SR.
NO
DRAWING ROUTE
SUB SECTION Sub. SR. No. DESCRIPTION OF DRAWING DRAWING NUMBER
COVER SHEET AND
A
GENERAL NOTES
1 COVER SHEET ARBOUR-STR-SZ-TYP-000
2 GENERAL NOTES-1 ARBOUR-STR-SZ-TYP-001
3 GENERAL NOTES-2 ARBOUR-STR-SZ-TYP-002
B FOUNDATION RAFT
TOWER RAFT DEMARCATION ARBOUR-STR-AR-NZ/SZ-
PLAN 001A
GENERAL DEVELOPMENT
Ld 1 ARBOUR-STR-SZ-TYP-004
LENGTH SCHEDULE
OVERALL 2 OVERALL FOUNDATION PLAN ARBOUR-STR-SZ-BS-100
3 FOUNDTION LVL PART PLAN-1 ARBOUR-STR-SZ-BS-100.1
4 FOUNDTION LVL PART PLAN-2 ARBOUR-STR-SZ-BS-100.2
5 FOUNDTION LVL PART PLAN-3 ARBOUR-STR-SZ-BS-100.3
6 FOUNDTION LVL PART PLAN-4 ARBOUR-STR-SZ-BS-100.4
7 FOUNDTION LVL PART PLAN-5 ARBOUR-STR-SZ-BS-100.5
8 FOUNDTION LVL PART PLAN-6 ARBOUR-STR-SZ-BS-100.6
9 FOUNDTION LVL PART PLAN-7 ARBOUR-STR-SZ-BS-100.7
FOUNDATION SECTION AND
SECTIONS 10 ARBOUR-STR-SZ-BS-202.1
DETAILS 1
FOUNDATION SECTION AND
SECTIONS 11 ARBOUR-STR-SZ-BS-202.2
DETAILS 2
FOUNDATION SECTION AND
SECTIONS 12 ARBOUR-STR-SZ-BS-202.3
DETAILS 3
FOUNDATION SECTION AND
SECTIONS 13 ARBOUR-STR-SZ-BS-202.5
DETAILS 5
FOUNDATION BOTTOM
REINFORCEMENT 14 ARBOUR-STR-SZ-BS-201.1
REINFORCEMENT PLAN X&Y
FOUNDATION BOTTOM
REINFORCEMENT 15 ARBOUR-STR-SZ-BS-201.2
REINFORCEMENT PLAN X&Y
FOUNDATION TOP
REINFORCEMENT 16 ARBOUR-STR-SZ-BS-201.3
REINFORCEMENT PLAN X&Y
TYPICAL ISOLATED FOOTINGS
17 ARBOUR-STR-SZ-TYP-401
TYPICAL COMBINED FOOTING
18 ARBOUR-STR-SZ-TYP-402
DETAILS
TYPICAL RAFT DETAILS-1
RAFT DETAILS 19 ARBOUR-STR-SZ-TYP-403
TYPICAL RAFT DETAILS-2
RAFT DETAILS 20 ARBOUR-STR-SZ-TYP-404
THERMO COUPLER 21 RAFT CONCRETE MOCKUP SSK-02
C LOADINGS ON BASEMENT
1 BASEMENT-3 LOADING DIAGRAM ARBOUR-STR-SZ-TYP-020
2 BASEMENT-2 LOADING DIAGRAM ARBOUR-STR-SZ-TYP-021
3 BASEMENT-1 LOADING DIAGRAM ARBOUR-STR-SZ-TYP-022
4 GROUND FLOOR LOADING ARBOUR-STR-SZ-TYP-023
5 TOWER LOADING DIAGRAM ARBOUR-STR-SZ-TYP-024
D FLOOR FRAMING PLANS
B3 OVERALL 1 B3 FLOOR FRAMING PLAN ARBOUR-STR-SZ-BS-101
2 B3 FLOOR FRAMING PLAN -1 ARBOUR-STR-SZ-BS-101.1
3 B3 FLOOR FRAMING PLAN -2 ARBOUR-STR-SZ-BS-101.2
4 B3 FLOOR FRAMING PLAN -3 ARBOUR-STR-SZ-BS-101.3
5 B3 FLOOR FRAMING PLAN -4 ARBOUR-STR-SZ-BS-101.4
