0% found this document useful (0 votes)
30 views22 pages

SF-1 MV Cross Arm

The document provides detailed general arrangement (GA) descriptions for various configurations of 30KV and 33KV MV lines, including specifications for different types of cross arms and pole configurations. It includes quantities for approved surveys, items yet to be erected, and stacking and erection statuses for multiple line segments. The document serves as a comprehensive reference for the installation and management of electrical infrastructure in specific corridors.

Uploaded by

Tarik Khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
30 views22 pages

SF-1 MV Cross Arm

The document provides detailed general arrangement (GA) descriptions for various configurations of 30KV and 33KV MV lines, including specifications for different types of cross arms and pole configurations. It includes quantities for approved surveys, items yet to be erected, and stacking and erection statuses for multiple line segments. The document serves as a comprehensive reference for the installation and management of electrical infrastructure in specific corridors.

Uploaded by

Tarik Khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 22

Sr.No.

10

11

12
13

14

15
Arrangement Description

GA for MV Line

GA OF 30KV & 33KV LINE - NV2 TYPE CROSS ARM AT (0°-3°) ANGLE DEVIATION ON 12Mtr.
OCTAGONAL POLE 400 DAN SUITABLE FOR 54.6SQMM CONDUCTOR

GA OF 30KV & 33KV LINE - NV5 TYPE CROSS ARM AT (0°-3°) ANGLE DEVIATION ON 12Mtr.
OCTAGONAL POLE 650 DAN SUITABLE FOR 148SQMM CONDUCTOR

GA OF 30KV & 33KV LINE -INTERMEDIATE RIGID CROSSARM AT (0°-3°) ANGLE DEVIATION ON
12Mtr. OCTAGONAL POLE 400 DAN SUITABLE FOR 54.6SQMM AND 148SQMM CONDUCTOR

GA OF 30KV & 33KV LINE - DOUBLE ANCHROING CROSS ARM AT (3°-30°) ANGLE DEVIATION
ON 12Mtr. OCTAGONAL POLE 1250 DAN SUITABLE FOR 54.6SQMM AND 148SQMM
CONDUCTOR

GA OF 30KV & 33KV LINE - DOUBLE ANCHROING CROSS ARM (30°-60°) ANGLE DEVIATION ON
12Mtr. OCTAGONAL POLE 1250 DAN SUITABLE FOR 54.6SQMM AND 148SQMM CONDUCTOR

GA OF 30KV & 33KV LINE - SINGLE ANCHROING CROSS ARM AT DEAD END LOCATION ON
12Mtr. OCTAGONAL POLE 1600 DAN SUITABLE FOR 54.6SQMM AND 148SQMM CONDUCTOR

GA OF 30KV & 33KV LINE - TAPPING ARRANGEMENT FROM NV2 CROSS ARM ON 12Mtr.
OCTAGONAL POLE 1250 DAN SUITABLE FOR 54.6SQMM CONDUCTOR

GA OF 30KV & 33KV 50,100,160,250 & 400KVA DTR ON 12Mtr. OCTAGONAL POLE 1600
DAN(IN LINE)

GA OF 30KV & 33KV 50,100,160,250 & 400KVA DTR ON 12Mtr. OCTAGONAL POLE 1600
DAN(DEAD END)

GA OF 30KV & 33KV LINE DP SINGLE CIRCUIT - CROSSING THROUGH UG CABLE 1C x


240Sq.MM ON 14Mtr. OCTAGONAL POLE 1600 DAN

GA OF 30KV & 33KV LINE DOUBLE CIRCUIT - SINGLE ANCHROING CROSS ARM (0°-3°) ANGLE
DEVIATION ON 14Mtr. OCTAGONAL POLE 650 DAN SUITABLE FOR 54.6SQMM AND 148SQMM
CONDUCTOR
GA OF 30KV & 33KV LINE DOUBLE CIRCUIT - DOUBLE ANCHROING CROSS ARM MORE THAN 3°
ANGLE DEVIATION ON 14Mtr. OCTAGONAL POLE 1600/2000 DAN SUITABLE FOR 54.6SQMM
AND 148SQMM CONDUCTOR
GA OF 30KV & 33KV LINE DOUBLE CIRCUIT - SINGLE ANCHROING CROSS ARM AT DEAD END
LOCATION ON 14Mtr. OCTAGONAL POLE 1600/ 2000 DAN SUITABLE FOR 54.6SQMM AND
148SQMM CONDUCTOR

