Project Name Construction of Chennai Peripheral Ring Road Package-I (North Port Access Road) (NPAR) Connecting Ennore Port with Thatchur on AH-45 - Package-I (Civil Works)
1 29-Jan-25 Highway 301 70140 Checking Of Excavation For Retaining Wall - SR(LHS) 11+775 11+780 LHS 30-Jan-25 10:00 AM Mr.Ramesh
2 29-Jan-25 Highway 311 70141 Checking Of PCC For Retaining Wall - SR(LHS) 11+775 11+780 LHS 30-Jan-25 12:00 PM Mr.Ramesh
Checking Of Excavation For Return Wall (A2 Side) - SR(RHS) Thatchur Row
3 29-Jan-25 Highway 301 70142 11+770 RHS 30-Jan-25 10:00 AM Mr.Ramesh
End
4 29-Jan-25 Highway 302 70143 Checking Of PCC For Return Wall (A2 Side) - SR(RHS) Thatchur Row End 11+770 RHS 30-Jan-25 2:00 PM Mr.Ramesh
5 29-Jan-25 Highway 301 70144 Checking Of Excavation For Return Wall (A1 Side) - SR(RHS) Ennore Row End 11+770 RHS 30-Jan-25 10:00 AM Mr.Ramesh
6 29-Jan-25 Highway 302 70145 Checking Of PCC For Return Wall (A1 Side) - SR(RHS) Ennore Row End 11+770 RHS 30-Jan-25 2:00 PM Mr.Ramesh
7 29-Jan-25 Highway 313 70146 Checking of Wall Reinforcement For Retaining Wall - SR(RHS) 13+860 13+880 LHS 30-Jan-25 10:00 AM Mr.Ramesh
8 29-Jan-25 Highway 312 70147 Checking of Wall Concreting(M30) For Retaining Wall - SR(RHS) 13+860 13+880 LHS 30-Jan-25 2:00 PM Mr.Ramesh
9 29-Jan-25 Highway 313 70148 Checking of Wall Reinforcement For Retaining Wall - SR(RHS) 13+980 14+000 LHS 30-Jan-25 10:00 AM Mr.Ramesh
10 29-Jan-25 Highway 312 70149 Checking of Wall Concreting(M30) For Retaining Wall - SR(RHS) 13+980 14+000 LHS 30-Jan-25 2:00 PM Mr.Ramesh
11 29-Jan-25 Highway 313 70150 Checking of Wall Reinforcement For Retaining Wall - SR(RHS) 13+850 13+860 LHS 30-Jan-25 10:00 AM Mr.Ramesh
12 29-Jan-25 Highway 312 70151 Checking of Wall Concreting(M30) For Retaining Wall - SR(RHS) 13+850 13+860 LHS 30-Jan-25 2:00 PM Mr.Ramesh
13 29-Jan-25 Highway 313 70152 Checking of Raft Reinforcement For Retaining Wall - SR(RHS) 14+080 14+100 RHS 30-Jan-25 10:00 AM Mr.Ramesh
14 29-Jan-25 Highway 312 70153 Checking of Raft Concreting(M30) For Retaining Wall - SR(RHS) 14+080 14+100 RHS 30-Jan-25 2:00 PM Mr.Ramesh
15 29-Jan-25 Highway 313 70154 Checking of Raft Reinforcement For Retaining Wall - SR(RHS) 15+460 15+480 RHS 30-Jan-25 10:00 AM Mr.Ramesh
16 29-Jan-25 Highway 312 70155 Checking of Raft Concreting(M30) For Retaining Wall - SR(RHS) 15+460 15+480 RHS 30-Jan-25 2:00 PM Mr.Ramesh
17 29-Jan-25 Highway 313 70156 Checking of Raft Reinforcement For Retaining Wall - SR(RHS) 15+480 15+485.6 RHS 30-Jan-25 10:00 AM Mr.Ramesh
18 29-Jan-25 Highway 312 70157 Checking of Raft Concreting(M30) For Retaining Wall - SR(RHS) 15+480 15+485.6 RHS 30-Jan-25 2:00 PM Mr.Ramesh
19 29-Jan-25 Highway 313 70158 Checking of Raft Reinforcement For Retaining Wall - SR(RHS) 15+485.6 RHS 30-Jan-25 10:00 AM Mr.Ramesh
20 29-Jan-25 Highway 312 70159 Checking of Raft Concreting(M30) For Retaining Wall - SR(RHS) 15+485.6 RHS 30-Jan-25 2:00 PM Mr.Ramesh
21 29-Jan-25 Highway 313 70160 Checking of Raft Reinforcement For Retaining Wall - SR(RHS) 15+485.6 15+500 RHS 30-Jan-25 10:00 AM Mr.Ramesh
22 29-Jan-25 Highway 312 70161 Checking of Raft Concreting(M30) For Retaining Wall - SR(RHS) 15+485.6 15+500 RHS 30-Jan-25 2:00 PM Mr.Ramesh
Project Name Construction of Chennai Peripheral Ring Road Package-I (North Port Access Road) (NPAR) Connecting Ennore Port with Thatchur on AH-45 - Package-I (Civil Works)
