The document outlines the Taiba-1 IPP project, detailing key stakeholders including the principal buyer, project company, and contractors involved. It includes a revision summary indicating the approval status of the document as of February 3, 2025. The document is primarily focused on the ECC & CCC list related to the project.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
121 views4 pages

Taiba-1 Approval Document

The document outlines the Taiba-1 IPP project, detailing key stakeholders including the principal buyer, project company, and contractors involved. It includes a revision summary indicating the approval status of the document as of February 3, 2025. The document is primarily focused on the ECC & CCC list related to the project.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

PROJECT:

TAIBA-1 IPP

PRINCIPAL BUYER:

SAUDI POWER PROCUREMENT COMPANY

PROJECT COMPANY:

SIDRA ONE FOR ELECTRICITY COMPANY

PROJECT COMPANY’S CONSULTANT:

TRACTEBEL ENGIE

EPC CONTRACTOR:

TIEJUN

EPC CONTRACTOR’S CONSULTANT:

SARGENT & LUNDY

TITLE:
Taiba-1 ECC & CCC List

DOCUMENT NO.: REV NO.: 0B TOTAL PAGES: -

SAU4001-P000-ZEN-&BBD-02110 ISSUED FOR : Approval

REVISION STATUS

REVIEWER APPROVER
REV PREPARER
NO. MECH ELEC CIVIL C&I NAME DATE

0B Azhar Shi Peng 03-02-2025


Hussain

INTERNAL DOCUMENT No. DOCUMENT OWNER

TIEJUN
Document No: Internal Document No.
TAIBA-1 IPP
SAU4001-P000-ZEN-&BBD-02110
Page

Taiba-1 ECC & CCC List -


Rev.0B

Revision Summary Sheet

Rev No. Details / Description Date


0A Issued for Approval 02-01-2025
0B Issued for Approval 03-02-2025
Document No: Internal Document No.
TAIBA-1 IPP
SAU4001-P000-ZEN-&BBD-02110
Page

Taiba-1 ECC & CCC List -


Rev.0B

TABLE OF CONTENTS

1. Attachement of ECC & CCC list ................................................................................