The document outlines the Request for Information (RFI) related to the construction of the Chennai Peripheral Ring Road Package-I, detailing various inspections for retaining walls and embankments conducted on January 29, 2025. It includes specific chainages, inspection dates, and descriptions of the work being checked, all overseen by Mr. Ramesh. The project is managed by the Tamil Nadu Road Development Company Ltd. with supervision from NK-NKI-STUP-IBI-Aarvee JV and construction by TPL - IAV VOZ CPRR JV.

Uploaded by

ranjitha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views9 pages

Screenshot 2025-01-30 at 2.41.25 PM

The document outlines the Request for Information (RFI) related to the construction of the Chennai Peripheral Ring Road Package-I, detailing various inspections for retaining walls and embankments conducted on January 29, 2025. It includes specific chainages, inspection dates, and descriptions of the work being checked, all overseen by Mr. Ramesh. The project is managed by the Tamil Nadu Road Development Company Ltd. with supervision from NK-NKI-STUP-IBI-Aarvee JV and construction by TPL - IAV VOZ CPRR JV.

Uploaded by

ranjitha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

RFI Summary

Project Name Construction of Chennai Peripheral Ring Road Package-I (North Port Access Road) (NPAR) Connecting Ennore Port with Thatchur on AH-45 - Package-I (Civil Works)

Employer Tamil Nadu Road Development Company Ltd. (TNRDC)


Supervision Consultant NK-NKI-STUP-IBI-Aarvee JV
Contractor TPL - IAV VOZ CPRR JV

Chainage Status Approved Details


Length Inspection
SI No Date Dept Bill No Rfi No Description Side Inspection Date RFI Section In charge (Approved Signature Remarks
(m) Time
From To /Rejected ) Approved From To Length
Date

1 29-Jan-25 Highway 301 70140 Checking Of Excavation For Retaining Wall - SR(LHS) 11+775 11+780 LHS 30-Jan-25 10:00 AM Mr.Ramesh

2 29-Jan-25 Highway 311 70141 Checking Of PCC For Retaining Wall - SR(LHS) 11+775 11+780 LHS 30-Jan-25 12:00 PM Mr.Ramesh

Checking Of Excavation For Return Wall (A2 Side) - SR(RHS) Thatchur Row
3 29-Jan-25 Highway 301 70142 11+770 RHS 30-Jan-25 10:00 AM Mr.Ramesh
End

4 29-Jan-25 Highway 302 70143 Checking Of PCC For Return Wall (A2 Side) - SR(RHS) Thatchur Row End 11+770 RHS 30-Jan-25 2:00 PM Mr.Ramesh

5 29-Jan-25 Highway 301 70144 Checking Of Excavation For Return Wall (A1 Side) - SR(RHS) Ennore Row End 11+770 RHS 30-Jan-25 10:00 AM Mr.Ramesh

6 29-Jan-25 Highway 302 70145 Checking Of PCC For Return Wall (A1 Side) - SR(RHS) Ennore Row End 11+770 RHS 30-Jan-25 2:00 PM Mr.Ramesh

7 29-Jan-25 Highway 313 70146 Checking of Wall Reinforcement For Retaining Wall - SR(RHS) 13+860 13+880 LHS 30-Jan-25 10:00 AM Mr.Ramesh

8 29-Jan-25 Highway 312 70147 Checking of Wall Concreting(M30) For Retaining Wall - SR(RHS) 13+860 13+880 LHS 30-Jan-25 2:00 PM Mr.Ramesh

9 29-Jan-25 Highway 313 70148 Checking of Wall Reinforcement For Retaining Wall - SR(RHS) 13+980 14+000 LHS 30-Jan-25 10:00 AM Mr.Ramesh

10 29-Jan-25 Highway 312 70149 Checking of Wall Concreting(M30) For Retaining Wall - SR(RHS) 13+980 14+000 LHS 30-Jan-25 2:00 PM Mr.Ramesh

11 29-Jan-25 Highway 313 70150 Checking of Wall Reinforcement For Retaining Wall - SR(RHS) 13+850 13+860 LHS 30-Jan-25 10:00 AM Mr.Ramesh

12 29-Jan-25 Highway 312 70151 Checking of Wall Concreting(M30) For Retaining Wall - SR(RHS) 13+850 13+860 LHS 30-Jan-25 2:00 PM Mr.Ramesh

13 29-Jan-25 Highway 313 70152 Checking of Raft Reinforcement For Retaining Wall - SR(RHS) 14+080 14+100 RHS 30-Jan-25 10:00 AM Mr.Ramesh

14 29-Jan-25 Highway 312 70153 Checking of Raft Concreting(M30) For Retaining Wall - SR(RHS) 14+080 14+100 RHS 30-Jan-25 2:00 PM Mr.Ramesh

15 29-Jan-25 Highway 313 70154 Checking of Raft Reinforcement For Retaining Wall - SR(RHS) 15+460 15+480 RHS 30-Jan-25 10:00 AM Mr.Ramesh

16 29-Jan-25 Highway 312 70155 Checking of Raft Concreting(M30) For Retaining Wall - SR(RHS) 15+460 15+480 RHS 30-Jan-25 2:00 PM Mr.Ramesh

17 29-Jan-25 Highway 313 70156 Checking of Raft Reinforcement For Retaining Wall - SR(RHS) 15+480 15+485.6 RHS 30-Jan-25 10:00 AM Mr.Ramesh

18 29-Jan-25 Highway 312 70157 Checking of Raft Concreting(M30) For Retaining Wall - SR(RHS) 15+480 15+485.6 RHS 30-Jan-25 2:00 PM Mr.Ramesh

19 29-Jan-25 Highway 313 70158 Checking of Raft Reinforcement For Retaining Wall - SR(RHS) 15+485.6 RHS 30-Jan-25 10:00 AM Mr.Ramesh