6 B3 FLOOR FRAMING PLAN -5 ARBOUR-STR-SZ-BS-101.5
7 B3 FLOOR FRAMING PLAN -6 ARBOUR-STR-SZ-BS-101.6
8 B3 FLOOR FRAMING PLAN -7 ARBOUR-STR-SZ-BS-101.7
B2 OVERALL 9 B2 FLOOR FRAMING PLAN ARBOUR-STR-SZ-BS-102
10 B2 FLOOR FRAMING PLAN -1 ARBOUR-STR-SZ-BS-102.1
11 B2 FLOOR FRAMING PLAN -2 ARBOUR-STR-SZ-BS-102.2
12 B2 FLOOR FRAMING PLAN -3 ARBOUR-STR-SZ-BS-102.3
13 B2 FLOOR FRAMING PLAN -4 ARBOUR-STR-SZ-BS-102.4
14 B2 FLOOR FRAMING PLAN -5 ARBOUR-STR-SZ-BS-102.5
15 B2 FLOOR FRAMING PLAN -6 ARBOUR-STR-SZ-BS-102.6
16 B2 FLOOR FRAMING PLAN -7 ARBOUR-STR-SZ-BS-102.7
B1 OVERALL 17 B1 FLOOR FRAMING PLAN ARBOUR-STR-SZ-BS-103
18 B1 FLOOR FRAMING PLAN -1 ARBOUR-STR-SZ-BS-103.1
19 B1 FLOOR FRAMING PLAN -2 ARBOUR-STR-SZ-BS-103.2
20 B1 FLOOR FRAMING PLAN -3 ARBOUR-STR-SZ-BS-103.3
21 B1 FLOOR FRAMING PLAN -4 ARBOUR-STR-SZ-BS-103.4
22 B1 FLOOR FRAMING PLAN -5 ARBOUR-STR-SZ-BS-103.5
23 B1 FLOOR FRAMING PLAN -6 ARBOUR-STR-SZ-BS-103.6
24 B1 FLOOR FRAMING PLAN -7 ARBOUR-STR-SZ-BS-103.7
GR FLOOR OVERALL 25 GR FLOOR FRAMING PLAN ARBOUR-STR-SZ-BS-104
26 GR FLOOR FRAMING PART PLAN-1 ARBOUR-STR-SZ-BS-104.1
27 GR FLOOR FRAMING PART PLAN-2 ARBOUR-STR-SZ-BS-104.2
28 GR FLOOR FRAMING PART PLAN-3 ARBOUR-STR-SZ-BS-104.3
29 GR FLOOR FRAMING PART PLAN-4 ARBOUR-STR-SZ-BS-104.4
30 GR FLOOR FRAMING PART PLAN-5 ARBOUR-STR-SZ-BS-104.5
31 GR FLOOR FRAMING PART PLAN-6 ARBOUR-STR-SZ-BS-104.6
32 GR FLOOR FRAMING PART PLAN-7 ARBOUR-STR-SZ-BS-104.7
TOWER D STILT 33 TOWER D STILT FRAMING PLAN ARBOUR-STR-SZ-BS-105.1
TOWER E STILT 34 TOWER E STILT FRAMING PLAN ARBOUR-STR-SZ-BS-105.2
1ST FLOOR 35 TOWER 1ST FLOOR FRAMING PLAN ARBOUR-STR-SZ-BS-110.1
TOWER TYPE FLOOR FRAMING
TIER 1 36 ARBOUR-STR-SZ-BS-111
PLAN-TIER 1
TOWER TYPE FLOOR FRAMING
TIER 2 37 ARBOUR-STR-SZ-BS-112
PLAN-TIER 2
TOWER TYPE FLOOR FRAMING
TIER 3 38 ARBOUR-STR-SZ-BS-113
PLAN-TIER 3
BASEMENT-1 FLOOR PLAN
BASEMENT 1 39 ARBOUR-AR-SZ-BS-101
(SOUTH POCKET)
BASEMENT-1 FLOOR PLAN (PART-
40 ARBOUR-AR-SZ-BS-101.1
1 ) (SOUTH POCKET)
BASEMENT-1 FLOOR PLAN (PART-
41 ARBOUR-AR-SZ-BS-101.2
2 ) (SOUTH POCKET)
BASEMENT-1 FLOOR PLAN (PART-
