at 1.5 times
designed wind pressure. The Systems shall be completely pre-fabricated / pre-assembled units with glazed
panels at factory. The installation of the fixed frames, channels and brackets to be carried out at site. The
Extruded section shall be 6063 T6 Alloy or BSH9 conforming to IS-63400. Contractor rate shall exclude cost of
anchor fastener, for fixing Unitised Panel at height/place.
Adhesive tape shall be of Open PU cell type ±35 - 40 Shore hardness. All the joints horizontal or vertical inside
and outside should be properly sealed with weather sealants (Non Stain & Non-bleed) during the installation.
Sealant shall be Dow Sill Structural sealant DC -983/GE(SSG-4400-2 part), Weather Silicone DC-991/GE(SCS-
9000NB ).
Providing and Fixing Ethylene Propylene Dinine Monomer (EPDM) Gaskets as weather strip and barrier to
ensure water and air tightness. Weather strip shall be EPDM Gaskets with Hardness (5 second) shore A with a
typical value not less than 65, ultimate tensile strength of 70 (+/- 10%) Kg/Sq.cm and ultimate elongation of
250% (+/- 10%).
The extruded Aluminum Sections of Alloy 6063 T6 and tolerances, flatness, twist, bend and angularity
conforming to DIN standard from approved extruder. All the visible surfaces shall have Powder Coating with a
minimum thickness of 60 to 80 microns, shade shall be as per Clients and Architect requirement. The non
visible aluminum surfaces shall have minimum chromotizing treatment.
Fabricating and supplying Mild Steel YST 310 Mpa. (Hot Dip Galvanized 80 microm) Brackets to
accommodate 3 Dimensional movement for achieving perfect verticality and proper fixing of structural
glazing system with the RCC / structural steel framework of building structure, using T Bolts, Teflon separator
to prevent bimetallic contacts with nuts and washers etc. of Stainless Steel Grade 316, of the required
capacity and in required numbers.
The rate shall include closure of 1.5 mm Aluminum flashing of the Glazing End, termination & floor ceiling
closure and also office partition wall gap, 90 degree corner joint, all in line with the Tender Drawing. The
Flashing fixed with the help of Aluminium Cleat by SS pan head screw all in line with the Tender Drawing. All
the visible surfaces shall have Powder Coating with a minimum thickness of 60 to 80 microns, shade shall be
as per Clients and Architect requirement. Rate shall include necessary non visible GI 0.8 mm thick primary
seal for closing the gap between system & wall / clamps / brackets, fastening straps, Screws, rivets, washers
and other fastening materials shall be in stainless steel grade 316. Gap between RCC & flashing filled with
Backer rod & Weather Sealant (DC 991)/ GE(SCS-9000NB)of approved make.
The quote rate shall include all Scaffolding and statutory obligations and safety code compliance as per client.
B.2 TOP HUNG WINDOW, Extra over and above cost item no. B.1
Supply, Fabrication, Installation, Protection, Cleaning & Handover of Top Hung Window. Outer frame and
Shutter panels shall be Top hung openable with minimum four point locking system with Friction type hinges
(Heavy Dutty), Stay arm (Window opening will be restericted to 15 deg.) and necessary hardware of SQ.M. 25.0
approved make (Cotsworld/GU/Geiesse) (The quote rate shall be include Window Framing profile, Hardware
and Accessories) Openable Window.
B.3 SINGLE LEAF ALUMINIUM FRAME DOOR, Extra over and above cost item no. B.1
Design, Supply, fabrication, Installation and Handover Single leaf Framed Door opening outward comprising
DGU Glass with handle with Lock (Make Cotswold/G-U/ Giesse) as approved by Architect and Client. The
System shall be Designed to withstand Wind Pressure of 1.46kpa. System consist of Aluminum outer, Shutter
& Beading Profiles, all in line with Tender Drawing. Hinges Shall be Butt Hinges, Door Handle, Door lock,
corner clites & Door closer with Approved make. The Door Accessories includes the wool pile, Epdm Gaskets
all in line with the Tender Drawing. All exposed Aluminum profiles shall be Powder Coating with 60 to 80 SQ.M. 20.0
microns, shade shall be as per Clients and Architect requirement. The non visible Aluminum Surfaces shall
have minimum chromatizing treatment. Provide exterior perimeter sealants with Dow Corning DC
991/GE(SCS-9000 NB), where these System abuts other adjacent materials such as concrete shear walls. The
quote rate shall include all design, engineering, shop drawing approval from Architect & consultant,
Scaffolding and statutory obligations and safety code compliance as per client.