23 29-Jan-25 Highway 313 70162 Checking of Wall Reinforcement For Retaining Wall - SR(RHS) 15+260 15+280 RHS 30-Jan-25 10:00 AM Mr.Ramesh
24 29-Jan-25 Highway 312 70163 Checking of Wall Concreting(M30) For Retaining Wall - SR(RHS) 15+260 15+280 RHS 30-Jan-25 2:00 PM Mr.Ramesh
27 29-Jan-25 Highway 301 70166 Checking Of Excavation For Retaining Wall - SR(LHS) 17+540 17+710 LHS 30-Jan-25 10:00 AM Mr.Ramesh
28 29-Jan-25 Highway 311 70167 Checking Of PCC For Retaining Wall - SR(LHS) 17+540 17+710 LHS 30-Jan-25 12:00 PM Mr.Ramesh
Checking Of Excavation For Return Wall (A2 Side) - SR(RHS) Thatchur Row
29 29-Jan-25 Highway 301 70168 18+480 RHS 30-Jan-25 10:00 AM Mr.Ramesh
End
30 29-Jan-25 Highway 302 70169 Checking Of PCC For Return Wall (A2 Side) - SR(RHS) Thatchur Inner End 18+480 RHS 30-Jan-25 2:00 PM Mr.Ramesh
31 29-Jan-25 Highway 301 70170 Checking Of Excavation For Return Wall (A1 Side) - SR(RHS) Ennore Row End 18+480 RHS 30-Jan-25 10:00 AM Mr.Ramesh
32 29-Jan-25 Highway 302 70171 Checking Of PCC For Return Wall (A1 Side) - SR(RHS) Ennore Row End 18+480 RHS 30-Jan-25 2:00 PM Mr.Ramesh
Checking Of Excavation For Return Wall (A2 Side) - SR(LHS) Thatchur Row
33 29-Jan-25 Highway 301 70172 18+480 LHS 30-Jan-25 10:00 AM Mr.Ramesh
End
34 29-Jan-25 Highway 302 70173 Checking Of PCC For Return Wall (A2 Side) - SR(LHS) Thatchur Inner End 18+480 LHS 30-Jan-25 2:00 PM Mr.Ramesh
35 29-Jan-25 Highway 301 70174 Checking Of Excavation For Return Wall (A1 Side) - SR(LHS) Ennore Row End 18+480 LHS 30-Jan-25 10:00 AM Mr.Ramesh
36 29-Jan-25 Highway 302 70175 Checking Of PCC For Return Wall (A1 Side) - SR(LHS) Ennore Row End 18+480 LHS 30-Jan-25 2:00 PM Mr.Ramesh
37 29-Jan-25 Highway 731 70176 Checking Of RE Panel Erection 6th Layer with Geostrip Locking - MCW(RHS) 11+880 12+000 RHS 30-Jan-25 2:30 PM Mr.Ramesh
38 29-Jan-25 Highway 731 70177 Checking Of RE Panel Erection 6th Layer with Geostrip Locking - MCW(LHS) 11+880 12+000 LHS 30-Jan-25 2:30 PM Mr.Ramesh
Checking of FDD Embankment 10th layer - Borrow Soil (Retained zone Above
39 29-Jan-25 Highway 205 70178 12+170 12+229 RHS 30-Jan-25 3:30 PM Mr. Ramesh
Ground Level) - MCW(RHS)
Cheking of FDD Embankment 1st Layer for Diversion Road (A1 Side) - Borrow
40 29-Jan-25 Highway 205 70179 12+304 30-Jan-25 10:00 AM Mr.Ramesh
Soil
Checking of FDD Embankment 12th layer - Pond Ash (Retained zone Above
41 29-Jan-25 Highway 206 70180 13+931.5 14+017 RHS 30-Jan-25 4:30 PM Mr. Ramesh
Ground Level)
Checking of FDD Embankment 2nd layer - Pond Ash (Retained zone Above
42 29-Jan-25 Highway 206 70181 13+931.5 14+020 LHS 30-Jan-25 4:30 PM Mr. Ramesh
Ground Level)
Checking of FDD Embankment 14th layer - Pond Ash (Retained zone Above
43 29-Jan-25 Highway 206 70182 14+017 14+110 RHS 30-Jan-25 4:30 PM Mr. Ramesh
Ground Level)
Checking of FDD Embankment 14th layer - Pond Ash (Retained zone Above
44 29-Jan-25 Highway 206 70183 14+020 14+110 LHS 30-Jan-25 4:30 PM Mr. Ramesh
Ground Level)
Project Name Construction of Chennai Peripheral Ring Road Package-I (North Port Access Road) (NPAR) Connecting Ennore Port with Thatchur on AH-45 - Package-I (Civil Works)
RHS +Truck
46 29-Jan-25 Highway 205 70185 Checking of FDD and Level for Embankment Top Layer - Borrow Soil 18+600 18+700 30-Jan-25 4:00 PM Mr.Ramesh
Lay Bay
Checking of FDD Embankment 13th layer - Pond Ash (Reinforced zone Above
47 29-Jan-25 Highway 206 70186 11+423 11+450 RHS 30-Jan-25 11:00 AM Mr. Ramesh
Ground Level) - MCW(RHS)
48 29-Jan-25 Highway 737 70187 Checking of Filter Media 13th Layer for RE Wall - MCW(RHS) 11+423 11+450 RHS 30-Jan-25 11:00 AM Mr.Ramesh
49 29-Jan-25 Highway 737 70188 Checking of Filter Media 13th Layer for RE Wall Closing Wall 6A & 6B 11+355 30-Jan-25 11:00 AM Mr.Ramesh
50 29-Jan-25 Highway 309(ii) 70189 Checking of Raft Reinforcement For Drain (Type-2) - SR(RHS) 15+370 15+420 RHS 30-Jan-25 11:30 AM Mr. Ramesh
51 29-Jan-25 Highway 309(ii) 70190 Checking of Raft Concreting For Drain (Type-2) - SR(RHS) 15+370 15+420 RHS 30-Jan-25 11:30 AM Mr. Ramesh
52 29-Jan-25 Highway 309(iii) 70191 Checking of Raft Reinforcement For Drain (Type-3C) - SR(RHS) 15+270 15+290 RHS 30-Jan-25 11:30 AM Mr. Ramesh
53 29-Jan-25 Highway 309(iii) 70192 Checking of Raft Concreting For Drain (Type-3C) - SR(RHS) 15+270 15+290 RHS 30-Jan-25 11:30 AM Mr. Ramesh
54 29-Jan-25 Highway 309(ii) 70193 Checking of PCC for Drain (Type-2) - MCW(RHS) 10+540 10+590 RHS 30-Jan-25 10:30 AM Mr. Ramesh
55 29-Jan-25 Highway 309(iii) 70194 Checking of Raft Reinforcement For Drain (Type-3B) - MCW(RHS) 10+730 10+750 RHS 30-Jan-25 10:30 AM Mr. Ramesh
56 29-Jan-25 Highway 309(iii) 70195 Checking of Raft Concreting For Drain (Type-3B) - MCW(RHS) 10+730 10+750 RHS 30-Jan-25 10:30 AM Mr. Ramesh
57 29-Jan-25 Highway 309(ii) 70196 Checking of PCC for Drain (Type-2A & 3C) - SR(RHS) 15+150 15+240 RHS 30-Jan-25 10:30 AM Mr. Ramesh
58 29-Jan-25 Highway 309(i) 70197 Checking of Slab Reinforcement For Drain - MCW(RHS) 18+435 18+460 RHS 30-Jan-25 10:30 AM Mr. Ramesh
59 29-Jan-25 Highway 309(i) 70198 Checking of Slab Concreting For Drain - MCW(RHS) 18+435 18+460 RHS 30-Jan-25 10:30 AM Mr. Ramesh
60 29-Jan-25 Highway 308 70199 Checking of Raft Reinforcement for Return Wall (A1) - RHS Row 0+260 RHS 30-Jan-25 10:30 AM Mr. Muthu Kumar
61 29-Jan-25 Highway 303 70200 Checking of Raft Concreting(M30) for Return Wall (A1) - RHS Row 0+260 RHS 30-Jan-25 2:30 PM Mr. Muthu Kumar
62 29-Jan-25 Highway 313 70201 Checking of RCC Wall Reinforcement For Retaining Wall - SR(LHS) L 0+840 L 0+860 LHS 30-Jan-25 10:30 AM Mr. Muthu Kumar
63 29-Jan-25 Highway 312 70202 Checking of RCC Wall Concreting(M30) SCC For Retaining Wall - SR(LHS) L 0+840 L 0+860 LHS 30-Jan-25 2:30 PM Mr. Muthu Kumar
64 29-Jan-25 Highway 313 70203 Checking of RCC Wall Reinforcement For Retaining Wall (0 to 20) - SR(RHS) L 0+765.67 L RHS 30-Jan-25 10:30 AM Mr. Muthu Kumar
Checking of RCC Wall Reinforcement for Return Wall (1st Lift) (A2 ) - RHS
66 29-Jan-25 Highway 308 70205 0+260 RHS 30-Jan-25 10:30 AM Mr. Muthu Kumar
Row
Project Name Construction of Chennai Peripheral Ring Road Package-I (North Port Access Road) (NPAR) Connecting Ennore Port with Thatchur on AH-45 - Package-I (Civil Works)
68 29-Jan-25 Highway 313 70207 Checking of RCC Wall Reinforcement For Retaining Wall (Extended) (A1) L1+178 RHS 30-Jan-25 10:30 AM Mr. Muthu Kumar
Cheking of FDD Embankment 1st Layer - Pond Ash (Reinforced Zone Below
70 29-Jan-25 Highway 206 70209 0+580 0+610 LHS 30-Jan-25 9:30 AM Mr. Sandip
Ground Level) (Ennore Side) (Wall-2)
Cheking of FDD Embankment 2nd Layer - Pond Ash (Reinforced Zone Below
71 29-Jan-25 Highway 206 70210 0+580 0+610 LHS 30-Jan-25 12:30 PM Mr. Sandip
Ground Level) (Ennore Side) (Wall-2)
Cheking of FDD Embankment 3rd Layer - Pond Ash (Reinforced Zone Below
72 29-Jan-25 Highway 206 70211 0+580 0+610 LHS 30-Jan-25 2:30 PM Mr. Sandip
Ground Level) (Ennore Side) (Wall-2)
73 29-Jan-25 Highway 541 70212 Checking of Filter Media 6th Layer for RE Wall (Wall-4) K 0+060 K 0+200 LHS 30-Jan-25 11:30 AM Mr. Sandip
Cheking of FDD Embankment 4th Layer - Pond Ash (Reinforced Zone Above
74 29-Jan-25 Highway 206 70213 K 0+060 K 0+200 LHS 30-Jan-25 3:30 PM Mr. Sandip
Ground Level) (Wall-4)
Cheking of FDD Embankment 4th Layer - Pond Ash (Retained Zone Above
75 29-Jan-25 Highway 206 70214 K 0+060 K 0+200 LHS 30-Jan-25 3:30 PM Mr. Sandip
Ground Level) (Wall-4)
78 29-Jan-25 Highway 541 70217 Checking of Filter Media 6th Layer for RE Wall (Wall-2) 0+350 0+560 LHS 30-Jan-25 3:00 PM Mr. Sandip
Cheking of FDD Embankment 4th Layer - Pond Ash (Reinforced Zone Below
79 29-Jan-25 Highway 206 70218 0+000 0+020 LHS 30-Jan-25 9:30 AM Mr. Sandip
Ground Level) (Wall-4A)
Cheking of FDD Embankment 4th Layer - Pond Ash (Reinforced Zone Below
80 29-Jan-25 Highway 206 70219 0+000 0+028 LHS 30-Jan-25 9:30 AM Mr. Sandip
Ground Level) (Wall-2A)
Cheking of FDD Embankment 4th Layer - Pond Ash (Reinforced Zone Below
81 29-Jan-25 Highway 206 70220 0+000 0+045 BHS 30-Jan-25 10:30 AM Mr. Sandip
Ground Level) (Wall-5)
Cheking of FDD Embankment 5th Layer - Pond Ash (Reinforced Zone Below
82 29-Jan-25 Highway 206 70221 0+000 0+020 LHS 30-Jan-25 2:30 PM Mr. Sandip
Ground Level) (Wall-4A)
Cheking of FDD Embankment 5th Layer - Pond Ash (Reinforced Zone Below
83 29-Jan-25 Highway 206 70222 0+000 0+028 LHS 30-Jan-25 2:30 PM Mr. Sandip
Ground Level) (Wall-2A)
Cheking of FDD Embankment 5th Layer - Pond Ash (Reinforced Zone Below
84 29-Jan-25 Highway 206 70223 0+000 0+045 BHS 30-Jan-25 2:30 PM Mr. Sandip
Ground Level) (Wall-5)
85 29-Jan-25 Highway 401 70224 Cheking of FDD GSB Top Layer for Diversion Road at L 1+678 MNB 0+000 0+060 LHS 30-Jan-25 10:00 AM Mr. Prateek
86 29-Jan-25 Highway 205 70225 Checking of FDD Embankment 3rd layer - Borrow Soil - SR(RHS) 3+470 3+716 RHS 30-Jan-25 11:30 AM Mr. Prateek
87 29-Jan-25 Highway 205 70226 Checking of FDD Embankment 1st layer - Borrow Soil - SR(RHS) 5+222 5+418 RHS 30-Jan-25 10:30 AM Mr. Prateek
88 29-Jan-25 Highway 205 70227 Checking of FDD Embankment 2nd layer - Borrow Soil - SR(RHS) 5+422 5+628 RHS 30-Jan-25 12:30 PM Mr. Prateek
Project Name Construction of Chennai Peripheral Ring Road Package-I (North Port Access Road) (NPAR) Connecting Ennore Port with Thatchur on AH-45 - Package-I (Civil Works)
89 29-Jan-25 Highway 205 70228 Checking of FDD Embankment 2nd layer - Borrow Soil - SR(RHS) 5+632 5+883 RHS 30-Jan-25 2:30 PM Mr. Prateek
90 29-Jan-25 Highway 205 70229 Checking of FDD Embankment 2nd layer - Borrow Soil - SR(RHS) 5+887 6+131 RHS 30-Jan-25 4:30 PM Mr. Prateek
91 29-Jan-25 Structure Variation 70230 Checking of Slab Reinforcement at SVUP - MCW(BHS) 14+287 BHS 30-Jan-25 11:00 AM Mr. Ramesh
Checking of Pile Steel Liner Fabrication, Setting Out And Pitching For Pile No -
93 29-Jan-25 Structure 804 70232 L 2+811 LHS 30-Jan-25 12:00 AM Mr. Ajay Kumar
LP31-3 ROB