20 29-Jan-25 Highway 312 70159 Checking of Raft Concreting(M30) For Retaining Wall - SR(RHS) 15+485.6 RHS 30-Jan-25 2:00 PM Mr.Ramesh

21 29-Jan-25 Highway 313 70160 Checking of Raft Reinforcement For Retaining Wall - SR(RHS) 15+485.6 15+500 RHS 30-Jan-25 10:00 AM Mr.Ramesh

22 29-Jan-25 Highway 312 70161 Checking of Raft Concreting(M30) For Retaining Wall - SR(RHS) 15+485.6 15+500 RHS 30-Jan-25 2:00 PM Mr.Ramesh
Project Name Construction of Chennai Peripheral Ring Road Package-I (North Port Access Road) (NPAR) Connecting Ennore Port with Thatchur on AH-45 - Package-I (Civil Works)

Employer Tamil Nadu Road Development Company Ltd. (TNRDC)


Supervision Consultant NK-NKI-STUP-IBI-Aarvee JV
Contractor TPL - IAV VOZ CPRR JV

Chainage Status Approved Details


Length Inspection
SI No Date Dept Bill No Rfi No Description Side Inspection Date RFI Section In charge (Approved Signature Remarks
(m) Time
From To /Rejected ) Approved From To Length
Date

23 29-Jan-25 Highway 313 70162 Checking of Wall Reinforcement For Retaining Wall - SR(RHS) 15+260 15+280 RHS 30-Jan-25 10:00 AM Mr.Ramesh

24 29-Jan-25 Highway 312 70163 Checking of Wall Concreting(M30) For Retaining Wall - SR(RHS) 15+260 15+280 RHS 30-Jan-25 2:00 PM Mr.Ramesh

Checkig of RCC Parapet Wall Reinforcement For Box Culvert - MCW(RHS)


25 29-Jan-25 Highway 308 70164 16+000 RHS 30-Jan-25 10:30 AM Mr.Ramesh
Inner End

Checking of RCC Parapet Wall Concreting(M30) SCC For Box Culvert -


26 29-Jan-25 Highway 303 70165 16+000 RHS 30-Jan-25 2:30 PM Mr.Ramesh
MCW(RHS) Inner End

27 29-Jan-25 Highway 301 70166 Checking Of Excavation For Retaining Wall - SR(LHS) 17+540 17+710 LHS 30-Jan-25 10:00 AM Mr.Ramesh

28 29-Jan-25 Highway 311 70167 Checking Of PCC For Retaining Wall - SR(LHS) 17+540 17+710 LHS 30-Jan-25 12:00 PM Mr.Ramesh

Checking Of Excavation For Return Wall (A2 Side) - SR(RHS) Thatchur Row
29 29-Jan-25 Highway 301 70168 18+480 RHS 30-Jan-25 10:00 AM Mr.Ramesh
End

30 29-Jan-25 Highway 302 70169 Checking Of PCC For Return Wall (A2 Side) - SR(RHS) Thatchur Inner End 18+480 RHS 30-Jan-25 2:00 PM Mr.Ramesh

31 29-Jan-25 Highway 301 70170 Checking Of Excavation For Return Wall (A1 Side) - SR(RHS) Ennore Row End 18+480 RHS 30-Jan-25 10:00 AM Mr.Ramesh

32 29-Jan-25 Highway 302 70171 Checking Of PCC For Return Wall (A1 Side) - SR(RHS) Ennore Row End 18+480 RHS 30-Jan-25 2:00 PM Mr.Ramesh

Checking Of Excavation For Return Wall (A2 Side) - SR(LHS) Thatchur Row
33 29-Jan-25 Highway 301 70172 18+480 LHS 30-Jan-25 10:00 AM Mr.Ramesh
End

34 29-Jan-25 Highway 302 70173 Checking Of PCC For Return Wall (A2 Side) - SR(LHS) Thatchur Inner End 18+480 LHS 30-Jan-25 2:00 PM Mr.Ramesh

35 29-Jan-25 Highway 301 70174 Checking Of Excavation For Return Wall (A1 Side) - SR(LHS) Ennore Row End 18+480 LHS 30-Jan-25 10:00 AM Mr.Ramesh

36 29-Jan-25 Highway 302 70175 Checking Of PCC For Return Wall (A1 Side) - SR(LHS) Ennore Row End 18+480 LHS 30-Jan-25 2:00 PM Mr.Ramesh

37 29-Jan-25 Highway 731 70176 Checking Of RE Panel Erection 6th Layer with Geostrip Locking - MCW(RHS) 11+880 12+000 RHS 30-Jan-25 2:30 PM Mr.Ramesh

38 29-Jan-25 Highway 731 70177 Checking Of RE Panel Erection 6th Layer with Geostrip Locking - MCW(LHS) 11+880 12+000 LHS 30-Jan-25 2:30 PM Mr.Ramesh

Checking of FDD Embankment 10th layer - Borrow Soil (Retained zone Above
39 29-Jan-25 Highway 205 70178 12+170 12+229 RHS 30-Jan-25 3:30 PM Mr. Ramesh
Ground Level) - MCW(RHS)

Cheking of FDD Embankment 1st Layer for Diversion Road (A1 Side) - Borrow
40 29-Jan-25 Highway 205 70179 12+304 30-Jan-25 10:00 AM Mr.Ramesh
Soil

Checking of FDD Embankment 12th layer - Pond Ash (Retained zone Above
41 29-Jan-25 Highway 206 70180 13+931.5 14+017 RHS 30-Jan-25 4:30 PM Mr. Ramesh
Ground Level)

Checking of FDD Embankment 2nd layer - Pond Ash (Retained zone Above
42 29-Jan-25 Highway 206 70181 13+931.5 14+020 LHS 30-Jan-25 4:30 PM Mr. Ramesh
Ground Level)

Checking of FDD Embankment 14th layer - Pond Ash (Retained zone Above
43 29-Jan-25 Highway 206 70182 14+017 14+110 RHS 30-Jan-25 4:30 PM Mr. Ramesh
Ground Level)

Checking of FDD Embankment 14th layer - Pond Ash (Retained zone Above
44 29-Jan-25 Highway 206 70183 14+020 14+110 LHS 30-Jan-25 4:30 PM Mr. Ramesh
Ground Level)
Project Name Construction of Chennai Peripheral Ring Road Package-I (North Port Access Road) (NPAR) Connecting Ennore Port with Thatchur on AH-45 - Package-I (Civil Works)

Employer Tamil Nadu Road Development Company Ltd. (TNRDC)


Supervision Consultant NK-NKI-STUP-IBI-Aarvee JV
Contractor TPL - IAV VOZ CPRR JV

Chainage Status Approved Details


Length Inspection
SI No Date Dept Bill No Rfi No Description Side Inspection Date RFI Section In charge (Approved Signature Remarks
(m) Time
From To /Rejected ) Approved From To Length
Date
Checking of FDD Embankment 2nd layer - Pond Ash (Retained zone Above
45 29-Jan-25 Highway 206 70184 14+352 14+481 LHS 30-Jan-25 4:30 PM Mr. Ramesh
Ground Level)

RHS +Truck
46 29-Jan-25 Highway 205 70185 Checking of FDD and Level for Embankment Top Layer - Borrow Soil 18+600 18+700 30-Jan-25 4:00 PM Mr.Ramesh
Lay Bay

Checking of FDD Embankment 13th layer - Pond Ash (Reinforced zone Above
47 29-Jan-25 Highway 206 70186 11+423 11+450 RHS 30-Jan-25 11:00 AM Mr. Ramesh
Ground Level) - MCW(RHS)

48 29-Jan-25 Highway 737 70187 Checking of Filter Media 13th Layer for RE Wall - MCW(RHS) 11+423 11+450 RHS 30-Jan-25 11:00 AM Mr.Ramesh

49 29-Jan-25 Highway 737 70188 Checking of Filter Media 13th Layer for RE Wall Closing Wall 6A & 6B 11+355 30-Jan-25 11:00 AM Mr.Ramesh

50 29-Jan-25 Highway 309(ii) 70189 Checking of Raft Reinforcement For Drain (Type-2) - SR(RHS) 15+370 15+420 RHS 30-Jan-25 11:30 AM Mr. Ramesh

51 29-Jan-25 Highway 309(ii) 70190 Checking of Raft Concreting For Drain (Type-2) - SR(RHS) 15+370 15+420 RHS 30-Jan-25 11:30 AM Mr. Ramesh

52 29-Jan-25 Highway 309(iii) 70191 Checking of Raft Reinforcement For Drain (Type-3C) - SR(RHS) 15+270 15+290 RHS 30-Jan-25 11:30 AM Mr. Ramesh

53 29-Jan-25 Highway 309(iii) 70192 Checking of Raft Concreting For Drain (Type-3C) - SR(RHS) 15+270 15+290 RHS 30-Jan-25 11:30 AM Mr. Ramesh

54 29-Jan-25 Highway 309(ii) 70193 Checking of PCC for Drain (Type-2) - MCW(RHS) 10+540 10+590 RHS 30-Jan-25 10:30 AM Mr. Ramesh

55 29-Jan-25 Highway 309(iii) 70194 Checking of Raft Reinforcement For Drain (Type-3B) - MCW(RHS) 10+730 10+750 RHS 30-Jan-25 10:30 AM Mr. Ramesh

56 29-Jan-25 Highway 309(iii) 70195 Checking of Raft Concreting For Drain (Type-3B) - MCW(RHS) 10+730 10+750 RHS 30-Jan-25 10:30 AM Mr. Ramesh

57 29-Jan-25 Highway 309(ii) 70196 Checking of PCC for Drain (Type-2A & 3C) - SR(RHS) 15+150 15+240 RHS 30-Jan-25 10:30 AM Mr. Ramesh

58 29-Jan-25 Highway 309(i) 70197 Checking of Slab Reinforcement For Drain - MCW(RHS) 18+435 18+460 RHS 30-Jan-25 10:30 AM Mr. Ramesh

59 29-Jan-25 Highway 309(i) 70198 Checking of Slab Concreting For Drain - MCW(RHS) 18+435 18+460 RHS 30-Jan-25 10:30 AM Mr. Ramesh

60 29-Jan-25 Highway 308 70199 Checking of Raft Reinforcement for Return Wall (A1) - RHS Row 0+260 RHS 30-Jan-25 10:30 AM Mr. Muthu Kumar

61 29-Jan-25 Highway 303 70200 Checking of Raft Concreting(M30) for Return Wall (A1) - RHS Row 0+260 RHS 30-Jan-25 2:30 PM Mr. Muthu Kumar

62 29-Jan-25 Highway 313 70201 Checking of RCC Wall Reinforcement For Retaining Wall - SR(LHS) L 0+840 L 0+860 LHS 30-Jan-25 10:30 AM Mr. Muthu Kumar

63 29-Jan-25 Highway 312 70202 Checking of RCC Wall Concreting(M30) SCC For Retaining Wall - SR(LHS) L 0+840 L 0+860 LHS 30-Jan-25 2:30 PM Mr. Muthu Kumar

64 29-Jan-25 Highway 313 70203 Checking of RCC Wall Reinforcement For Retaining Wall (0 to 20) - SR(RHS) L 0+765.67 L RHS 30-Jan-25 10:30 AM Mr. Muthu Kumar