B.4 GLASS SPECIFICATION FOR VISION,SPANDREL,DOOR AREA(Extra over and above cost item no. B.1)
DGU GLASS - 6MM THICK PERFORMANCE GLASS Heat Strength + 12MM AIR GAP + 6MM THICK CLEAR GLASS Heat
Strength, ( Shade as per Architect & Client requirement) SQ.M. 495.0
Glass Parameters:- VLT 30% to 40%, IR-10%, ER-15%, SHGC 0.3 , U value 1.8
DGU GLASS - 6MM THICK PERFORMANCE GLASS Heat Strength + 12MM AIR GAP + 6MM THICK CLEAR GLASS Heat
Strength, ( Shade as per Architect & Client requirement) SQ.M. 495.0
The scope is to Design, Supply, Fabrication, Installation, Protection, Cleaning and Handover of Conventional
Curtain wall system designed to withstand a Design wind pressure of 1.46 Kpa conforming to IS 875 Part-lll
(the system must pass the proof test at 1.5 times designed wind pressure without any failure, permanent
deformation) and fabricated fixed at all levels, elevation & heights. The Glass panels will be mechanically
supported to the Aluminium main frame with pressure plate & cover cap from both side and fixed onto
mullions and transoms with all approved standard accessories and hardware’s of approved make all in line
C.1 with the Tender Drawing, Mullion vertical & Tronsom horizontal cap (20mm x 61mm) Rate shall include Sq.mtr. 115.0
Aluminium Adoptor /Tube with Accenssories of SS 316 Grade all in line with the Tender Drawing. Rate shall
include fixing of the main frames to RCC with necessary HDG MS bracket, fastening straps, nuts, bolts, rivets,
washers and other fastening materials shall be in stainless steel grade 316 all in line with Tender Drawing.
Rate shall include Microwave Cured EPDM / Neoprene barrier. Complete for a full proof system all in line
with Tender Drawing.
Providing and Fixing Ethylene Propylene Dinine Monomer (EPDM) Gaskets as weather strip and barrier to
ensure water and air tightness. Weather strip shall be EPDM Gaskets with Hardness (5 second) shore A with a
typical value not less than 65, ultimate tensile strength of 70 (+/- 10%) Kg/Sq.cm and ultimate elongation of
250% (+/- 10%).
Fabricating and supplying Mild Steel (Hot Dip Galvanized upto 80 microm thick) Brackets to accommodate 3
Dimensional movement for achieving perfect verticality and proper fixing of structural glazing system with
the RCC / masonry / structural steel framework of building structure, using stainless steel Grade 316 anchor
fasteners ( Klimas/Hilti or Equivalent ) / bolts, Teflon separator to prevent bimetallic contacts with nuts and
washers etc. of stainless steel Grade 316, of the required capacity and in required numbers. Contractor rate
shall included HDG MS Insert box tube in the mullion as per structural requirement weight/kg below
separete item no. B.2, Also rate shall included 12mm thick bison cement board with insulation from
inside/outside at top of the glazing. All complete in line with tender drawing.
The extruded Aluminum Sections of Alloy 6063 T6 and tolerances , flatness, twist , bend and angularity
conforming to DIN standard from approved extruder. All aluminium Mullion/Transom/Adaptore shall have
powder coating 60 to 80 microns, as per approved by Clients and Architect. The non visible aluminum shall
have minimum chromatizing treatment.
The rate shall include closure of 1.5 mm Aluminum visible and non visible 1mm thick GI primary seal with
Insulation at periphery of the Glazing and End closure with wall/column all in line with the Tender Drawing.
The Flashing fixed with the help of Aluminium Cleat by SS pan head screw all in line with the Tender Drawing.
All the visible surfaces shall have Powder Coating with a minimum thickness of 60 to 80 microns, shade shall
be as per Clients and Architect requirement. Rate shall include necessary clamps / brackets, fastening straps,
Screws, rivets, washers and other fastening materials shall be in stainless steel grade 316. Gap between RCC
& flashing filled with Backer rod & Weather Sealant (DC 991) of approved make.
The quote rate shall include all design, engineering, shop drawing approval from Architect & consultant,
Scaffolding and statutory obligations and safety code compliance as per client.