94 29-Jan-25 Structure 813(i) 70233 Reinforcement Cage Fabrication and Lowering For Pile No - LP31-3 ROB L 2+811 LHS 30-Jan-25 6:00 AM Mr. Ajay Kumar
Checking of Pile Steel Liner Fabrication, Setting Out And Pitching For Pile No -
96 29-Jan-25 Structure 804 70235 L 2+811 RHS 30-Jan-25 1:00 AM Mr. Ajay Kumar
RP31-3 ROB
97 29-Jan-25 Structure 813(i) 70236 Reinforcement Cage Fabrication and Lowering For Pile No - RP31-3 ROB L 2+811 RHS 30-Jan-25 7:00 AM Mr. Ajay Kumar
99 29-Jan-25 Structure 513(ii) 70238 Checking Of Reinforcement For Pier Cap - RA1 MJB 1+627 RHS 30-Jan-25 11:00 AM Mr. Satya
100 29-Jan-25 Structure 509 70239 Checking Of Survey, Shuttering And Concreting For Pier Cap - RA1 MJB 1+627 RHS 30-Jan-25 11:30 AM Mr. Satya
101 29-Jan-25 Structure 513(ii) 70240 Checking Of Reinforcement For Pier Cap - LP12 MJB 1+627 LHS 30-Jan-25 4:00 PM Mr. Aanand Maurya
102 29-Jan-25 Structure 509 70241 Checking Of Survey, Shuttering And Concreting For Pier Cap - LP12 MJB 1+627 LHS 30-Jan-25 4:30 PM Mr. Aanand Maurya
Checking of Survey , Shuttering and Concreting for Box Girder Segment - LP11-
104 29-Jan-25 Structure 70243 1+627(3+300 Casting Yard) LHS 30-Jan-25 12:00 PM Mr. Avinash Sahukar
LP12/S5-2 - MJB
Checking of Survey, Shuttering and Concreting for Box Girder Segment - LP7-
106 29-Jan-25 Structure 70245 1+627(3+300 Casting Yard) LHS 30-Jan-25 3:00 PM Mr. Avinash Sahukar
LP8/S4-1 - MJB
Checking of Survey, Shuttering and Concreting for Box Girder Segment - LP10-
108 29-Jan-25 Structure 70247 1+627(3+300 Casting Yard) LHS 30-Jan-25 5:00 PM Mr. Avinash Sahukar
LP11/S5-2 - MJB
109 29-Jan-25 Structure 813(ii) 70248 Checking Of Reinforcement For Pier Shaft - LP21 ROB L 2+811 LHS 30-Jan-25 9:00 AM Mr.Vinod Kumar
110 29-Jan-25 Structure 809 70249 Checking Of Survey, Shuttering And Concreting For Pier Shaft - LP21 ROB L 2+811 LHS 30-Jan-25 10:00 AM Mr.Vinod Kumar
Project Name Construction of Chennai Peripheral Ring Road Package-I (North Port Access Road) (NPAR) Connecting Ennore Port with Thatchur on AH-45 - Package-I (Civil Works)
111 29-Jan-25 Structure 813(ii) 70250 Checking Of Reinforcement For Pier Shaft - DP4 ROB L 2+811 LHS 30-Jan-25 9:00 AM Mr.Vinod Kumar
112 29-Jan-25 Structure 809 70251 Checking Of Survey, Shuttering And Concreting For Pier Shaft - DP4 ROB L 2+811 LHS 30-Jan-25 10:00 AM Mr.Vinod Kumar
113 29-Jan-25 Structure 801 70252 Checking Of Excavation For Pile Cap Upto PCC Bottom - LP28 ROB L 2+811 LHS 30-Jan-25 4:00 PM Mr.Vinod Kumar
114 29-Jan-25 Structure 802 70253 Checking Of Survey and PCC (M15) Laying For Pile Cap - LP28 ROB L 2+811 LHS 30-Jan-25 5:00 PM Mr.Vinod Kumar
115 29-Jan-25 Structure 813(i) 70254 Checking Of Reinforcement For Pile Cap - LP17 ROB L 2+811 LHS 30-Jan-25 4:00 PM Mr.Vinod Kumar
116 29-Jan-25 Structure 808 70255 Checking Of Survey, Shuttering And Concreting For Pile Cap - LP17 ROB L 2+811 LHS 30-Jan-25 5:00 PM Mr.Vinod Kumar
117 29-Jan-25 Structure 813(i) 70256 Checking Of Reinforcement For Pile Cap - LP15 ROB L 2+811 LHS 30-Jan-25 4:00 PM Mr.Vinod Kumar
118 29-Jan-25 Structure 808 70257 Checking Of Survey, Shuttering And Concreting For Pile Cap - LP15 ROB L 2+811 LHS 30-Jan-25 5:00 PM Mr.Vinod Kumar
121 29-Jan-25 Structure 725(ii) 70260 Checking of Free Bearing for LP2-LP3 Span POT/PTFE Bearing Fixing - 1 Nos 6+341 LHS 30-Jan-25 10:00 AM Mr. Mohan Babu
