Construction Daily Report Template

The Construction Daily Report for January 31, 2021, indicates no active manpower or machinery on site, with all categories reporting zero personnel and equipment. Weather conditions show a temperature range of 15ºC to 28ºC with 40% humidity. The report includes sections for weather, site status, manpower statistics, and machinery and equipment statistics, all reflecting inactivity.

Uploaded by

zeodyyoeuy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
74 views7 pages

Construction Daily Report Template

The Construction Daily Report for January 31, 2021, indicates no active manpower or machinery on site, with all categories reporting zero personnel and equipment. Weather conditions show a temperature range of 15ºC to 28ºC with 40% humidity. The report includes sections for weather, site status, manpower statistics, and machinery and equipment statistics, all reflecting inactivity.

Uploaded by

zeodyyoeuy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 7

Project Name

Construction Daily Report GPC Template file

2021-Jan-31
NO. 224

Weather Condition

Temperature Min 15ºC Max 28ºC Humidity 40%

Site Status Up to Date Progress


Contractor / SubContractor Status Work Shift Up to Last Up to Now Up to Now

Active Day Actual

HSE Summary
Hours without Accident

Manpower
Inactive - Machinery
Total Manpower (Man/Hour)
Up to Now
Direct
Indirect
Total Manpower
Total Machinery

Manpower Status Machinery & Equipment Status


Contractor / subcontractor Total Present Direct InDirect Local Non Local Total Active Idle Repair

Note: Total 0 0 0 0 0 0 0 0 0 0

( Site Manager) ( Site Manager)


Project Name
Construction Daily Report GPC Template file

2021-Jan-31
0 NO. 224

Weather Condition

Temperature Min 15ºC Max 28ºC Humidity 40%

Site Status Up to Date Progress


Contractor /SubContractor Status Work Shift Up to Last Today Up to Now

0 Active Day Actual


HSE Summary
Hours without accident

Manpower
Machinery

Machinery &
Manpower Total Manpower (Man/Hour)
Equipment

Contractor / subcontractor Present Direct InDirect Active Up to Now


Direct

Indirect

Total Manpower

Total Machinery

Note: Total 0 0 0 0

( Site Manager) ( Site Manager)


GPC Template file

Date: Narrative NO. 224

Performed Activities Description

Work Volume & Progress

Work Package Activity Unit Estimated Up to Last Today Up to Now Actual%

`
GPC Template file Project Name

Date: Manpower Statistics NO. 224

Direct Manpower

Total
Job Description
Day Night Day Night Day Night Day Night Day Night
Civil & Building
Foreman 0
Bar Bender 0
Bolt Man 0
Form Worker / Carpenter 0
Concrete Worker/Concrete Pump Operator 0
Asphalt Worker 0
Batching Plant Operator 0
Brick Layer / Mason 0
Tiler 0
Painter / Plasterer 0
Plumber / HVAC Worker 0
Plate Welder 0
Helper (Form Worker, Bar Bender) 0
Water Proofing Worker 0
Electric Worker 0
Others / Labor 0
Steel Structure 0 0
Foreman 0
Erector / Assembler 0
Steel / Iron Worker 0
Plate Welder 0
Welder Helper 0
Others 0
Piping 0 0
Foreman 0 0
Cutter / Bender / Grinder 0 0
Bevel Machine Operator 0 0
Pipe Fitter-1 0 0
Pipe Fitter-2 0 0
Fitter Helper 0 0
Tack Welder 0 0
Pipe Welder ( ARC ) 0 0
Pipe Welder ( TIG ) 0 0
Pipe Welder ( TIG + ARC ) 0 0
Pipe Welder ( CO2 ) 0 0
Pipe Support Welder 0 0
Welder Helper 0 0
Pipe Wrapper 0 0
Assembler 0 0
Test Man 0 0
Material Man / Spool Man 0 0
Others 0 0
Electrical & Instrumentation 0 0
Foreman 0 0
Cutter / Grinder 0 0
Plate Welder 0 0
Welder Helper 0 0
Assembler 0 0
Tray, Ladder & Conduit Erector 0 0
Electrical Man / Termination Worker 0 0
Instrument Device Calibrator 0 0
Tube & Air Pipe Erector 0 0
Cable Man 0 0
Others 0 0
Equipment & Tanks 0 0
Foreman 0 0
Mechanical Fitter 0 0
Plate Welder 0 0
Tank Welder 0 0
Welder Helper 0 0
Assembler / Equipment Erector 0 0
Millwright 0 0
Others 0 0
Paint & Insulation 0 0
Foreman 0 0
Sand Blaster 0 0
Shot Blaster 0 0
Painter 0 0
Stenciler 0 0
Insulator 0 0
Jacketing Worker 0 0
Others 0 0
General 0 0
Controller 0
Surveyor 0
Surveyor Helper 0
Equipment Operator 0
Heavy Vehicle driver 0
Rigger 0
Scaffolder 0
Skilled Labor 0
Common Labor 0
Machinery Maintenance 0
Total 0 0 0 0 0 0 0 0 0 0
GPC Template file Project Name