DOUBLE LEAF PATCH FITTING DOOR (Extra over and above cost item no. C.1)
Supply, Fabrication, Installation, Protection, Cleaning & Handover of Patch fitting Framless Double leaf
Door fitted with floor spring, pivot, lock set at bottom, handle ( 25 mm dia. and c/c 1000 mm ) or any other
hardware requirement to complete the assembly. All the hardware and accessories shall be of Ozone or
C.2 equivalent make as approved by Architect. All the assembly for the door shall be designed to windstand all Sq.mtr. 8.00
the load and as recommended by the supplier. The Contractor must quote rates accordingly. Contractor rate
shall include excess control system at entrance door with require accessories and electrical wiring as per
client /Architect guideline / intrcution
Design, Supply, Fabrication, Installation, Protection, Cleaning & Handover of Aluminum Semi Unitized
Structural Glazing System to support / hold Glass of approved make having main frame work of Mullions and
Transoms and Sash sections of Designed extruded sections to withstand a Wind Pressure of 1.46 kpa
conforming to IS 875 part III (the system must pass the proof test at 1.5 times designed wind pressure
without any failure, permanent deformation) and fabricated fixed at all levels, elevation & heights. Extruded
D.1 section shall be of 6063 T6 Alloy or BSH9 conforming to IS-63400. Rate shall include fixing of the main Sq.mtr. 55.00
frames to RCC/Steel Structure with necessary clamps / brackets, fastening straps, nuts, bolts, rivets, washers
and other fastening materials shall be in stainless steel grade 316. Rate shall include Microwave Cured
EPDM / Neoprene barrier, approved silicon sealant of recommended grade from DOW Sill (DC 991) Weather
Silicone and Structural Silicone (DC 995) complete for a full proof system all in line with Tender Drawing.
Adhesive tape shall be of Open PU cell type ±35 - 40 Shore hardness. All the joints horizontal or vertical inside
and outside proper sealed with weather sealants (Non Stain & Non-bleed) during the installation. Sealant
shall be Dow Sill Structural sealant DC -995, Weather Silicone DC-991.
Providing and Fixing Ethylene Propylene Dinine Monomer (EPDM) Microwave cured Gaskets as weather strip
and barrier to ensure water and air tightness. Weather strip shall be EPDM Gaskets with Hardness (5 second)
shore A with a typical value not less than 65, ultimate tensile strength of 70 (+/- 10%) Kg/Sq.cm and ultimate
elongation of 250% (+/- 10%).
Fabricating and supplying Mild Steel (Hot Dip Galvanized upto 80 to 100 microm thick) Brackets to
accommodate 3 Dimensional movement for achieving perfect verticality and proper fixing of structural
glazing system with the RCC / masonry / structural steel framework of building structure, using stainless steel
Grade 316 anchor fasteners ( Hilti or Equivalent) / bolts, Teflon separator to prevent bimetallic contacts with
nuts and washers etc. of stainless steel Grade 316, of the required capacity and in required numbers.
The extruded Aluminum Sections of Alloy 6063 T6 and tolerances , flatness, twist , bend and angularity
confirming to DIN standard from approved extruder. All the visible surfaces shall have Powder Coating with
thickness of 60 to 80 microns. The non visible aluminum surfaces shall have minimum chromatizing
treatment.
Drained joint system which shall be 100% water-tight allowing no water to penetrate into the interior of the
building. The system shall be designed such that water being drained in the system shall not cause any
damage to the permanent works.
The Quote rate shall include 1.5mm thk. Aluminium Flashing with Aluminium Z angle cleat, Insulation & 1
mm GI Continuous flashing at Periphery with necessary fixing Accenssories of approved make all in line
with the Tender Drawing to Protect against the Water Drainage & fill the gap between RCC & System. Rate
shall include necessary Screws, nuts, bolts, rivets, washers and other fastening materials shall be in stainless
steel grade 316. All the visible surfaces shall have FEVE Coating thickness of 60 to 80 microns, shade shall
be as per Clients and Architect requirement.
