Moriones School Improvement Plan
Moriones School Improvement Plan
SCHOOL
112857
Old Moriones, Ocampo,
Camarines Sur
ENHANCED
SCHOOL
IMPROVEMENT
PLAN
School Year 2019-2022
The governance for Basic Education Act of 2001 or RA 9155 has specified
the formulation of School Improvement Plan that reflects the interests and aspirations
of the community it serves. School Improvement Plan, therefore, becomes a shared
responsibility between the school and the community it serves.
The Enhanced School Improvement Plan (SIP) is the main vehicle through
which schools will proceed down the path to improvement. SIPs are carefully
structured to focus on key goals and strategies which will lead to greater student
learning and a more effective school organization.
The plan was crafted through the collaborative efforts made by the School
Planning Team spearheaded by Mrs. Virginia B. Lopez, ESP I, with its members:
Ronald Joan Valeriano-PTA President, Maria Corazon P. Carbonell-Punong
Barangay, Vince Ezekiel T. Felicitas- SPG Prsident, Leilani P. Carbonell –School
Guidance Councilor, Corazon T. Rapal-Master Teacher I, and Virgie I. Pellas, Faculty
Staff President.
The SIP is a developmental Plan which embodies the school and the
community’s vision of the future as well as the strategies and activities they want to
undertake to attain that vision and enable schools to negotiate for development
initiatives. It is a comprehensive overview of major priorities to which stakeholders
will be dedicated to at least three years. The plan describes areas which the school
will emphasize, and for which it will commit beyond maintenance of present strengths
towards an enhanced learning environment for students. The SIP, therefore, is a
document which embodies what a school wants to achieve and the manner with
which to achieve these. And lastly it is an integrating document that will incorporates
stakeholder’s requirements and potential contribution.
LIST OF ACRONYMS
Moriones Elementary School is located along the national highways, the school ID
112857, with a total land area of 20,000 square meter. Our school is one of the medium
sized school in Ocampo District. The nearest public elementary school are Hanawan
Elementary School and New Moriones Elementary School.
The school is headed by a principal I position and there are eleven (11) nationally
funded teachers which includes one (1) Master Teacher, one (1) Teacher III, two (2) Teacher
II and seven (7) Teacher I. One of them is a graduate of Master of Arts in Education (MAED)
and there are two who are still taking MAED. All of them continuously attending trainings
and seminars for their professional growth.
The Moriones Elementary School pupils’ performance in line with Promotion Rate is
evidently low of having 82.82%. This is because of the low results in literacy and numeracy
which are the Priority Improvement Areas (PIAs) to be given enough attention and solution.
The school head and teaching staff exerts their effort to use effective methods
and interventions to minimize if not totally eradicate the presence of non-readers and
non- numerates in every class in the lower grades likewise supplementary feeding by
grade level and by embracing the DepEd program School Based Feeding Program
(SBFP).
Enrolment list is decreasing from S/Y 2016-2017 the school have a total of
299 pupils enrolled, S/Y 2017-2018- 327 enrolment and S/Y 2018-2019 the school
have 283 enrolment.
104: Low
Learners participatio
Landscaping of Maintain a
actively n rate of
the school safe and
participate in parents/
premises conducive
their learning stakeholde
learning
environment rs of
environment
Moriones
E/S
104: Lack of
Unsafe fencing Construct
Learners financial
of school school fence
actively support
premises for the safety
participate in fron the
of the school
their learning parents
children
environment
I03:
Improvement of To provide
stakeholders and safe facilites/ The schools
No safe
active Materilas to do not have
facilities/materials
participation and address Hazard
to address
collaboration in hazard Mapping
hazard threats
convergence threats in 3 Advocacy
mechanisms at years
all levels
Chapter III
PLAN
Table 6 . Project Work Plan and Budget Matrix
After SPT convene, we came up the list of solutions for the identified
root causes.
3
No proper Lack of orientation on Conduct film viewing on the bad effect of
waste disposal proper waste disposal unsanitary environment
Unsafe school Poor/incomplete Seek fund/resources for the realization of the
fencing school fencing project through:
PTA, LGU, NGOs, Alumni Association,
Barangay Council
Table 7. PROJECT WORK PLAN AND BUDGET MATRIX for PROJECT CARE
Activity Output Date of Person Budget Budget
Implemen Responsible Source
tation
School
memorandum
Conduct of SH
Results of Pre-
pre- June 2019 Proponent 500 MOOE
assessment
assessment Teachers
process
Attendance SH
List of Facilitators Proponent
500 MOOE
Planning- Activities to be Teachers
Conference on conducted June 2019
the Program Proposal
School
memorandum
Approval of
Approved SH
Proposal by June 2019 300 MOOE
Proposal SDO
authorities
Implementatio
Approved Project
n of Project June 2019 All Teachers 3,000.00 MOOE
Proposal
CARE
School
Conduct of
Memorandum
Post- March SH
Results of post 300.00 MOOE
intervention 2020 Teachers
Assessment
Assessment
process
Note: Monitoring and evaluation of the activities be done by the school head every
end of the school year.