122 29-Jan-25 Structure 725(i) 70261 Checking of Fixed Bearing for LP2-LP3 Span POT/PTFE Bearing Fixing - 1 Nos 6+341 LHS 30-Jan-25 10:00 AM Mr. Mohan Babu
123 29-Jan-25 Structure Non BOQ 70262 Checking of Plate Load Test for Span - RP2-RA2 VUP 12+304 RHS 30-Jan-25 10:00 AM Mr. Abhishek
124 29-Jan-25 Structure 612(ii) 70263 Checking Of Reinforcement For Pier Cap - RSP2 MNB 18+165 RHS 30-Jan-25 2:00 PM Mr. Vikesh
125 29-Jan-25 Structure 609 70264 Checking Of Survey, Shuttering And Concreting For Pier Cap - RSP2 MNB 18+165 RHS 30-Jan-25 2:30 PM Mr. Vikesh
126 29-Jan-25 Structure 912(ii) 70265 Checking Of Reinforcement For Pier Shaft - LP6 IC 20+897 LHS 30-Jan-25 10:00 AM Mr. Amar Singh
127 29-Jan-25 Structure 909 70266 Checking Of Survey, Shuttering And Concreting For Pier Shaft - LP6 IC 20+897 LHS 30-Jan-25 11:00 AM Mr. Amar Singh
128 29-Jan-25 Survey Non BOQ 70267 Recording of OGL at Missing Link Road 3+680 3+900 BHS 30-Jan-25 10:00 AM Mr. Dillip Kumar
129 29-Jan-25 Survey Non BOQ 70268 Checking Of Retaining Wall Layout Coordinates 21+100 21+700 LHS 30-Jan-25 12:00 PM Mr. Dilip Kumar
130 29-Jan-25 Survey Non BOQ 70269 Checking Of Retaining Wall Layout Coordinates 21+100 21+700 RHS 30-Jan-25 2:00 PM Mr. Dilip Kumar
131 29-Jan-25 HSE Non BOQ 70270 Weekly Air Quality Monitoring for the Period (30.01.2025 to 31.01.2025) 3+200 30-Jan-25 10:00 AM Mr. S.K Inamur
132 29-Jan-25 Highway 401 70271 Checking of FDD For GSB 1st Layer for Retaining Wall Ground Improvement 9+027.5 9+029.7 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan
Project Name Construction of Chennai Peripheral Ring Road Package-I (North Port Access Road) (NPAR) Connecting Ennore Port with Thatchur on AH-45 - Package-I (Civil Works)
133 29-Jan-25 Highway 401 70272 Checking of FDD For GSB 2nd Layer for Retaining Wall Ground Improvement 3+750 3+775 LHS 30-Jan-25 10:00 AM Mr. Rajashekharan
134 29-Jan-25 Highway 401 70273 Checking of FDD For GSB 2nd Layer for Retaining Wall Ground Improvement 9+027.5 9+029.7 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan
135 29-Jan-25 Highway 207 70274 Checking of Subgrade Soil 1st Layer for Retaining Wall 5+876.2 5+877.5 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan
136 29-Jan-25 Highway 207 70275 Checking of Subgrade Soil 1st Layer for Retaining Wall 9+027.5 9+029.7 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan
137 29-Jan-25 Highway 207 70276 Checking of Subgrade Soil 2nd Layer for Retaining Wall 5+876.2 5+877.5 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan
138 29-Jan-25 Highway 207 70277 Checking of Subgrade Soil 2nd Layer for Retaining Wall 9+027.5 9+029.7 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan
139 29-Jan-25 Highway 311 70278 Checking Of PCC For Retaining Wall 3+100 3+110 LHS 30-Jan-25 10:00 AM Mr. Rajashekharan
140 29-Jan-25 Highway 311 70279 Checking Of PCC For Retaining Wall 3+462.95 3+463.32 LHS 30-Jan-25 10:00 AM Mr. Rajashekharan
141 29-Jan-25 Highway 311 70280 Checking Of PCC For Retaining Wall 5+225 5+225.15 LHS 30-Jan-25 10:00 AM Mr. Rajashekharan
142 29-Jan-25 Highway 311 70281 Checking Of PCC For Retaining Wall 9+027.5 9+029.7 LHS 30-Jan-25 10:00 AM Mr. Rajashekharan
143 29-Jan-25 Highway 311 70282 Checking Of PCC For Retaining Wall 9+864 9+864.09 LHS 30-Jan-25 10:00 AM Mr. Rajashekharan
144 29-Jan-25 Highway 311 70283 Checking Of PCC For Retaining Wall 9+875.91 9+876 LHS 30-Jan-25 10:00 AM Mr. Rajashekharan
145 29-Jan-25 Highway 311 70284 Checking Of PCC For Retaining Wall 10+170 10+174 LHS 30-Jan-25 10:00 AM Mr. Rajashekharan
146 29-Jan-25 Highway 311 70285 Checking Of PCC For Retaining Wall 13+684 13+684.83 LHS 30-Jan-25 10:00 AM Mr. Rajashekharan
147 29-Jan-25 Highway 311 70286 Checking Of PCC For Retaining Wall 20+174.76 20+175 LHS 30-Jan-25 10:00 AM Mr. Rajashekharan
148 29-Jan-25 Highway 311 70287 Checking Of PCC For Retaining Wall 5+225.23 5+227.5 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan
149 29-Jan-25 Highway 311 70288 Checking Of PCC For Retaining Wall 5+892.5 5+893.7 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan
150 29-Jan-25 Highway 311 70289 Checking Of PCC For Retaining Wall 5+635.12 5+637.6 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan
151 29-Jan-25 Highway 311 70290 Checking Of PCC For Retaining Wall 6+142 6+142.5 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan
152 29-Jan-25 Highway 311 70291 Checking Of PCC For Retaining Wall 9+875.48 9+880 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan
153 29-Jan-25 Highway 311 70292 Checking Of PCC For Retaining Wall 15+583.4 15+5583.41 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan
154 29-Jan-25 Highway 311 70293 Checking Of PCC For Retaining Wall 15+804.8 15+815 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan
Project Name Construction of Chennai Peripheral Ring Road Package-I (North Port Access Road) (NPAR) Connecting Ennore Port with Thatchur on AH-45 - Package-I (Civil Works)
155 29-Jan-25 Highway 311 70294 Checking Of PCC For Retaining Wall 20+250 20+270 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan
156 29-Jan-25 Highway 313 70295 Checking of Raft Reinforcement For Retaining Wall 3+507.5 3+510 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan
157 29-Jan-25 Highway 312 70296 Checking of Raft Concreting(M30) For Retaining Wall 3+507.5 3+510 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan
158 29-Jan-25 Highway 313 70297 Checking of Raft Reinforcement For Retaining Wall 3+600 3+602.5 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan
159 29-Jan-25 Highway 312 70298 Checking of Raft Concreting(M30) For Retaining Wall 3+600 3+602.5 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan
160 29-Jan-25 Highway 313 70299 Checking of Raft Reinforcement For Retaining Wall 4+000 4+025 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan
161 29-Jan-25 Highway 312 70300 Checking of Raft Concreting(M30) For Retaining Wall 4+000 4+025 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan
162 29-Jan-25 Highway 313 70301 Checking of Raft Reinforcement For Retaining Wall 5+212.5 5+215 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan
163 29-Jan-25 Highway 312 70302 Checking of Raft Concreting(M30) For Retaining Wall 5+212.5 5+215 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan
164 29-Jan-25 Highway 312 70303 Checking of Raft Concreting(M30) For Retaining Wall 5+876.2 5+877.5 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan
165 29-Jan-25 Highway 313 70304 Checking of Raft Reinforcement For Retaining Wall 6+123.5 6+124 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan
166 29-Jan-25 Highway 312 70305 Checking of Raft Concreting(M30) For Retaining Wall 6+123.5 6+124 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan
167 29-Jan-25 Highway 312 70306 Checking of Raft Concreting(M30) For Retaining Wall 3+462.95 3+463.32 LHS 30-Jan-25 10:00 AM Mr. Rajashekharan
168 29-Jan-25 Highway 313 70307 Checking of Wall Reinforcement For Retaining Wall 16+340 16+360 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan
169 29-Jan-25 Highway 312 70308 Checking of Wall Concreting(M30) For Retaining Wall 16+340 16+360 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan
170 29-Jan-25 Highway 301 70309 Checking Of Excavation For Return Wall - LHS Thatchur Row 3+218 LHS 30-Jan-25 10:00 AM Mr. Rajashekharan
171 29-Jan-25 Highway 301 70310 Checking Of Excavation For Return Wall - RHS Ennore Inner 3+968 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan
Checking Of FDD For Subgrade Soil 1st layer For Return Wall Ground
172 29-Jan-25 Highway 207 70311 3+218 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan
Improvement -MCW(RHS) Ennore Inner
Checking Of FDD For Subgrade Soil 1st layer For Return Wall Ground
173 29-Jan-25 Highway 207 70312 3+218 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan
Improvement -MCW(RHS) Thatchur Inner
Checking Of FDD For Subgrade Soil 2nd layer For Return Wall Ground
174 29-Jan-25 Highway 207 70313 3+218 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan
Improvement -MCW(RHS) Ennore Inner
Checking Of FDD For Subgrade Soil 2nd layer For Return Wall Ground
175 29-Jan-25 Highway 207 70314 3+218 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan
Improvement -MCW(RHS) Thatchur Inner
Checking Of FDD For Subgrade Soil 2nd layer For Return Wall Ground
176 29-Jan-25 Highway 207 70315 3+468 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan
Improvement -RHS ROW Thatchur
Project Name Construction of Chennai Peripheral Ring Road Package-I (North Port Access Road) (NPAR) Connecting Ennore Port with Thatchur on AH-45 - Package-I (Civil Works)
Checking Of FDD For Subgrade Soil 2nd layer For Return Wall Ground
178 29-Jan-25 Highway 207 70317 5+630 LHS 30-Jan-25 10:00 AM Mr. Rajashekharan
Improvement -LHS ROW Ennore
179 29-Jan-25 Highway 302 70318 Checking of PCC For Return Wall (Ennore) - MCW(RHS) 3+218 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan
180 29-Jan-25 Highway 302 70319 Checking of PCC For Return Wall (Thatchur) - MCW(RHS) 3+218 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan
181 29-Jan-25 Highway 302 70320 Checking of PCC For Return Wall (Thatchur Inner) - SR(RHS) 3+718 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan
182 29-Jan-25 Highway 302 70321 Checking of PCC For Return Wall - RHS Ennore Row 6+133 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan
183 29-Jan-25 Highway 302 70322 Checking of PCC For Return Wall - RHS Thatchur Row 9+035 LHS 30-Jan-25 10:00 AM Mr. Rajashekharan
184 29-Jan-25 Highway 308 70323 Checking of Raft Reinforcement for Return Wall - LHS Thatchur Row 3+218 LHS 30-Jan-25 10:00 AM Mr. Rajashekharan
185 29-Jan-25 Highway 303 70324 Checking of Raft Concreting(M30) for Return Wall - LHS Thatchur Row 3+218 LHS 30-Jan-25 10:00 AM Mr. Rajashekharan