Checking of RCC Wall Concreting(M30) SCC For Retaining Wall (0 to 20) -


65 29-Jan-25 Highway 312 70204 L 0+765.67 L RHS 30-Jan-25 2:30 PM Mr. Muthu Kumar
SR(RHS)

Checking of RCC Wall Reinforcement for Return Wall (1st Lift) (A2 ) - RHS
66 29-Jan-25 Highway 308 70205 0+260 RHS 30-Jan-25 10:30 AM Mr. Muthu Kumar
Row
Project Name Construction of Chennai Peripheral Ring Road Package-I (North Port Access Road) (NPAR) Connecting Ennore Port with Thatchur on AH-45 - Package-I (Civil Works)

Employer Tamil Nadu Road Development Company Ltd. (TNRDC)


Supervision Consultant NK-NKI-STUP-IBI-Aarvee JV
Contractor TPL - IAV VOZ CPRR JV

Chainage Status Approved Details


Length Inspection
SI No Date Dept Bill No Rfi No Description Side Inspection Date RFI Section In charge (Approved Signature Remarks
(m) Time
From To /Rejected ) Approved From To Length
Date
Checking of RCC Wall Concreting(M30) SCC for Return Wall (1st Lift) (A2 ) -
67 29-Jan-25 Highway 303 70206 0+260 RHS 30-Jan-25 2:30 PM Mr. Muthu Kumar
RHS Row

68 29-Jan-25 Highway 313 70207 Checking of RCC Wall Reinforcement For Retaining Wall (Extended) (A1) L1+178 RHS 30-Jan-25 10:30 AM Mr. Muthu Kumar

Checking of RCC Wall Concreting(M30) SCC For Retaining Wall (Extended)


69 29-Jan-25 Highway 312 70208 L1+178 RHS 30-Jan-25 2:30 PM Mr. Muthu Kumar
(A1)

Cheking of FDD Embankment 1st Layer - Pond Ash (Reinforced Zone Below
70 29-Jan-25 Highway 206 70209 0+580 0+610 LHS 30-Jan-25 9:30 AM Mr. Sandip
Ground Level) (Ennore Side) (Wall-2)

Cheking of FDD Embankment 2nd Layer - Pond Ash (Reinforced Zone Below
71 29-Jan-25 Highway 206 70210 0+580 0+610 LHS 30-Jan-25 12:30 PM Mr. Sandip
Ground Level) (Ennore Side) (Wall-2)

Cheking of FDD Embankment 3rd Layer - Pond Ash (Reinforced Zone Below
72 29-Jan-25 Highway 206 70211 0+580 0+610 LHS 30-Jan-25 2:30 PM Mr. Sandip
Ground Level) (Ennore Side) (Wall-2)

73 29-Jan-25 Highway 541 70212 Checking of Filter Media 6th Layer for RE Wall (Wall-4) K 0+060 K 0+200 LHS 30-Jan-25 11:30 AM Mr. Sandip

Cheking of FDD Embankment 4th Layer - Pond Ash (Reinforced Zone Above
74 29-Jan-25 Highway 206 70213 K 0+060 K 0+200 LHS 30-Jan-25 3:30 PM Mr. Sandip
Ground Level) (Wall-4)

Cheking of FDD Embankment 4th Layer - Pond Ash (Retained Zone Above
75 29-Jan-25 Highway 206 70214 K 0+060 K 0+200 LHS 30-Jan-25 3:30 PM Mr. Sandip
Ground Level) (Wall-4)

Cheking of FDD Embankment 6th Layer - Pond Ash (Reinforced ZoneAbove


76 29-Jan-25 Highway 206 70215 0+350 0+560 LHS 30-Jan-25 12:30 AM Mr. Sandip
Ground Level) (Ennore Side) (Wall-2)

Cheking of FDD Embankment 6th Layer - Pond Ash (Retained ZoneAbove


77 29-Jan-25 Highway 206 70216 0+350 0+560 LHS 30-Jan-25 2:30 PM Mr. Sandip
Ground Level) (Ennore Side) (Wall-2)

78 29-Jan-25 Highway 541 70217 Checking of Filter Media 6th Layer for RE Wall (Wall-2) 0+350 0+560 LHS 30-Jan-25 3:00 PM Mr. Sandip

Cheking of FDD Embankment 4th Layer - Pond Ash (Reinforced Zone Below
79 29-Jan-25 Highway 206 70218 0+000 0+020 LHS 30-Jan-25 9:30 AM Mr. Sandip
Ground Level) (Wall-4A)

Cheking of FDD Embankment 4th Layer - Pond Ash (Reinforced Zone Below
80 29-Jan-25 Highway 206 70219 0+000 0+028 LHS 30-Jan-25 9:30 AM Mr. Sandip
Ground Level) (Wall-2A)

Cheking of FDD Embankment 4th Layer - Pond Ash (Reinforced Zone Below
81 29-Jan-25 Highway 206 70220 0+000 0+045 BHS 30-Jan-25 10:30 AM Mr. Sandip
Ground Level) (Wall-5)

Cheking of FDD Embankment 5th Layer - Pond Ash (Reinforced Zone Below
82 29-Jan-25 Highway 206 70221 0+000 0+020 LHS 30-Jan-25 2:30 PM Mr. Sandip
Ground Level) (Wall-4A)

Cheking of FDD Embankment 5th Layer - Pond Ash (Reinforced Zone Below
83 29-Jan-25 Highway 206 70222 0+000 0+028 LHS 30-Jan-25 2:30 PM Mr. Sandip
Ground Level) (Wall-2A)

Cheking of FDD Embankment 5th Layer - Pond Ash (Reinforced Zone Below
84 29-Jan-25 Highway 206 70223 0+000 0+045 BHS 30-Jan-25 2:30 PM Mr. Sandip
Ground Level) (Wall-5)