School
MOOE/
Conduct of Memorandum SH,Math
October, Donations
remedial Results of Coordinator, 300.00
2019 from
instruction Assessment Teachers
parents
process
Problem Statement: 44% (137 out of 311)of pupils is under wasted and severely
wasted nutritional status
Project Objective Statement: To decrease percentage of pupils belonging to
wasted and severely wasted nutritional status from 44% to at least 15% in 3 years.
Root Cause: Poor economic condition of the pupils
Table 9. Project Work Plan and Budget Matrix for PROJECT OPLAN BALIK
LAKAS
Nutritional
SH
Status Report
Identifying Teachers
in table and
Nutritional June15 2019 School 100 MOOE
in graph
Status of pupils Nutrition
(Baseline
Coordinator
data)
SH
Teachers
School
Pictures Nutrition
Implementation
Results of July 2019 to Coordinator SBFP
Phase 295,920.00
assessment Decmber,2019 PTA Officers Fund
Other data Brgy.
Representative
Parents
pupils
SH
Identifying Nutritional
Teachers
Nutritional Status Report SBFP
February,2020 School 500
Status of pupils in table and Fund
Nutrition
(Endline data) in graph
Coordinator
Note: Please record also the date of monitoring per project
Table 10. Project Work Plan and Budget Matrix for PROJECT MES
Attend mentoring Action Plan August 2019 School Head 1,000 MOOE
through SLAC, Master
Table 11. PROJECT WORK PLAN AND BUDGET MATRIX for PROJECT
FENCING
ACTIVITIES OUTPUT DATE OF PERSON(s) BUDGET BUDGET
IMPLEMEN RESPONSIBL SOURCE
TATION E
Consider the MDP, June 2019 School Head, 50,000.00 MOOE
project APP Teachers
improvement
in MOOE fund
Planning Attendanc July 2019 School Head, None
conference e Teachers
with teachers/ Minutes of
School BAC meeting
Prepare the Approved Sept. 2019 School Head,\ None
project project Disbursing
proposal and proposal Officer
POW on and POW
School
Improvement
Canvass RFQ February SH, BAC None
hardware Forms 2020
materials
using RFQ
Putting up the Document February SH, Teachers 50,000.00 MOOE
project- ation, 2020
concrete reports
fence
Prrepare and Liquidatio February School Head, None
submit n report 2020 Teachers
liquidation duly
report received
by the
bookkeep
er
Paste the LR LR pasted February SH, SDO None
at at TB 2020
transparency
board
Table 12. PROJECT WORK PLAN AND BUDGET MATRIX for PROJECT AALIS
SH
Conduct Attendance, Teachers
meeting to Minutes of June15 2019 School 100 PTA Fund
parents meeting Nutrition
Coordinator
SH
Conduct Attendance
Teachers
orientation to Minutes of
School
pupils on the meeting June 18, 2019 300 PTA Fund
Nutrition
proper waste Agenda
Coordinator
disposal agreement
Close
monitoring on
July 2019 to
the Pictorials SH, Teachers 200 PTA Fund
March 2020
implementation
of the project
Giving
incentives/
Rewards to the
most
Pictorials March 2020 SH, Teachers 1000.00 Stakeholders
disciplined
grade level
proper waste
disposal
Project
pupils
Improve
ment report
Pre and post Remedial Tutor, tutees, July 2019 5000.00 MOOE
4
PLAM the numeracy test Instruction Math teachers to March
numeracy Accomplis Peer tutoring 2020
rate of ment report
grade 4 to
6 pupils
Project Improve Project Conduct School Head, July 2019 1000.00 MOOE
MES teachers/ Proposal SLAC MT, Teachers to March
(Mentoring Instructiona Attendance INSET 2020
Enhance- l Accomplish- TIP
ment competenc ment report
System e List of trainings
attended
OPLAN Improve School Landscaper,
TRANSFO school’s premises Landscaping School June 2019 15,000.0 MOOE
RM surroundin Landscaping Facilities 0
gs and Coordinator
landscapin
g
Project Ensure Project Construction SH, SDO, June 2019 50,000.0 MOOE
Fencing secirity of Proposal of school Teachers to March 0
the school POW fence 2020
children Liquidation
Report
Project Orient and Project Put up trash SH, Teachers, June 2019 5,000.00 MOOE
AALIS practice Proposal bins and pupils, parents to March
pupils on Accomplishme compost pit 2020
proper nt Report
waste
disposal
CHAPTER 4
MONITORING AND EVALUATION
Department of Education
Region V
Division of Camarines Sur
OCAMPO DISTRICT
MORIONES ELEMENTARY SCHOOL
VIRGINIA B. LOPEZ
ESP I/ Team Leader
Accepted by: