0% found this document useful (0 votes)
27 views10 pages

Stfft248-2024rev.05 - MR Amer Ahmad Mohammad Ali Alsabori

This document outlines the terms and conditions for fit-out works for Mr. Amer Ahmad Mohammed Ali Alsaboori in Dubai, UAE, including payment terms, exclusions, and responsibilities of both parties. The total amount for the project is AED 610,005.82, covering various civil and decorative works. The quote is valid for 15 days from November 10, 2024, and includes specific clauses regarding variations, delays, and ownership of materials.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
27 views10 pages

Stfft248-2024rev.05 - MR Amer Ahmad Mohammad Ali Alsabori

This document outlines the terms and conditions for fit-out works for Mr. Amer Ahmad Mohammed Ali Alsaboori in Dubai, UAE, including payment terms, exclusions, and responsibilities of both parties. The total amount for the project is AED 610,005.82, covering various civil and decorative works. The quote is valid for 15 days from November 10, 2024, and includes specific clauses regarding variations, delays, and ownership of materials.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 10

Our Ref : STFIF/FT248-2024 Rev.

05
Date : November 10, 2024
Attn : Engineer Mai
Subject : Fit-Out Works – Mr. Amer Ahmad Mohammed Ali Alsaboori – Dubai, UAE

Terms and Conditions:


1. Our offer covers only the quantities and scope of works mentioned on the quotation (BOQ). Any other
additional/deduction on quantities & scope will be executed only after receipt of written approval from
the Client and it will be considered as variation in time and cost.
2. The delivery period is effective from the date of receipt of all mandatory approvals and permits, if required,
or date of receipt of advance as per the offer or approvals in the drawings, whichever is later.
3. STF not be held responsible for the delays caused due to delays in obtaining approvals, issues to get proper
timing to get access to site or by the works carried out by other parties at site or by any delays caused for
late approvals by client or any further scope changes.
4. No DLP (defects liability period), no Retention and no Maintenance works after final handing over.
5. The offer is based on the full scope of work mentioned in the BOQ any removal of scope on BOQ, STF
has rights to resubmit the quotation with the revised rates.
6. Required Authority Certificates, certificate of completion, and all material warranties certification will be
handed over after full payment clearance.
7. Any Authority fees will be paid by the client upon submission of receipt or payment links.
8. Any inspection, reparation, maintenance of existing services or equipment’s is excluded, STF is responsible
only for products & Services they are providing during the project course.
9. Exchanges and returns will only be accepted within 7 days upon receipt of the item. No cash refunds on
returned items, only credit notes. For defective /quality related claims 100% credit note.
10. Variations that may occur in materials supplied and installed by STF during the renovation works, it is
important to note that due to the nature of renovation projects, there may be differences in tone, color,
pattern, and other characteristics of the materials used. The materials approved and provided by STF may
not match the existing materials 100%. This is a common occurrence in renovation projects,
Additionally, wooden works, stone being natural materials, may also exhibit minor variations in color
and texture.
11. Any dispute arising during the project implementation, execution, delays due to unforeseen
circumstances, natural causes, resources deadlines to be settled amicably & collectively.
12. If the client cancels or removes one or more items or scopes of work, STF will have all the right to revise
the full quote in terms of the prices.
Our Ref : STFIF/FT248-2024 Rev.05
Date : November 10, 2024
Attn : Engineer Mai
Subject : Fit-Out Works – Mr. Amer Ahmad Mohammed Ali Alsaboori – Dubai, UAE

13. Any payment delay will result in the project freezing & withdrawal of support services until the payment
is cleared.
14. Protection of all the materials installed by STF is the responsibility of client and main contractor.
15. All materials supplied and installed by STF, will remain at its possession only till full payment clearance
of the initial Contract and any variations if applied. The title and ownership of the goods & services shall
not pass to the buyer until payment of the full sum due has been made. The seller has the right to take
back his items anytime.
16. Our Preliminaries are quoted based on a 45-days official project execution period. In the event that the
project extends for any reason, and which will not be the responsibility of STF beyond this initial period,
please note that any additional fees incurred due to the time variation will be applied accordingly.
17. In Demolition works – Any unforeseen circumstances or issue while conducting demo works will be
raised, checked & submit a report for approval and will not continue until the issue is resolved or
approved (For example, demolition works in shower enclosure – If ever we encounter something that
can be damaged it will be raised & wait for approval before we continue. Also, if this is out of our scope
it will be charged accordingly (variation order) and need approval before executing the work. (mention
the liabilities of contractor for delay works, damage in material, there will be a cost variation and not
STF responsibilities)
18. Snagging will be issued once, and the inspection must be conducted by the concerned person. If they do
not respond to the completion of the snagging report via confirmation email within 3 days, it will be
considered completed and approved.

Exclusion:

a. Flooring Works
b. Doors
c. Furnitures
d. Lighting Works
e. MEP Works
f. Sanitary Wares & Accessories
g. Supply of Wall Slab
h. Scaffolding
i. Not mentioned in the BOQ

Payment Terms:

• 70% Advance Payment CDC

• 20% upon delivery of all materials at site, 7 days maximum after invoice issuance CDC

• 10% on completion Payment to be released after 7 working days from the approval of the payment
application.
Our Ref : STFIF/FT248-2024 Rev.05
Date : November 10, 2024
Attn : Engineer Mai
Subject : Fit-Out Works – Mr. Amer Ahmad Mohammed Ali Alsaboori – Dubai, UAE

Validity:

• Quote valid for 15 days from the above date.

• Should you need any clarifications, please do not hesitate to contact us.

• Validity: To be discussed and agreed

• Should you need any clarifications, please do not hesitate to contact us

Best Regards

Soft Touch Interior & Fitouts LLC.


Our Ref : STFIF/FT248-2024 Rev.05
Date : November 10, 2024
Attn : Engineer Mai
Subject : Fit-Out Works – Mr. Amer Ahmad Mohammed Ali Alsaboori – Dubai, UAE
MAIN SUMMARY
PROJECT: PRIVATE VILLA DATE: 10-Nov-24
CLIENT: MR. AMER ALI AL SABOORI
LOCATION: DUBAI, UAE

FIT OUT WORKS - DESIGN


BILL NO. ITEM DESCRIPTION AMOUNT (AED)
1.0 PRELEMINARIES AED52,000.00
2.0 CIVIL WORKS AED132,216.71
5.0 DECORATIVE WORKS AED425,789.11
TOTAL AMOUNT AED610,005.82
Remarks:
BILL OF QUANTITY
CIVIL WORKS

SELLING RATE TOTAL AMOUNT


ITEM NO. ITEM DESCRIPTION UNIT QTY
(AED) (AED)
GROUND FLOOR
1.0 ENTRANCE LOBBY, STAIR HALL, FAMILY SEATING, FAMILY DINING, WASH AND REAR ENTRANCE LOBBY
CEILING
Supply & Installation of Single-level 12.5mm thick gypsum board ceiling with cove, shadow gap detail around the
1.1 perimeter, no visible groove lines or profiles. m² 127.00 155.00 19,684.90
@ Entrance lobby, family seating and family dining, rear entrance lobby, and wash

1.2 Supply & Installation of Gypsum Access panel of size: 60cm x 60cm @ Wash Nos 1.00 496.48 496.48

WALL

1.3 Supply & Installation of 12.5mm thick embossed gypsum panel along with grooves. @ Family seating and family dining m² 27.00 155.00 4,184.98

SUB-TOTAL I. 24,366.35
2.0 MAJLIS, LOBBY, DINING ROOM AND WASH
CEILING
Supply & Installation of Single-level 12.5mm thick gypsum board ceiling with cove, shadow gap detail around the
2.1 perimeter, no visible groove lines or profiles. m² 78.00 155.00 12,089.94
@ Majlis,dining room, lobby, and wash

2.2 Supply & Installation of Gypsum Access panel of size: 60cm x 60cm @ Wash Nos 1.00 496.48 496.48

WALL
Supply & Installation of 12.5mm thick embossed gypsum panel with groove line cladded on the wall.
2.3 m² 19.00 155.00 2,944.98
@ Dining room
SUB-TOTAL II. 15,531.40
FIRST FLOOR
3.0 LIFT LOBBY AND CORRIDOR
CEILING
Supply & Installation of Single-level 12.5mm thick gypsum board ceiling with cove, shadow gap detail around the
3.1 perimeter, no visible groove lines or profiles. m² 80.00 155.00 12,399.94
@ Lift lobby and corridor
SUB-TOTAL III. 12,399.94
4.0 MASTER BEDROOM, MASTER SEATING, MASTER DRESS AND MASTER BATH
CEILING
Supply & Installation of Single-level 12.5mm thick gypsum board ceiling with cove, shadow gap detail around the
4.1 perimeter, no visible groove lines or profiles. m² 264.00 155.00 40,919.79
@ Master bedroom, master seating, master dress, and master bath

4.2 Supply & Installation of Gypsum Access panel of size: 60cm x 60cm @ master bath Nos 2.00 496.48 992.95

SUB-TOTAL IV. 41,912.74


5.0 BEDROOM 02 AND DRESS
CEILING
Supply & Installation of Single-level 12.5mm thick gypsum board ceiling with cove, shadow gap detail around the
5.1 perimeter, no visible groove lines or profiles. m² 32.00 155.00 4,959.97
@ Bedroom 02 and Dress
WALL

5.2 Supply & Installation of 12.5mm thick gypsum panel along with grooves cladded on the wall. @ Bedroom 02 m² 13.00 155.00 2,014.99

SUB-TOTAL V. 6,974.96
6.0 BEDROOM 03 AND DRESS
CEILING
Supply & Installation of Single-level 12.5mm thick gypsum board ceiling with cove, shadow gap detail around the
6.1 perimeter, no visible groove lines or profiles. m² 25.00 155.00 3,874.98
@ Bedroom 03 and Dress
WALL

6.2 Supply & Installation of 12.5mm thick gypsum panel along with grooves cladded on the wall. @ Bedroom 03 m² 12.00 155.00 1,859.99

SUB-TOTAL VI. 5,734.97


7.0 MAYED BEDROOM, DRESS, AND BATH
CEILING
Supply & Installation of Single-level 12.5mm thick gypsum board ceiling with cove, shadow gap detail around the
7.1 perimeter, no visible groove lines or profiles. m² 42.00 155.00 6,509.97
@ Mayed bedroom, Dress, and Bath

7.2 Supply & Installation of Gypsum Access panel of size: 60cm x 60cm bath Nos 1.00 496.48 496.48

WALL
Supply & Installation of 12.5mm thick decorative embossed gypsum panel cladding along
7.3 m² 25.00 155.00 3,874.98
with curveddesign, groove line and gold paint border @ Mayed bedroom
SUB-TOTAL VII. 10,881.42
8.0 OFFICE
CEILING
Supply & Installation of Single-level 12.5mm thick gypsum board ceiling with cove, shadow gap detail around the
8.1 perimeter, no visible groove lines or profiles. m² 13.00 155.00 2,014.99
@ Office
WALL

8.2 Supply & Installation of 12.5mm thick gypsum panel cladding along with groove line @ Office m² 45.00 155.00 6,974.96

SUB-TOTAL VIII. 8,989.95


ROOF FLOOR
9.0 LIFT LOBBY
CEILING
Supply & Installation of Single-level 12.5mm thick gypsum board ceiling with cove, shadow gap detail around the
9.1 perimeter, no visible groove lines or profiles. m² 35.00 155.00 5,424.97
@ Lift Lobby
SUB-TOTAL IX. 5,424.97
SUB-TOTAL I. 24,366.35
SUB-TOTAL II. 15,531.40
SUB-TOTAL III. 12,399.94
SUB-TOTAL IV. 41,912.74
SUB-TOTAL V. 6,974.96
SUB-TOTAL VI. 5,734.97
SUB-TOTAL VII. 10,881.42
SUB-TOTAL VIII. 8,989.95
SUB-TOTAL IX. 5,424.97
TOTAL 132,216.71
Remarks:
BILL OF QUANTITY
JOINERY WORKS - DESIGNED AREA