85 29-Jan-25 Highway 401 70224 Cheking of FDD GSB Top Layer for Diversion Road at L 1+678 MNB 0+000 0+060 LHS 30-Jan-25 10:00 AM Mr. Prateek

86 29-Jan-25 Highway 205 70225 Checking of FDD Embankment 3rd layer - Borrow Soil - SR(RHS) 3+470 3+716 RHS 30-Jan-25 11:30 AM Mr. Prateek

87 29-Jan-25 Highway 205 70226 Checking of FDD Embankment 1st layer - Borrow Soil - SR(RHS) 5+222 5+418 RHS 30-Jan-25 10:30 AM Mr. Prateek

88 29-Jan-25 Highway 205 70227 Checking of FDD Embankment 2nd layer - Borrow Soil - SR(RHS) 5+422 5+628 RHS 30-Jan-25 12:30 PM Mr. Prateek
Project Name Construction of Chennai Peripheral Ring Road Package-I (North Port Access Road) (NPAR) Connecting Ennore Port with Thatchur on AH-45 - Package-I (Civil Works)

Employer Tamil Nadu Road Development Company Ltd. (TNRDC)


Supervision Consultant NK-NKI-STUP-IBI-Aarvee JV
Contractor TPL - IAV VOZ CPRR JV

Chainage Status Approved Details


Length Inspection
SI No Date Dept Bill No Rfi No Description Side Inspection Date RFI Section In charge (Approved Signature Remarks
(m) Time
From To /Rejected ) Approved From To Length
Date

89 29-Jan-25 Highway 205 70228 Checking of FDD Embankment 2nd layer - Borrow Soil - SR(RHS) 5+632 5+883 RHS 30-Jan-25 2:30 PM Mr. Prateek

90 29-Jan-25 Highway 205 70229 Checking of FDD Embankment 2nd layer - Borrow Soil - SR(RHS) 5+887 6+131 RHS 30-Jan-25 4:30 PM Mr. Prateek

91 29-Jan-25 Structure Variation 70230 Checking of Slab Reinforcement at SVUP - MCW(BHS) 14+287 BHS 30-Jan-25 11:00 AM Mr. Ramesh

Checking of Survey, Shuttering and Concreting (M30) for Slab at SVUP -


92 29-Jan-25 Structure Variation 70231 14+287 BHS 30-Jan-25 2:00 PM Mr. Ramesh
MCW(BHS)

Checking of Pile Steel Liner Fabrication, Setting Out And Pitching For Pile No -
93 29-Jan-25 Structure 804 70232 L 2+811 LHS 30-Jan-25 12:00 AM Mr. Ajay Kumar
LP31-3 ROB

94 29-Jan-25 Structure 813(i) 70233 Reinforcement Cage Fabrication and Lowering For Pile No - LP31-3 ROB L 2+811 LHS 30-Jan-25 6:00 AM Mr. Ajay Kumar

Checking of Bored Cast-In-Situ Pile Construction RCC M35 Concreting And


95 29-Jan-25 Structure 803 70234 L 2+811 LHS 30-Jan-25 8:00 AM Mr. Ajay Kumar
Boring For Pile No - LP31-3 ROB

Checking of Pile Steel Liner Fabrication, Setting Out And Pitching For Pile No -
96 29-Jan-25 Structure 804 70235 L 2+811 RHS 30-Jan-25 1:00 AM Mr. Ajay Kumar
RP31-3 ROB

97 29-Jan-25 Structure 813(i) 70236 Reinforcement Cage Fabrication and Lowering For Pile No - RP31-3 ROB L 2+811 RHS 30-Jan-25 7:00 AM Mr. Ajay Kumar

Checking of Bored Cast-In-Situ Pile Construction RCC M35 Concreting And


98 29-Jan-25 Structure 803 70237 L 2+811 RHS 30-Jan-25 9:00 AM Mr. Ajay Kumar
Boring For Pile No - RP31-3 ROB

99 29-Jan-25 Structure 513(ii) 70238 Checking Of Reinforcement For Pier Cap - RA1 MJB 1+627 RHS 30-Jan-25 11:00 AM Mr. Satya

100 29-Jan-25 Structure 509 70239 Checking Of Survey, Shuttering And Concreting For Pier Cap - RA1 MJB 1+627 RHS 30-Jan-25 11:30 AM Mr. Satya

101 29-Jan-25 Structure 513(ii) 70240 Checking Of Reinforcement For Pier Cap - LP12 MJB 1+627 LHS 30-Jan-25 4:00 PM Mr. Aanand Maurya

102 29-Jan-25 Structure 509 70241 Checking Of Survey, Shuttering And Concreting For Pier Cap - LP12 MJB 1+627 LHS 30-Jan-25 4:30 PM Mr. Aanand Maurya

Checking of Reinforcement and Profile for Box Girder Segment - LP11-LP12/S5-


103 29-Jan-25 Structure 70242 1+627(3+300 Casting Yard) LHS 30-Jan-25 11:00 AM Mr. Avinash Sahukar
2 - MJB

Checking of Survey , Shuttering and Concreting for Box Girder Segment - LP11-
104 29-Jan-25 Structure 70243 1+627(3+300 Casting Yard) LHS 30-Jan-25 12:00 PM Mr. Avinash Sahukar
LP12/S5-2 - MJB

Checking of Reinforcement and Profile for Box Girder Segment - LP7-LP8/S4-1 -


105 29-Jan-25 Structure 70244 1+627(3+300 Casting Yard) LHS 30-Jan-25 2:00 PM Mr. Avinash Sahukar
MJB

Checking of Survey, Shuttering and Concreting for Box Girder Segment - LP7-
106 29-Jan-25 Structure 70245 1+627(3+300 Casting Yard) LHS 30-Jan-25 3:00 PM Mr. Avinash Sahukar
LP8/S4-1 - MJB

Checking of Reinforcement and Profile for Box Girder Segment - LP10-LP11/S5-


107 29-Jan-25 Structure 70246 1+627(3+300 Casting Yard) LHS 30-Jan-25 4:00 PM Mr. Avinash Sahukar
2 - MJB

Checking of Survey, Shuttering and Concreting for Box Girder Segment - LP10-
108 29-Jan-25 Structure 70247 1+627(3+300 Casting Yard) LHS 30-Jan-25 5:00 PM Mr. Avinash Sahukar
LP11/S5-2 - MJB

109 29-Jan-25 Structure 813(ii) 70248 Checking Of Reinforcement For Pier Shaft - LP21 ROB L 2+811 LHS 30-Jan-25 9:00 AM Mr.Vinod Kumar

110 29-Jan-25 Structure 809 70249 Checking Of Survey, Shuttering And Concreting For Pier Shaft - LP21 ROB L 2+811 LHS 30-Jan-25 10:00 AM Mr.Vinod Kumar
Project Name Construction of Chennai Peripheral Ring Road Package-I (North Port Access Road) (NPAR) Connecting Ennore Port with Thatchur on AH-45 - Package-I (Civil Works)

Employer Tamil Nadu Road Development Company Ltd. (TNRDC)


Supervision Consultant NK-NKI-STUP-IBI-Aarvee JV
Contractor TPL - IAV VOZ CPRR JV

Chainage Status Approved Details


Length Inspection
SI No Date Dept Bill No Rfi No Description Side Inspection Date RFI Section In charge (Approved Signature Remarks
(m) Time
From To /Rejected ) Approved From To Length
Date

111 29-Jan-25 Structure 813(ii) 70250 Checking Of Reinforcement For Pier Shaft - DP4 ROB L 2+811 LHS 30-Jan-25 9:00 AM Mr.Vinod Kumar

112 29-Jan-25 Structure 809 70251 Checking Of Survey, Shuttering And Concreting For Pier Shaft - DP4 ROB L 2+811 LHS 30-Jan-25 10:00 AM Mr.Vinod Kumar

113 29-Jan-25 Structure 801 70252 Checking Of Excavation For Pile Cap Upto PCC Bottom - LP28 ROB L 2+811 LHS 30-Jan-25 4:00 PM Mr.Vinod Kumar

114 29-Jan-25 Structure 802 70253 Checking Of Survey and PCC (M15) Laying For Pile Cap - LP28 ROB L 2+811 LHS 30-Jan-25 5:00 PM Mr.Vinod Kumar

115 29-Jan-25 Structure 813(i) 70254 Checking Of Reinforcement For Pile Cap - LP17 ROB L 2+811 LHS 30-Jan-25 4:00 PM Mr.Vinod Kumar

116 29-Jan-25 Structure 808 70255 Checking Of Survey, Shuttering And Concreting For Pile Cap - LP17 ROB L 2+811 LHS 30-Jan-25 5:00 PM Mr.Vinod Kumar

117 29-Jan-25 Structure 813(i) 70256 Checking Of Reinforcement For Pile Cap - LP15 ROB L 2+811 LHS 30-Jan-25 4:00 PM Mr.Vinod Kumar

118 29-Jan-25 Structure 808 70257 Checking Of Survey, Shuttering And Concreting For Pile Cap - LP15 ROB L 2+811 LHS 30-Jan-25 5:00 PM Mr.Vinod Kumar

Checking of Longitudinal Guided Bearing for LP2-LP3 Span POT/PTFE Bearing


119 29-Jan-25 Structure 725(iii) 70258 6+341 LHS 30-Jan-25 10:00 AM Mr. Mohan Babu
Fixing - 1 Nos

Checking of Transverse Guided Bearing for LP2-LP3 Span POT/PTFE Bearing


120 29-Jan-25 Structure 725(iii) 70259 6+341 LHS 30-Jan-25 10:00 AM Mr. Mohan Babu
Fixing - 1 Nos

121 29-Jan-25 Structure 725(ii) 70260 Checking of Free Bearing for LP2-LP3 Span POT/PTFE Bearing Fixing - 1 Nos 6+341 LHS 30-Jan-25 10:00 AM Mr. Mohan Babu

122 29-Jan-25 Structure 725(i) 70261 Checking of Fixed Bearing for LP2-LP3 Span POT/PTFE Bearing Fixing - 1 Nos 6+341 LHS 30-Jan-25 10:00 AM Mr. Mohan Babu

123 29-Jan-25 Structure Non BOQ 70262 Checking of Plate Load Test for Span - RP2-RA2 VUP 12+304 RHS 30-Jan-25 10:00 AM Mr. Abhishek

124 29-Jan-25 Structure 612(ii) 70263 Checking Of Reinforcement For Pier Cap - RSP2 MNB 18+165 RHS 30-Jan-25 2:00 PM Mr. Vikesh

125 29-Jan-25 Structure 609 70264 Checking Of Survey, Shuttering And Concreting For Pier Cap - RSP2 MNB 18+165 RHS 30-Jan-25 2:30 PM Mr. Vikesh

126 29-Jan-25 Structure 912(ii) 70265 Checking Of Reinforcement For Pier Shaft - LP6 IC 20+897 LHS 30-Jan-25 10:00 AM Mr. Amar Singh

127 29-Jan-25 Structure 909 70266 Checking Of Survey, Shuttering And Concreting For Pier Shaft - LP6 IC 20+897 LHS 30-Jan-25 11:00 AM Mr. Amar Singh