MILD STEEL, for Canopy,Extra over and above cost item no.D.1
Rate shall include Design, supply & installation MS structure fixed the RCC beam /Slab Structure for fixing
Canopy System. All extruded Mild steel sections shall comply to IS 2062 Grade A and shall be coated with
antirust primer with Epoxy Paint. The MS support structure shall be designed for complete Wind load, Dead
load and Live Load. All sections shall be Tata sections with YST (Yield Strength) 310MPa OR Equivalent. Rate
shall include necessary base plate / brackets, fastening straps, nuts, bolts, rivets, washers, Neoprene barrier,
D.2 Thermal Isolator and other fastening materials shall be in stainless steel grade 316. all Anchor fastener Kg. 1,000.00
should be SS grade 316 Make- Klimas/Hilti. The steel structure shall be finish with the following,
i. Surface Preparation – Blast cleaned to Sa 2.5 conforming to BS EN ISO 8501-1
ii. Primer : Zinc Rich Epoxy 100 micron
iii. Barrier : Epoxy 175 micron
iv.Finish Polyurethane-50 micron
Design, Supply, Fabrication, Installation, Protection, Cleaning and Handover of Aluminium Horizotal 'Z' type
Louvers of with equal c/c spaced fixed. Louver Profile shall be fixed on RCC beam by Aluminium tube with the
help of MS Bracket (HDG 80 to 100 micron) all in line with the Tender Drawing. The System shall be with
stand wind pressure of 1.46 Kpa conforming to IS 875 Part-lll. MS bracket shall be fix to RCC / MS strucure
with the help of Anchor fasteners ( Klimas/Hilti ) of stainless steel Grade 316. Rate shall include fixing of the
E.1 main frames to RCC/Steel Structure with necessary clamps / brackets, fastening straps, nuts, bolts, rivets, SQ.M. 200.00
washers and other fastening materials shall be in stainless steel grade 316. Rate shall include approved silicon
sealant of recommended grade from Dow Sill (DC 991) to fill gap between Louver & other cladding material
all in line with the Tender Drawing. the Contractor rate shall include MS insert HDG finish to maintain
structural strenght of vertical mullion unsupported height 4350mm.
The extruded Aluminum Sections of Alloy 6063 T6 and tolerances , flatness, twist , bend and angularity
conforming to DIN standard from approved extruder. All the visible surfaces of Louvers & system shall have
FEVE Coating with a minimum thickness of 60 to 80 microns, shade shall be as per Clients and Architect
requirement. The non visible aluminium surfaces shall have minimum chromatizing treatment.
The quote rate shall include all design, engineering, shop drawing approval from Architect & consultant,
Scaffolding and statutory obligations and safety code compliance as per client.
F ALUMINIUM VENTILATION WINDOW & FIRE RATED FIXED WINDOW, Wall Type - WT-06
ALUMINIUM VENTILATION WINDOW
Design, Supply, Fabrication, Installation, Protection, Cleaning and Handover of Aluminium Louvers of "Z"
shape and equally spaced and Overlapping to prevent water entring inside. Louvers shall be supported on
Outer Frame with Aluminium Flat Bar using all in line with the Tender Drawing. Rate shall Exclude Exhaust
Fan for ventilation with necessary accessories. All exposed Aluminium profiles shall be powder coating and
shade shall be as per Architect's and Client approval. The non Visible Aluminium Profile shall have minimum
Chromatizing. The window shall be sealed to the host structure and not adjoining materials with approved
water proofing membrane. The System shall be designed to withstand wind pressure of Maximum 1.46 Kpa
F.1 confirming to IS -875 part III (the system must pass the proof test at 1.5 times design wind pressure) at all SQ.M. 3.00
levels, elevation & heights. All screws, washers used shall be only Stainless Steel of 316 grade. Provide
exterior perimeter Weather sealants with Dow Corning DC 991 or equivalent where the glazing abuts other
adjacent materials such as concrete shear walls. The contractor must design the system as per the prevalent
site conditions and building elevation profiles. No extra claims shall be entertained at any stage for
aluminium profile / sheet wall thickness and size dimensions. Quote in compliance with Drawings & schedule
and specifications noted herein including cleaning.
The extruded Aluminum Sections of Alloy 6063 T6 and tolerances , flatness, twist , bend and angularity
conforming to DIN standard from approved extruder. All the visible surfaces of Louvers & system shall have
Powder Coating with a minimum thickness of 60 to 80 microns, shade shall be as per Clients and Architect
requirement. The non visible aluminium surfaces shall have minimum chromatizing treatment.
The quote rate shall include all design, engineering, shop drawing approval from Architect & consultant,
Scaffolding and statutory obligations and safety code compliance as per client.
Design, Supply, Fabrication, Installation, Protection, Cleaning & Handover of Fire Rated Window frame fitted
with SS hardware requirement to complete the assembly. The glass should be of SCHOTT TM (Germany)
PYRAN® Fusion make and 11 mm thick, non-wired, heat-treated with 20 minutes’ insulation and 120 minutes’
stability, integrity and radiation control. And light transmission of 89% in accordance to EN 1363 and EN 1364.