SELLING RATE TOTAL AMOUNT


ITEM NO. ITEM DESCRIPTION UNIT QTY
(AED) (AED)
A VANITIES FOR WASH/BATHROOM
1.0 SINGLE VANITY COUNTER
Supply & Installation, Made of 20-30mm thick Black Countertop: L 145cm x W 60+05cm x 2cm Thickness
Nos 2.00
marquina marble on top & side with chamfered edge profile Marble: Black Marquina
and polished, along with 18-24mm thick MDF wooden panel Counter: L 150cm x W 60cm x H 30cm
Nos 2.00
finished with veneer stain hanging on the existing wall with Finishes: Veneer stain
1.1 10,380.00 20,760.00
the support of fasteners and MS brackets and all required Ironmongeries : Class C Set 2.00
fittings along with LED strip light. (S/I) 3-5mm thick clear mirror along with metal frame
Sanitary ware Excluded PC/rate: 400/sqm finished with powder coat. Nos 2.00
@ GF - Family dining wash Size: 90cm L x 370cm ht
Supply & Installation, Made of 20-30mm thick Black Countertop: L 145cm x W 60+05cm x 2cm Thickness
Nos 1.00
marquina marble on top & side with chamfered edge profile Marble: Black Marquina
and polished, along with 18-24mm thick MDF wooden panel Counter: L 145cm x W 60cm x H 30cm
Nos 1.00
finished with veneer stain hanging on the existing wall with Finishes: Veneer stain
1.2 10,380.00 10,380.00
the support of fasteners and MS brackets and all required Ironmongeries : Class C Set 1.00
fittings along with LED strip light. Sanitary ware Excluded (S/I), 3-5mm thick clear mirror along with 05cm wide
PC/rate: 400/sqm metal frame and LED back light on wall. Nos 1.00
@ GF - Family dining toilet Size: 70cm L x 370cm ht
Supply & Installation, Made of 20-30mm thick Crema marfil Countertop: L 120cm x W 60cm x H 15cm
Nos 1.00
marble on top & side with chamfered edge profile and Marble: Crema marfil
polished, along with 18-24mm thick MDF wooden panel Counter: L 120cm x W 60cm x H 40cm
Nos 1.00
along with strips finished with PU paint. hanging on the Finishes: PU paint
1.3 11,100.00 11,100.00
existing wall with the support of fasteners and MS brackets Ironmongeries : Class C Set 1.00
and all required fittings along with LED strip light. PC/rate: (S/I), 3-5mm thick clear embossed mirror along with
400/sqm LED strip backlights. Nos 1.00
Sanitary ware Excluded Size: 80cm L x 250cm ht
SUB-TOTAL I. 42,240.00
2.0 DOUBLE VANITY COUNTER
Countertop: L 220cm x W 60+20cm x 2cm Thickness
Nos 1.00
Supply & Installation, Made of 20-30mm thick Calacatta Marble: Calacatta white
white marble on top & side with chamfered edge profile and Bottomcounter: L 220cm x W 60cm x 2cm Thickness
Nos 1.00
polished - hanging on the existing wall with the support of Finishes: Tempered glass
2.1 fasteners and MS brackets and all required fittings along with Ironmongeries : Class C Set 1.00 15,300.00 15,300.00
LED strip light. (S/I), 3-5mm thick clear mirror along with metal strip
Sanitary ware Excluded PC/rate: 400/sqm frame finished with powder coat and LED strip light on Nos 2.00
@ FF - Master bath wall.
Size: 70cm L x 250cm ht
SUB-TOTAL II. 15,300.00
3.0 TRIPLE VANITY COUNTER
Countertop: L 280cm x W 60+05cm x 2cm Thickness
Supply & Installation, Made of 20-30mm thick Black Nos 1.00
Marble: Black marquina
marquina on top & side with chamfered edge profile and
Counter: L 280cm x W 60cm x H 50cm
polished - 18-24mm thick MR MDF wooden decorative Nos 1.00
Finishes: PU paint
counter finished with PU paint hanging on the existing wall
3.1 Ironmongeries : Class C Set 1.00 21,000.00 21,000.00
with the support of fasteners and MS brackets and all
required fittings along with LED strip light and metal strips. (S/I), 3-5mm thick embossed clear mirror along with
Sanitary ware Excluded PC/rate: 400/sqm metal strip and LED strip light on wall. Nos 3.00
@ GF - Majlis wash Size: 70cm L x 280cm ht

SUB-TOTAL III. 21,000.00


B. WALK-IN WARDROBES
Supply & Installation of Wardrobe, made of 18/9/6mm thick
Wardrobe: L 1010cm x W 60cm x H 400cm Finishes:
MR MDF decorative wardrobe finished with veneer stain. Nos 1.00
Veneer stain
10mm thick clear tempered glass shutters with metal frame
4.1 and fluted panel shutters including necessary fittings and 86,400.00 86,400.00
fasteners. (sample to be provided for approval) along with
LED backlight set. Ironmongeries : Class C, PC Rate: 200Aed/Set Set 1.00
@ FF - Master dress

Supply & Installation of Wardrobe, made of 18/9/6mm thick Wardrobe: L 320cm x W 60cm x H 400cm Finishes:
Nos 1.00
MR MDF decorative wardrobe finished with pu paint and PU paint and veneer stain
veneer stain along with necessary fittings and fasteners.
4.2 19,200.00 19,200.00
(sample to be provided for approval) along with LED
backlight set.
Ironmongeries : Class C Set 1.00
@ FF - Mayeds dress