128 29-Jan-25 Survey Non BOQ 70267 Recording of OGL at Missing Link Road 3+680 3+900 BHS 30-Jan-25 10:00 AM Mr. Dillip Kumar

129 29-Jan-25 Survey Non BOQ 70268 Checking Of Retaining Wall Layout Coordinates 21+100 21+700 LHS 30-Jan-25 12:00 PM Mr. Dilip Kumar

130 29-Jan-25 Survey Non BOQ 70269 Checking Of Retaining Wall Layout Coordinates 21+100 21+700 RHS 30-Jan-25 2:00 PM Mr. Dilip Kumar

131 29-Jan-25 HSE Non BOQ 70270 Weekly Air Quality Monitoring for the Period (30.01.2025 to 31.01.2025) 3+200 30-Jan-25 10:00 AM Mr. S.K Inamur

132 29-Jan-25 Highway 401 70271 Checking of FDD For GSB 1st Layer for Retaining Wall Ground Improvement 9+027.5 9+029.7 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan
Project Name Construction of Chennai Peripheral Ring Road Package-I (North Port Access Road) (NPAR) Connecting Ennore Port with Thatchur on AH-45 - Package-I (Civil Works)

Employer Tamil Nadu Road Development Company Ltd. (TNRDC)


Supervision Consultant NK-NKI-STUP-IBI-Aarvee JV
Contractor TPL - IAV VOZ CPRR JV

Chainage Status Approved Details


Length Inspection
SI No Date Dept Bill No Rfi No Description Side Inspection Date RFI Section In charge (Approved Signature Remarks
(m) Time
From To /Rejected ) Approved From To Length
Date

133 29-Jan-25 Highway 401 70272 Checking of FDD For GSB 2nd Layer for Retaining Wall Ground Improvement 3+750 3+775 LHS 30-Jan-25 10:00 AM Mr. Rajashekharan

134 29-Jan-25 Highway 401 70273 Checking of FDD For GSB 2nd Layer for Retaining Wall Ground Improvement 9+027.5 9+029.7 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan

135 29-Jan-25 Highway 207 70274 Checking of Subgrade Soil 1st Layer for Retaining Wall 5+876.2 5+877.5 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan

136 29-Jan-25 Highway 207 70275 Checking of Subgrade Soil 1st Layer for Retaining Wall 9+027.5 9+029.7 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan

137 29-Jan-25 Highway 207 70276 Checking of Subgrade Soil 2nd Layer for Retaining Wall 5+876.2 5+877.5 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan

138 29-Jan-25 Highway 207 70277 Checking of Subgrade Soil 2nd Layer for Retaining Wall 9+027.5 9+029.7 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan

139 29-Jan-25 Highway 311 70278 Checking Of PCC For Retaining Wall 3+100 3+110 LHS 30-Jan-25 10:00 AM Mr. Rajashekharan

140 29-Jan-25 Highway 311 70279 Checking Of PCC For Retaining Wall 3+462.95 3+463.32 LHS 30-Jan-25 10:00 AM Mr. Rajashekharan

141 29-Jan-25 Highway 311 70280 Checking Of PCC For Retaining Wall 5+225 5+225.15 LHS 30-Jan-25 10:00 AM Mr. Rajashekharan

142 29-Jan-25 Highway 311 70281 Checking Of PCC For Retaining Wall 9+027.5 9+029.7 LHS 30-Jan-25 10:00 AM Mr. Rajashekharan

143 29-Jan-25 Highway 311 70282 Checking Of PCC For Retaining Wall 9+864 9+864.09 LHS 30-Jan-25 10:00 AM Mr. Rajashekharan

144 29-Jan-25 Highway 311 70283 Checking Of PCC For Retaining Wall 9+875.91 9+876 LHS 30-Jan-25 10:00 AM Mr. Rajashekharan

145 29-Jan-25 Highway 311 70284 Checking Of PCC For Retaining Wall 10+170 10+174 LHS 30-Jan-25 10:00 AM Mr. Rajashekharan

146 29-Jan-25 Highway 311 70285 Checking Of PCC For Retaining Wall 13+684 13+684.83 LHS 30-Jan-25 10:00 AM Mr. Rajashekharan

147 29-Jan-25 Highway 311 70286 Checking Of PCC For Retaining Wall 20+174.76 20+175 LHS 30-Jan-25 10:00 AM Mr. Rajashekharan

148 29-Jan-25 Highway 311 70287 Checking Of PCC For Retaining Wall 5+225.23 5+227.5 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan

149 29-Jan-25 Highway 311 70288 Checking Of PCC For Retaining Wall 5+892.5 5+893.7 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan

150 29-Jan-25 Highway 311 70289 Checking Of PCC For Retaining Wall 5+635.12 5+637.6 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan

151 29-Jan-25 Highway 311 70290 Checking Of PCC For Retaining Wall 6+142 6+142.5 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan

152 29-Jan-25 Highway 311 70291 Checking Of PCC For Retaining Wall 9+875.48 9+880 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan

153 29-Jan-25 Highway 311 70292 Checking Of PCC For Retaining Wall 15+583.4 15+5583.41 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan

154 29-Jan-25 Highway 311 70293 Checking Of PCC For Retaining Wall 15+804.8 15+815 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan
Project Name Construction of Chennai Peripheral Ring Road Package-I (North Port Access Road) (NPAR) Connecting Ennore Port with Thatchur on AH-45 - Package-I (Civil Works)

Employer Tamil Nadu Road Development Company Ltd. (TNRDC)


Supervision Consultant NK-NKI-STUP-IBI-Aarvee JV
Contractor TPL - IAV VOZ CPRR JV

Chainage Status Approved Details


Length Inspection
SI No Date Dept Bill No Rfi No Description Side Inspection Date RFI Section In charge (Approved Signature Remarks
(m) Time
From To /Rejected ) Approved From To Length
Date