The glass should be compliant to Class A category of Impact Resistance as per BS 6206: 1981 and 1(B)1
category as per EN 12600 and meet the requirements of statutory accident insurance as well as the Health
F.2 and Safety at Work Act. The glass should be held in place with the help of steel beading as per the test Sq.mtr. 25.00
evidence. The maximum glazing size should not be more than the maximum tested size as per the test
certificate. The glass should be tested from Spectro/CBRI Roorkee/Warrington’s Fire Research
Laboratory/Applus Spain with CE certification/approved NABL accredited lab or by any other accreditation
body which operates in accordance with ISO/IEC 17011 and accredits labs as per ISO/IEC 17025 for testing
and calibration scope shall be eligible for glass as per BS-EN 1364-1:1999/BS476 Part 2/EN 13501-2: 2003 & IS
3614 Part II.
The profiles are manufactured from galvanized steel sheets pressed formed to an insulated profile as per test
evidence. The profile has to be Fixed to the supporting construction by means of
The glass should be held in its place with the help of steel beading of minimum 1.50 mm thickness which can
be clamped or bolted to the profile by 4 mm X 35mm steel screws at every 250 mm c/c and a special Kerafix
2000 tape from Rolf Kuhn of the cross section of 2mm X 13mm as per the test evidence. The glass panes are
to be supported on noncombustible 5 mm calcium silicate setting blocks. tested size as per the test report.
Contrator rate shall include 11mm thick Fire proof glass as per above Specification.
Design, Supply, Fabrication, Installation, Protection, Cleaning and Handover of Aluminium Vertical Louvers of
(70mm x 38mm x 2mm thk.) with equal c/c spaced fixed. Louver Profile shall be fixed on MS Structure /RCC
beam by Aluminium angle with the help of MS Angle Bracket (HDG 80 to 100 micron) all in line with the
Tender Drawing. The System shall be with stand wind pressure of 1.46 Kpa conforming to IS 875 Part-lll. MS
bracket shall be fix to RCC / MS strucure with the help of Anchor fasteners ( Klimas/Hilti ) of stainless steel
G.1 Grade 316. Rate shall include fixing of the main frames to RCC/Steel Structure with necessary clamps / Sq.mtr. 480.00
brackets, fastening straps, nuts, bolts, rivets, washers and other fastening materials shall be in stainless steel
grade 316. Rate shall include approved silicon sealant of recommended grade from Dow Sill (DC 991) to fill
gap between Louver & other cladding material all in line with the Tender Drawing. Rate shall include
aluminium bird mesh behind the louvers with neccessary aluminium cleat / framing fixed by SS 316 screw all
in line with the Tender Drawing.
The extruded Aluminum Sections of Alloy 6063 T6 and tolerances , flatness, twist , bend and angularity
conforming to DIN standard from approved extruder. All the visible surfaces of Aluminium shall have FEVE
Coating with 60 to 80 microns, shade shall be as per Clients and Architect requirement. The non visible
aluminium surfaces shall have minimum chromatizing treatment.
The quote rate shall include all design, engineering, shop drawing approval from Architect & consultant,
Scaffolding and statutory obligations and safety code compliance as per client.
H FRAMELESS GLASS RAILING, Wall Type - WT-08
Design, Supply, Fabrication, Installation, Protection, Cleaning & Handover of 1250 mm in height from FFL
Glass Railing System. Glass Railing is designed to withstand the Wind Pressure of 1.46 Kpa conforming to IS
875 part III (the system must pass the proof test at 1.5 times designed wind pressure without any failure,
permanent deformation). The Railing Glass shall be 17.52mm Thk Laminated. Top Edge of Glass shall be
Protected by SS hand rail with the help of Backer rod & Weather Silicone (DC 991). Glass shall be held with
U shape Extruded Aluminum profile bracket fixed on RCC Slab at Bottom with SS 316 Anchor Fasteners
H.2 (Make Hilti/Equivalent) on equally spacing all in line with Tender Drawing. The Aluminum profile bracket R.mtr. 150.00
shall be Covered by Continuous Aluminium Cover Cap from all sides to Visible from Outside & FEVE Coating
with a minimum thickness of 60 to 80 microns, shade shall be as per Clients and Architect requirement. All
SS member should be of Grade SS 316 and shall have Satin finish as per the Architect requirement. The non
visible aluminum surfaces shall have minimum chromatizing treatment. The quote rate shall include all
design, engineering, shop drawing approval from Architect & consultant, Scaffolding and statutory obligations
and safety code compliance as per client.