SUB-TOTAL IV. 105,600.00


SUB-TOTAL I. 42,240.00
SUB-TOTAL II. 15,300.00
SUB-TOTAL III. 21,000.00
SUB-TOTAL IV. 105,600.00
TOTAL 184,140.00
Remarks:
BILL OF QUANTITY
DECORATIVE WORKS

SELLING RATE TOTAL AMOUNT


ITEM NO. ITEM DESCRIPTION UNIT QTY
(AED) (AED)

1.0 GROUND FLOOR


Supply & Installation of 3-6mm thick tinted mirror cladded on wall
1.1 Nos 1.00 10,434.00 10,434.00
Size: 240cm L x 800cm ht @ Entrance lobby
Supply & Installation of 18-24mm thick MDF wooden fluted panel finish with pu paint
1.2 Nos 1.00 4,200.00 4,200.00
Size: 240cm L x 85cm ht @ Entrance lobby

Supply & Installation of 18-24mm thick MDF wooden fluted panel finish with Veneer stain along
1.3 lm 22.00 720.00 15,840.00
with metal strip Wide: 100cm @ Entrance Lobby and Hall

Supply & Installation of 18-24mm thick MDF wooden fluted panel finish with pu paint
1.4 Nos 1.00 8,919.88 8,919.88
Size: 140cm L x 400cm ht @ Hall
Supply & Installation of Decorative MDF wooden 3D panel finish finish with pu paint
1.5 Nos 1.00 27,211.43 27,211.43
along with metal frame Size: 290cm L x 480cm ht @ Stair area "GF to FF only"
Supply & Installation of 18-24mm thick MDF wooden panel finish with pu paint along
1.6 Lm 11.00 252.00 2,772.00
with metal strip Wide: 60cm @ Stair area "GF to FF only"
Supply & Installation of 4mm thick light stone cladding on wall
1.7 m² 28.00 540.00 15,120.00
@ Family living area
Supply & Installation of, Artificial greenery on wall
1.8 lm 9.00 2,400.00 21,600.00
Wide: 60cm @ Hall
Supply & Installation of 18-24mm thick MDF wooden fluted panel finish with pu paint
1.9 Nos 1.00 12,742.69 12,742.69
Size: 200cm L x 400cm ht @ Hall
Supply & Installation of Decorative MDF wooden 3D panel finish finish with pu paint
1.10 Nos 1.00 16,913.02 16,913.02
along with metal frame Size: 160cm L x 400cm ht @ Family seating

Supply & Installation of 8-24mm thick embossed MDF wooden fluted panel finish with decorative
1.11 Nos 1.00 18,676.00 18,676.00
paint along with metal frame Size: 250cm L x 335cm W @ Family seating