GA OF MANUAL AB SWITCH ON 12MTR. OCTAGONAL POLE 1600 DAN ( 30KV & 33KV IN LINE )
SINGLE POLE

REMOTE LBS
Soma to Ferafeni Corridor

(Approved Survey Qty)

(Approved Survey Qty)


Yet To be Erected
As per Stacking

As per Erection
As per Design

As per Design
Drawings No. Unit

KEI/EPC/GMB/ECO/GA/NV2/01 Nos 236 115 33 202

KEI/EPC/GMB/ECO/GA/NV5/01 Nos 594 593 73 520

KEI/EPC/GMB/ECO/GA/NVR2/01
Set 53 37 12 39
KEI/EPC/GMB/ECO/GA/NVR2/02

KEI/EPC/GMB/ECO/GA/SP/01
Set 131 104 17 123

KEI/EPC/GMB/ECO/GA/DP/01
Set 42 32 - 32

KEI/EPC/GMB/ECO/GA/DP/03 Set - - - -

KEI/EPC/GMB/ECO/GA/NV2/02
Set 17 11 - 17

KEI/EPC/GMB/ECO/DTR/GA/01 Set 67 66 3 65

KEI/EPC/GMB/ECO/DTR/GA/02 Set 13 7 - 13

KEI/EPC/GMB/ECO/GA/DP/UG02 Set 9 12 - 12 6

KEI/EPC/GMB/ECO/GA/SP/05 Set 684 660 237 423 645

KEI/EPC/GMB/ECO/GA/SP/08 Set 111 123 - 123 108


KEI/EPC/GMB/ECO/GA/DP/04 Set 12 18 - 18 6

KEI/EPC/GMB/ECO/GA/ABS/01 Set 13 7 - 13 -

- Set 11 11 - 11 8
As per Stacking

120
621
9
As per Erection

-
-

237
Yet To be Erected

120
384
9
Soma to Ferafeni Corridor (148 sqmm)

As per Design
(Approved Survey Qty)

3
3

39
As per Stacking

39

3
3
As per Erection

-
-
-
GNPC to Ferafenni (148 sqmm)

Yet To be Erected

39

3
3
As per Design
(Approved Survey Qty)

3
2
1

13
12
185

As per Stacking
12
15
180

3
1
1
(148 sqmm)

As per Erection

-
-
-
-
-
34
ALBREDA-MEDINA SERIGNE MASS
12 - 12 6 6 - 6

- - -

8 - 8 2 2 -
Yet To be Erected qmm)
A SERIGNE MASS

12
15
146

3
1
1
As per Design
(Approved Survey Qty)

1
2
1
9
20
22
115
As per Stacking

24
20
113

1
1
1
9
As per Erection

-
-
-
-
39

6
8
Yet To be Erected
KUNTAIR- JURUNKU (148 sqmm)

-
18
12
74

1
1
1
9
As per Design
(Approved Survey Qty)

2
7
1

17
20
294

As per Stacking

-
18
11
10
300

3
1

As per Erection

-
-
-
-
-
-
Staking Not Done
Kerewan-mintukunda (148 sqmm)

Yet To be Erected

-
-
-
-
-
-

18
11
10
300

3
1

As per Design
(Approved Survey Qty)