Top SS Hand Rail of (Dia.50x2mm thk.) fixed in line with design drawings. Hand Rail system is supported with
Glass by EPDM Gasket as shown in the drawing.
All the joints horizontal or vertical inside and outside proper sealed with weather sealants (Non Stain & Non-
bleed) during the installation. Sealant shall be Dow sill Weather Silicone DC 991.
Providing and Fixing Ethylene Propylene Dinine Monomer (EPDM) Microwave cured Gaskets as weather strip
and barrier to ensure water and air tightness. Weather strip shall be EPDM Gaskets with Hardness (5 second)
shore A with a typical value not less than 65, ultimate tensile strength of 70 (+/- 10%) Kg/Sq.cm and ultimate
elongation of 250% (+/- 10%).
I SPIDER GLASS CANOPY SYSTEM, Wall Type - WT-09 Above Door 12th Floor Area,
Design, Supply, Fabrication, Installation, Protection, Cleaning & Handover of Suspended Glass Canopy with
grade SS 316 Tie Rod, custom designed to with stand the Design wind pressure of 1.46 Kpa conforming to IS -
875 part III. ( the system must pass the proof test at 1.5 times design wind pressure). The Canopy system
shall be of Stainless steel 1 way, 2-way spiders (With hole in Glass) of grade 316 from Dorma / Ozone /
I.1 Equivalent of SS polished finish assembly supported on Unitised Glazing system all in line with Tender SQ.M. 6.0
Drawing. Canopy Glass shall be 13.52 mm Thick. laminated Toughened Glass. Rate Shall include SS 316 grade
Routel bolts of approved make,weather sealants of Dowsil for (filling the glass groove) or approved make,
teflon/ nylon bushes & separators to prevent bi-metallic contacts, all in complete required to perform as per
specification and drawing in conjunction with BOQ.
General Notes :
1 This BOQ is based on Tender Drawing.
2 The System should be designed to resist wind pressure 2.19 Kpa as per IS codes and also to accommodate the building movements.
3 All Structural Member Aluminum extrusions thickness shall not be less than 2 mm and shall be conforming to Alloy 6063-T6.
4 All the Inside aluminium section shall be of Powder Coating and Aluminium exposed to weather shall have FEVE/PVDF Coating as per specification.
5 Non-exposed aluminium shall be chromotized.
6 All Rate includes Aluminum Sections & Glasses/ FR Grade ACP Sheet/ Mild Steel.
7 All Mild Steel shall be YST 310 MPA or Equivalent.HDG Bracket 80 to 100 micron
9 All screws used shall be only stainless steel of 316 grade & All Anchor, bolts, nuts and washers used shall be only stainless steel of 316 grade.
10 The quote includes interface details such as flashing, sealants, extruded capping (if required), insulations (if required), brackets and anchors fasteners as required.
11 Quantity mentioned in this B.O.Q are approximate quantities where we suggest Façade contractor/Fabricator/Sub - Contractor to Verify all the quantities as per site
conditions,
Bill Drawings
of Quantity and Schedule
description of work.
is indicative the Façade Contractor/Fabricator/Sub-Contractor shall be responsible to read the bill of quantity as per the Technical
12
Specification,
Test Tender
Certificates Drawings,
and Quality Architectural
Certificate for all drawings or other
Façade Item (Alum.related contract.
Section, Glass, Silicone, Hardware, Metal sheet Etc.) must be Provided by Fabricators before start the
13
installation
System Dwgs,or fabrication.
Shop Dwgs as per actual survey on site RCC condition and respective Structural Calculations shall be approved by Architect and Façade Consultant (RSM
14
Design Solutions).
15 Anchor bolt pull out test has to be carried out on site before starting the installation.
16 The processing unit of the glass processor will be inspected by the client / façade consultant before starting the work.
17 Contractor shall provide back to back guarantee/warranty on all the accessories used in the system.
18 Basic Rates of materials to be shown in covering letter while submitting Tender.
19 All the Glasses and Aluminium Section shall be brought on the site with proper covering, outer face with Protective film and same to be removed after the completion of
work with proper cleaning.
20 Certification will be based on actual measurement at site. Any variation has to be approved by the façade consultant.
21 Contractors has to carry on site water test as per AAMA STANDERED 501.2