155 29-Jan-25 Highway 311 70294 Checking Of PCC For Retaining Wall 20+250 20+270 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan

156 29-Jan-25 Highway 313 70295 Checking of Raft Reinforcement For Retaining Wall 3+507.5 3+510 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan

157 29-Jan-25 Highway 312 70296 Checking of Raft Concreting(M30) For Retaining Wall 3+507.5 3+510 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan

158 29-Jan-25 Highway 313 70297 Checking of Raft Reinforcement For Retaining Wall 3+600 3+602.5 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan

159 29-Jan-25 Highway 312 70298 Checking of Raft Concreting(M30) For Retaining Wall 3+600 3+602.5 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan

160 29-Jan-25 Highway 313 70299 Checking of Raft Reinforcement For Retaining Wall 4+000 4+025 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan

161 29-Jan-25 Highway 312 70300 Checking of Raft Concreting(M30) For Retaining Wall 4+000 4+025 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan

162 29-Jan-25 Highway 313 70301 Checking of Raft Reinforcement For Retaining Wall 5+212.5 5+215 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan

163 29-Jan-25 Highway 312 70302 Checking of Raft Concreting(M30) For Retaining Wall 5+212.5 5+215 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan

164 29-Jan-25 Highway 312 70303 Checking of Raft Concreting(M30) For Retaining Wall 5+876.2 5+877.5 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan

165 29-Jan-25 Highway 313 70304 Checking of Raft Reinforcement For Retaining Wall 6+123.5 6+124 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan

166 29-Jan-25 Highway 312 70305 Checking of Raft Concreting(M30) For Retaining Wall 6+123.5 6+124 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan

167 29-Jan-25 Highway 312 70306 Checking of Raft Concreting(M30) For Retaining Wall 3+462.95 3+463.32 LHS 30-Jan-25 10:00 AM Mr. Rajashekharan

168 29-Jan-25 Highway 313 70307 Checking of Wall Reinforcement For Retaining Wall 16+340 16+360 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan

169 29-Jan-25 Highway 312 70308 Checking of Wall Concreting(M30) For Retaining Wall 16+340 16+360 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan

170 29-Jan-25 Highway 301 70309 Checking Of Excavation For Return Wall - LHS Thatchur Row 3+218 LHS 30-Jan-25 10:00 AM Mr. Rajashekharan

171 29-Jan-25 Highway 301 70310 Checking Of Excavation For Return Wall - RHS Ennore Inner 3+968 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan

Checking Of FDD For Subgrade Soil 1st layer For Return Wall Ground
172 29-Jan-25 Highway 207 70311 3+218 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan
Improvement -MCW(RHS) Ennore Inner

Checking Of FDD For Subgrade Soil 1st layer For Return Wall Ground
173 29-Jan-25 Highway 207 70312 3+218 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan
Improvement -MCW(RHS) Thatchur Inner

Checking Of FDD For Subgrade Soil 2nd layer For Return Wall Ground
174 29-Jan-25 Highway 207 70313 3+218 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan
Improvement -MCW(RHS) Ennore Inner

Checking Of FDD For Subgrade Soil 2nd layer For Return Wall Ground
175 29-Jan-25 Highway 207 70314 3+218 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan
Improvement -MCW(RHS) Thatchur Inner

Checking Of FDD For Subgrade Soil 2nd layer For Return Wall Ground
176 29-Jan-25 Highway 207 70315 3+468 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan
Improvement -RHS ROW Thatchur
Project Name Construction of Chennai Peripheral Ring Road Package-I (North Port Access Road) (NPAR) Connecting Ennore Port with Thatchur on AH-45 - Package-I (Civil Works)

Employer Tamil Nadu Road Development Company Ltd. (TNRDC)


Supervision Consultant NK-NKI-STUP-IBI-Aarvee JV
Contractor TPL - IAV VOZ CPRR JV

Chainage Status Approved Details


Length Inspection
SI No Date Dept Bill No Rfi No Description Side Inspection Date RFI Section In charge (Approved Signature Remarks
(m) Time
From To /Rejected ) Approved From To Length
Date
Checking Of FDD For Subgrade Soil 2nd layer For Return Wall Ground
177 29-Jan-25 Highway 207 70316 3+718 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan
Improvement -SR(RHS) Inner Thatchur

Checking Of FDD For Subgrade Soil 2nd layer For Return Wall Ground
178 29-Jan-25 Highway 207 70317 5+630 LHS 30-Jan-25 10:00 AM Mr. Rajashekharan
Improvement -LHS ROW Ennore

179 29-Jan-25 Highway 302 70318 Checking of PCC For Return Wall (Ennore) - MCW(RHS) 3+218 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan

180 29-Jan-25 Highway 302 70319 Checking of PCC For Return Wall (Thatchur) - MCW(RHS) 3+218 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan

181 29-Jan-25 Highway 302 70320 Checking of PCC For Return Wall (Thatchur Inner) - SR(RHS) 3+718 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan

182 29-Jan-25 Highway 302 70321 Checking of PCC For Return Wall - RHS Ennore Row 6+133 RHS 30-Jan-25 10:00 AM Mr. Rajashekharan

183 29-Jan-25 Highway 302 70322 Checking of PCC For Return Wall - RHS Thatchur Row 9+035 LHS 30-Jan-25 10:00 AM Mr. Rajashekharan

184 29-Jan-25 Highway 308 70323 Checking of Raft Reinforcement for Return Wall - LHS Thatchur Row 3+218 LHS 30-Jan-25 10:00 AM Mr. Rajashekharan

185 29-Jan-25 Highway 303 70324 Checking of Raft Concreting(M30) for Return Wall - LHS Thatchur Row 3+218 LHS 30-Jan-25 10:00 AM Mr. Rajashekharan