42 ARBOUR-AR-SZ-BS-101.3
3 ) (SOUTH POCKET)
BASEMENT-1 FLOOR PLAN (PART-
43 ARBOUR-AR-SZ-BS-101.4
4 ) (SOUTH POCKET)
BASEMENT-1 FLOOR PLAN (PART-
44 ARBOUR-AR-SZ-BS-101.5
5 ) (SOUTH POCKET)
BASEMENT-2 FLOOR PLAN
BASEMENT 2 45 ARBOUR-AR-SZ-BS-102
(SOUTH POCKET)
BASEMENT-2 FLOOR PLAN (PART-
46 ARBOUR-AR-SZ-BS-102.1
1 ) (SOUTH POCKET)
BASEMENT-2 FLOOR PLAN (PART-
47 ARBOUR-AR-SZ-BS-102.2
2 ) (SOUTH POCKET)
BASEMENT-2 FLOOR PLAN (PART-
48 ARBOUR-AR-SZ-BS-102.3
3) (SOUTH POCKET)
BASEMENT-2 FLOOR PLAN (PART-
49 ARBOUR-AR-SZ-BS-102.4
4 ) (SOUTH POCKET)
BASEMENT-2 FLOOR PLAN (PART-
50 ARBOUR-AR-SZ-BS-102.5
5 ) (SOUTH POCKET)
BASEMENT-3 FLOOR PLAN
BASEMENT 3 51 ARBOUR-AR-SZ-BS-102
(SOUTH POCKET)
BASEMENT-3 FLOOR PLAN (PART-
52 ARBOUR-AR-SZ-BS-103.1
1 ) (SOUTH POCKET)
BASEMENT-3 FLOOR PLAN (PART-
53 ARBOUR-AR-SZ-BS-103.2
2) (SOUTH POCKET)
BASEMENT-3 FLOOR PLAN (PART-
54 ARBOUR-AR-SZ-BS-103.3
3 ) (SOUTH POCKET)
BASEMENT-3 FLOOR PLAN (PART-
55 ARBOUR-AR-SZ-BS-103.4
4 ) (SOUTH POCKET)
BASEMENT-3 FLOOR PLAN (PART-
56 ARBOUR-AR-SZ-BS-103.5
5 ) (SOUTH POCKET)
EXTERNAL WALL SYSTEM
E
FIRE
1 EWS LOADING DIAGRAM ARBOUR-STR-SZ-TYP-030
2 EWS FOUNDATION PLAN ARBOUR-STR-SZ-EWS-131
EWS GR FLOOR FRAMING PLAN ARBOUR-STR-SZ-EWS-132
EWS TYPICAL FLOOR FRAMING ARBOUR-STR-SZ-EWS-133
F FLOOR SECTION
TOWER TYPICAL FLOOR SECTION
1 ARBOUR-STR-SZ-TYP-220.1
DETAILS
G SLAB ON GRADE
TYPICAL SLAB ON GRADE
1 ARBOUR-STR-SZ-TYP-410
DETAILS-1
TYPICAL SLAB ON GRADE
ARBOUR-STR-SZ-TYP-411
DETAILS-2
F SHEAR WALL AND COLUMN
SHEAR WALL 1 TYPICAL SHEAR WALL DETAILS-1 ARBOUR-STR-SZ-TYP-420
SHEAR WALL 2 TYPICAL SHEAR WALL DETAILS-2 ARBOUR-STR-SZ-TYP-421
TYPICAL SHEAR WALL OPENING
SHEAR WALL OPENING 3 ARBOUR-STR-SZ-TYP-423
DETAILS
ACC BLOCK WALL 4 TYPICAL DETAILS OF ACC BLOCK ARBOUR-STR-SZ-TYP-424
TYPICAL CONCRETE COLUMNS
CONCRETE COLUMN 5 ARBOUR-STR-SZ-TYP-430
DETAILS-1
TYPICAL CONCRETE COLUMNS
CONCRETE COLUMN 6 ARBOUR-STR-SZ-TYP-431
DETAILS-2
TYPICAL CONCRETE COLUMNS
CONCRETE COLUMN 7 ARBOUR-STR-SZ-TYP-432
DETAILS-3
FOR SHEAR WALL AND COLUMN SETTING OUT PLAN
8 ARBOUR-AR-SZ-TD-110
COLUMNS MEASUREMENTS TOWER-D (BASEMENT-1)
FOR SHEAR WALL AND COLUMN SETTING OUT PLAN
9 ARBOUR-AR-SZ-TE-110
COLUMNS MEASUREMENTS TOWER-E (BASEMENT-1)
FOR SHEAR WALL AND COLUMN SETTING OUT PLAN
10 ARBOUR-AR-SZ-TD-111
COLUMNS MEASUREMENTS TOWER-D (BASEMENT-2)
FOR SHEAR WALL AND COLUMN SETTING OUT PLAN
11 ARBOUR-AR-SZ-TE-111
COLUMNS MEASUREMENTS TOWER-E(BASEMENT-2)
FOR SHEAR WALL AND COLUMN SETTING OUT PLAN
12 ARBOUR-AR-SZ-TD-112
COLUMNS MEASUREMENTS TOWER-E (BASEMENT-3)
FOR SHEAR WALL AND COLUMN SETTING OUT PLAN
13 ARBOUR-AR-SZ-TE-112
COLUMNS MEASUREMENTS TOWER-D (BASEMENT-3)
SHEAR WALL ROUTE TO
14 TOWER SHEAR WALL KEY PLAN ARBOUR-STR-SZ-TYP-301.1
REINFORCEMENT
SHEAR WALL TOWER SHEAR WALL KEY
15 ARBOUR-STR-SZ-TYP-301.2
REINFORCEMENT DETAILS
SHEAR WALL TOWER SHEAR WALL KEY
16 ARBOUR-STR-SZ-TYP-301.3
REINFORCEMENT DETAILS
SHEAR WALL TOWER SHEAR WALL KEY
17 ARBOUR-STR-SZ-TYP-301.4
REINFORCEMENT DETAILS
SHEAR WALL TOWER SHEAR WALL KEY
18 ARBOUR-STR-SZ-TYP-301.5
REINFORCEMENT DETAILS
SHEAR WALL TOWER SHEAR WALL KEY
19 ARBOUR-STR-SZ-TYP-301.6
REINFORCEMENT DETAILS
SHEAR WALL TOWER SHEAR WALL KEY
20 ARBOUR-STR-SZ-TYP-301.7
REINFORCEMENT DETAILS
SHEAR WALL TOWER SHEAR WALL KEY
21 ARBOUR-STR-SZ-TYP-301.8
REINFORCEMENT DETAILS
SHEAR WALL TOWER SHEAR WALL KEY
22 ARBOUR-STR-SZ-TYP-301.9
REINFORCEMENT DETAILS
23 TOWER COLUMN SCHEDULE-1 ARBOUR-STR-SZ-TYP-304.1
FLOOR TO WALL
G
CONNECTION
TYPICAL FLOOR TO WALL
1 ARBOUR-STR-SZ-TYP-422
CONNECTION DETAILS
H BEAM
1 TYPICAL CONCRETE BEAM ARBOUR-STR-SZ-TYP-440
2 TYPICAL CONCRETE BEAM ARBOUR-STR-SZ-TYP-441
TYPICAL CONCRETE
ARBOUR-STR-SZ-TYP-442
3 PENETRATION DETAILS
4 TYPICAL COUPLING BEAM ARBOUR-STR-SZ-TYP-445
5 TYPICAL COUPLING BEAM ARBOUR-STR-SZ-TYP-446
I SLAB
TYPICAL CONCRETE SLAB
1 ARBOUR-STR-SZ-TYP-450
DETAILS-1
TYPICAL CONCRETE SLAB
2 ARBOUR-STR-SZ-TYP-451
DETAILS-2
TYPICAL CONCRETE SLAB
3 ARBOUR-STR-SZ-TYP-452
DETAILS-3
TYPICAL CONCRETE SLAB ARBOUR-STR-SZ-TYP-453
4
DETAILS-4
J FOUNDTION WALL
TYPICAL FOUNDATION WALL
1 ARBOUR-STR-SZ-TYP-461
DETAILS
DRAIN FOR SHUTTLE AND
K FIRE PIT
TYPICAL DRAIN DOR SHUTTLE GH63-WD-SA-PL-103A
1 AND FIRE LIFT PIT