1
1
1
5

19
35
FASSNJA-JAMAGEN
-

2 1 1 - 1 1 1 1
As per Stacking

19
34

1
2
1
5
As per Erection

-
-
-
8
Yet To be Erected
FASSNJA-JAMAGEN (54.6 sqmm)

-
-
-
-
-
-

19
26

1
2
1
5
As per Design
(Approved Survey Qty)

1
1
7
3
17

As per Stacking
17

1
1
7
3 As per Erection

-
-
17

7
3

- Yet To be Erected
-
-

1
1
MBOLETBAH- MBANKAM(54.6 sqmm)

As per Design
(Approved Survey Qty)

1
1
5
1
8

As per Stacking

1
1
4
1
8
sqmm)

As per Erection

-
-
4
1
8
MEDINA SOTOKOI-BUSURA (54.6
-

1 - 1 1 1 - 1 1 1 -

-
Yet To be Erected mm)
OI-BUSURA (54.6

-
-
-
-

1
1
As per Design
(Approved Survey Qty)

1
1
1
7
2
11
As per Stacking

11

1
1
1
7
2
As per Erection

-
-
-
-
-
-

Yet To be Erected
NJAMBOUR-MAMUDA(54.6 sqmm)

11

1
1
1
7
2 As per Design
(Approved Survey Qty)

1
1
3
4

10
As per Stacking
10

1
1
3
4

As per Erection

-
-
-
-
-
-
TOFF-BAKALARR (54.6 sqmm)

Yet To be Erected
10

1
1
3
4

As per Design
(Approved Survey Qty)

1
1
1
8
1
41
MUNYAGEN-KARA
sqmm)
1 1 1 - 1 1 1 - 1 1
As per Stacking

41

1
1
1
8
1
sqmm)

As per Erection

-
-
-
-
-
-
MUNYAGEN-KARANTABA (54.6

Yet To be Erected

41

1
1
1
8
1
As per Design
(Approved Survey Qty)

1
1
2
3
4

As per Stacking

As per Erection
TOFF-MAKKA FERAFENNI
(54.6 sqmm) Staking Not Done

Yet To be Erected

-
-
-
-
-
-
-

1
1
2
3
4

As per Design
(Approved Survey Qty)

1
1
1
1

12
38

As per Stacking

As per Erection
(54.6 sqmm) Staking Not Done
NDANKANDANKA-KUBANDAR
-

1 - 1 1 1 1

-
aking Not Done
KA-KUBANDAR
Yet To be Erected

-
-
-
-
-
-

1
1
1
12
1
38
As per Design
(Approved Survey Qty)

1
1
2
4
5
As per Stacking

As per Erection
Staking Not Done
TOFF-JAJARI (54.6 sqmm)

Yet To be Erected

-
-
-
-
-
-
-

1
1
2
4
5

As per Design
(Approved Survey Qty)
45

1
1
1
9
5

As per Stacking

As per Erection
Staking Not Done

Yet To be Erected
ILLIASA-KATCHANG (54.6 sqmm)

-
-
-
-
-
-

1
1
1
9
5
45

As per Design
(Approved Survey Qty)
12

1
1
4
1
TOFF-ALKALI KUN
(54.6 sqmm) Staking N
- - -

1 1 1 1 1 1

- - -
As per Stacking

As per Erection
TOFF-ALKALI KUNDA
(54.6 sqmm) Staking Not Done

Yet To be Erected

-
-
-
-
-
-
-

1
1
4
1
12
As per Design
(Approved Survey Qty)

1
1
7
16

As per Stacking

As per Erection
Staking Not Done
TOFF-JUMANSARI (54.6 sqmm)

Yet To be Erected

-
-
-
-
-
-
-
-

1
1
7
16

As per Design
(Approved Survey Qty)

40
As per Stacking

-
-
-
-
-
-
-
-
-
-
-

40
MV LINE

As per Erection

3
IN-LINE DTR UNDER EXTING
- - -

1 1 1 -

- - -
UNDER EXTING
V LINE Yet To be Erected

37

-
-