Supply & Installation of 18-24mm thick MDF wooden fluted panel finish with decorative paint
1.12 Nos 1.00 5,574.93 5,574.93
Size: 100cm L x 350cm W @ Family seating
Supply & Installation of 3-5mm thick bevel edge tinted mirror cladded on wall
1.13 Nos 1.00 12,353.53 12,353.53
Size: 375cm L x 350cm ht @ Family dining
Supply & Installation of 3-5mm thick bevel edge tinted mirror cladded on wall
1.14 Nos 1.00 9,412.21 9,412.21
Size: 250cm L x 400cm ht @ Dining room
Supply & Installation of 18-24mm thick MDF wooden fluted panel finish with veneer stain
1.15 Nos 2.00 3,120.00 6,240.00
Size: 75cm L x 400cm ht @ Dining room
Supply & Installation of 10-12mm thick tempered glass baluster along with metal handrail
1.16 lm 80.00 1,250.00 100,000.00
Height: 120cm @ Main stair "GF to RF", FF- Hall and RF - Stair lobby
SUB-TOTAL I. 288,009.69
2.0 FIRST FLOOR
Supply & Installation of Fabric padded panel along with metal strip cladded on the wall
2.1 Nos 1.00 9,991.42 9,991.42
Size: 230cm L x 400cm ht @ Master bedroom
Supply & Installation of 18-
2.2 24mm thick embossed MDF wooden panel along with grooves and finished with veneer stain lm 10.00 834.00 8,340.00
Wide: 70cm @ Master bedroom
Supply & Installation of 3-5 thick clear mirror cladded on the wall.
2.3 lm 9.00 240.00 2,160.00
Wide: 20cm @ Master bedroom
Supply & Installation of Fabric padded panel on wall
2.4 Nos 1.00 4,368.00 4,368.00
Size: 400cm L x 120cm ht @ Bedroom 02
Supply & Installation of 18-24mm thick MDF wooden fluted panel finish with veneer stain
2.5 Nos 1.00 3,600.00 3,600.00
Size: 120cm L x 390cm ht @ Bedroom 02
Supply & Installation of 18-24mm thick MDF wooden TV bottom cabinet finish with veneer stain
2.6 Nos 1.00 3,720.00 3,720.00
Size: 210cm L x 45cm W x 30cm ht @ Bedroom 03
Supply & Installation of 18-24mm thick MDF wooden study table cabinet finish with
2.7 Nos 1.00 3,240.00 3,240.00
veneer stain Size: 150cm L x 45cm W x 30cm ht @ Bedroom 03
Supply & Installation of 18-24mm thick MDF wooden TV bottom cabinet finish with
2.8 Nos 1.00 2,160.00 2,160.00
veneer stain Size: 150cm L x 50cm W x 85cm ht @ Bedroom 03
Supply & Installation of 18-24mm thick embossed MDF wooden shelves finish with
2.9 veneer stain along with 10-12mm thick porcelain tile cladding. Nos 1.00 20,400.00 20,400.00
Size: 300cm L x 50cm W x 400cm ht @ Office
Supply & Installation of 3-5mm clear mirror border cladded on wall
2.10 lm 5.00 240.00 1,200.00
Wide: 10cm @ Office
SUB-TOTAL II. 59,179.42
WALL SLAB
GROUND FLOOR
3.0 ENTRANCE LOBBY, FAMILY SEATING, FAMILY DINING, WASH

Installation of Wall veinmatch porcelain tile cladding - Black porcelain using with special
3.1 adhesive glue, along with grouting & wastage included. lm 21.00 480.00 10,080.00
Wide: 60cm & Thick: 1cm @ Entrance lobby

Installation of Wall embossed veinmatch porcelain tile cladding - White porcelain using with
3.2 special adhesive glue, along with grouting & wastage included. m² 12.00 420.00 5,040.00
Size: 230cm x 320cm & Thick: 1cm. @ Family seating
Installation of Wall embossed porcelain tile cladding - Wooden texture porcelain using with
3.3 special adhesive glue, along with grouting & wastage included. Wide: 20cm & Thick: 1cm lm 9.00 240.00 2,160.00
@ Wash
Installation of Wall porcelain tile cladding - White porcelain using with special adhesive glue,
3.4 along with grouting & wastage included. Size: 60cm L x 120cm ht & Thick: 1cm m² 70.00 420.00 29,400.00
@ Wash

4.0 MAJLIS, LOBBY, DINING ROOM, WASH

Installation of Wall embossed veinmatch porcelain tile cladding - Black porcelain using with
4.1 special adhesive glue, along with grouting & wastage included. lm 4.00 420.00 1,680.00
Wide: 30cm & Thick: 1cm @ Majlis

Installation of Wall embossed veinmatch porcelain tile cladding - White porcelain using with
4.2 special adhesive glue, along with grouting & wastage included. m² 17.00 420.00 7,140.00
Size: 400cm x 320cm & Thick: 1cm. @ Majlis

Installation of Wall embossed veinmatch porcelain tile cladding - Black porcelain using with
4.3 special adhesive glue, along with grouting & wastage included. m² 12.00 420.00 5,040.00
Size: 100cm x 400cm & Thick: 1cm. @ Dining room

Installation of Wall veinmatch porcelain tile cladding - Wooden texture porcelain using with
4.4 special adhesive glue, along with grouting & wastage included. Thick: 1cm m² 25.00 420.00 10,500.00
@ Wash

Installation of Wall porcelain tile cladding - White porcelain using with special adhesive glue,
4.5 along with grouting & wastage included. Size: 60cm L x 120cm ht & Thick: 1cm m² 18.00 420.00 7,560.00
@ Wash

SUB-TOTAL III. 78,600.00


SUB-TOTAL I. 288,009.69
SUB-TOTAL II. 59,179.42
SUB-TOTAL III. 78,600.00
TOTAL 425,789.11