Date: Manpower Statistics NO. 224

Indirect Manpower

Total
Job Description
Day Night Day Night Day Night Day Night Day Night
Management 0
Project Manager / Deputy 0 0 0
Site Manager / Deputy 0 0
Construction 0
Construction Manager / Deputy 0 0
Area/Discipline Manager(Superintendent) 0 0
Superintendent 0 0
Civil & Building - Supervisor 0 0
Steel Structure - Supervisor 0 0
Piping - Supervisor 0 0
Equipment & Tanks - Supervisor 0 0
Electrical - Supervisor 0 0
Instrument - Supervisor 0 0
Telecommunication - Supervisor 0 0
Insulation & Paint - Supervisor 0 0
Others 0 0
Technical Office 0 0 0
Technical Office Manager / Deputy 0 0
Technical Office - Engineers 0 0
Technical Office - Technicians 0 0
Document Controller 0 0
Others 0 0
Planning & Project Control 0 0 0
Planning & Control Manager / Deputy 0 0
Planning & Control - Engineers 0 0
Planning & Control - Technicians 0 0
Others 0 0
IT & Communication 0 0 0
IT & Communication Manager / Deputy 0 0
Engineers / Technicians 0 0
Others 0 0
QA / QC 0 0 0
QC Manager / Deputy 0 0
QC - Engineers 0 0
QC - Technicians 0 0
Concrete Lab. 0 0
Soil Mechanic Lab. 0 0
NDT Controller / Radiography 0 0
PWHT Man 0 0
Staff 0 0
Others 0 0
HSE 0 0 0
HSE Manager / Deputy 0 0
HSE - Supervisor 0 0
HSE - Officer 0 0
Doctor 0 0
Nurse 0 0
HSE Driver 0 0
Others 0 0
Material Control 0 0 0
Material Control Manager / Deputy 0 0
Custom Clearance 0 0
Spool Man 0 0
Warehouse - Material Man 0 0
Warehouse - Tool Man 0 0
Material Helper 0 0
Others 0 0
Finance / Cost / Contracts
Finance Manager 0 0
Finance / Accountant 0 0
Cost Control 0 0
Contracts 0 0
Others 0 0
Survey
Surveyor Manager 0 0
Surveyor 0 0
Surveyor Helper 0 0
Facility / Maintenance
Manager 0 0
0

Electrician 0 0
Serviceman 0 0
Motor Man 0 0
Others 0 0
Security
Security Manager / Deputy 0 0
Guardian 0 0
Logistics
Logistics Manager / Deputy 0 0
Local Procurement / Purchaser 0 0
Transportation Office 0 0
Administration / Clerk 0 0
Light Vehicle Driver 0 0
Maintenance / General Services - Site 0 0
Maintenance / General Services - Camp 0 0
Others 0 0
Total 0 0 0 0 0 0 0 0 0 0
GPC Template file Project Name

Date: Machinery & Equipment Statistics NO. 224

Total
Machinery Description
Active Active Active Active Active
Excavator
Bulldozer
Loader
Grader
Compact Roller / Vibrating Roller
Truck Mixer
Concrete Pump
Truck Spray Bar
Dumper
Bob cat
Tractor / Loader Tractor
Trailer
Truck
Boom Truck
Lift Truck
Water Tank Lorry
Fuel Tank Lorry
Buggy
Crane < 50 Ton
Crane > 50 Ton
Bus / Minibus
Car
Ambulance
Total Machinery 0 0 0 0 0

Total
Equipment Description
Active Active Active Active Active
Diesel Generator
Compactor
BatchingPlant
Cement Silo
Concrete & Groute Mixer
Concrete Laboratory
Pichor / Jack Hammer
Rebar Cutting
Bar Bending
Grinding Machine
Vibrator
Fuel Tank
Water Tank
Tower Crane
Lifting Fixture
Lighting Projector
Sieve Plant
Air Compressor
Air Less
Scaffolding Pipes & Board
Water Pump
Elevator
GPS
Survey Camera - Nivo
Survey Camera - Total
Survey Camera - Theodolit
Shot Blast Machine
Sand Blast Machine
Waterjet
Welding Trans
Rectifier
StressReliefMachine(PWHTEq.)
X-Ray Machine
Ultrasunic Equipment
Magnet Test (Detector/Black Light)
Vacum Box Tester
Hydrotest Water Pump
Plasma Cutting Machine
Saw Machine
Gouge
Shackle
Junction Box
Oxygen - Accetilene Cutter
Angle Cutter
Rolling Machine
Threading Machine
Grinder
Punch / Press
Electrode Dry Oven
Electrode Portable Oven
Jack - Horizontal
Jack - Vertical
Drilling Machine
Drill Wagon
Chain Block
Electric Winch
Container / Conex
Computer
Printer & Scannner
Copy Machine
Fax
Total Equipment 0 0 0 0 0

Total Machinery & Equipment 0 0 0 0 0


GPC Template file Project Name

Work Volume

Discipline Activity Uom Estimated Up to Last Today Up to Now Remain PRG%(Volume)

Excavation M3
Reinforcement Kg
Civil Formworking M2
Concrete Pouring M3
Back fill M3
Erection Kg
Steel Structure
Accessory Kg
UG Field ID
Piping AG Shop ID
AG Field ID
FIX Ton
Equipment
Package Rotary Ton
(Installation)
Unit Package Ton
Prefabrication Ton
Tank
Welding M
Electrical Cabling ML
EL & IN
Instrument Cablin ML