CV-your name Tel: +251942201687
Pavement/Material Engineer
1. Proposed Position: Material Engineer
2. Name of Firm: Hailay Gebregziabher
3. Date of Birth: 1972 Nationality: Ethiopian
4. Education:
July 1997 EC: Advanced Diploma in Construction Technology,
Maichew Technical College
October 2002 EC Bachelor of Degree in construction Technology from
Adama Scince and technology university
March 2008 EC MSc degree in Civil engineering specialization in Geotechnical
Engineering from Mekelle university
5. Other Training:
Certificate: Capacity Building Professional Training for Civil Engineers from
professional leadership institute
Certificate in different civil engineering software (Mx road, GIS for
infrastructures)
Conversant with Microsoft Offices & AutoCad
6. Countries of Work Experience: Ethiopia
7. Languages:
Speaking Reading Writing
English Excellent Excellent Excellent
Amharic Excellent Excellent Excellent
January 29, 2025 1 of 11
CV-your name Tel: +251942201687
Pavement/Material Engineer
8. Employment Record:
Year : Starting from April 2014 EC-April 2015 EC
Employer : Transnational Engineers Plc. & Prom. Engineering Soln.
Position Held : Material Engineer
Year : February 2013 EC – February 2014 EC
Employer : Sunshine construction Plc.
Position Held : Material Engineer
Year : December 2012 EC - September 2013 EC
Employer : Aser construction Plc.
Position Held : Material Engineer
Year : August 2008 EC – October 2010 EC
Employer : Nomy Engineering and Consulting Plc.
Position Held : Material Engineer
Year : March 2005 EC –June 2007 EC
Employer : Maedot consulting Engineers
Position Held : Material Engineer
Year : April 2004 EC–February 2005 EC
: June 2007 EC–January 2008 EC
: April 2015 EC-January 2017 EC.
Employer : Mekelle City admin., Infrastructure office.
Position Held : Project Engineer
Year : October 2010 EC – December 2012 EC
Employer : Sur construction Plc.
Position Held : Material Inspector
Year : October 2002 EC – October 2004 EC
March 2005EC – February 2007 EC
Employer : Defense construction Enterprise
Position Held : Site Engineer; Office Engineer respectively
January 29, 2025 2 of 11
CV-your name Tel: +251942201687
Pavement/Material Engineer
9 Work undertaken that best illustrates his capability to handle the tasks assigned:
9.1 Name of assignment or projects:-Gambela-Abobo-Pugnido AC Road project
Year: April 2014 EC – April 2015 EC
Location: Gambella-Abobo-Pugnido
Client: Ethiopian road authority
Employer: CRCC21 PLC.
Main project features: Construction Supervision
Position held: Material Engineer
9.2 Name of assignment or projects:-Guguftu-Wereilu-Degolo AC Road project
Year: February 2013 EC – February 2014 EC
Location: GUGUFTU-WEREILU-DEGOLO
Client: Ethiopian road authority
Employer: Sunshine construction PLC.
Main project features: Construction Supervision
Position held: Material Engineer
Activities performed:
Leading the project quality control staffs
Ensuring quality of ingredient construction material
Selection and Assessment of borrow areas
Ensuring compliance of used material with the project specification.
Monitoring and evaluation of quality control of materials in laboratory and
field tests
Supervising, participating and overseeing the direct sampling the direct
sampling and testing of all materials as per the project contract specification
and General specification.
Interpreting the commenced lab & In situ tests and evaluate the
recommended solution and corrective measures
January 29, 2025 3 of 11
CV-your name Tel: +251942201687
Pavement/Material Engineer
Joint preparation and carrying of concrete mix design, asphalt mix design
and supervision of their mix at plant and site
Carried out all quality tests on ingredients of all construction materials of
concrete and bituminous mixture.
Perform sampling and testing such as acceptance tests, material quality tests
and check tests for the acceptance or rejection of the material
Monitoring and evaluation of aggregate production, asphalt plant, and
concrete production
Perform assignments as per the project schedule and submit reports
To ensure compliance with the requirements of the project specifications
January 29, 2025 4 of 11
CV-your name Tel: +251942201687
Pavement/Material Engineer
9.3 Name of assignment or projects:- Bole michael Ring Road, AC road project
Year: December 2012 EC –September 2013 EC
Location: Addis Abbaba
Client: Addiss Ababa City roads
Employer: ASER construction PLC
Main project features: Construction Supervision
Position held: Material Engineer
Activities performed:
Leading the project quality control staffs
Ensuring quality of ingredient construction material
Assuring all construction activities which are executed to the extent it could meet the
expected end result.
Taking necessary remedial actions in case of deviation from the specification has been
reported.
Make sure the performance of the works with regards to workmanship and compliance
with the project specifications
Follow-up of work and monitor operations including adherence to safety and
environmental requirements.
Check the measurements of works and quality control tests commenced in laboratory
and in situ tests.
Follow and check Quality control of the works such as verification of lines and levels,
inspections of works, acceptance and rejection of the completed works and report to
the Project Manager about defective work and material if any.
Joint preparation and carrying of concrete mix design, asphalt mix design and
supervision of their mix at plant and site
Carried out all quality tests on aggregates for concrete and bituminous mixture
Monitoring and evaluation of aggregate production, asphalt plant, and concrete
production
January 29, 2025 5 of 11
CV-your name Tel: +251942201687
Pavement/Material Engineer
9.4 Name of assignment or projects:-Assosa-Agusha-Gengen-Salima design project
:-Assosa town Surface treatment Road project
Year: August 2008 EC –October 2010 EC
Location: ASSOSSA
Client: Regional construction office
Employer: NOMY Consulting Engineers PLC.
Main project features: design & Supervision
Position held: Material Engineer
Activities performed
Guide and supervise each type of works prescribing the construction
methodologies and control tests specification, etc. to ensure construction of a
high quality.
Tackle and decide in consultation with the Team leader any material testing
specific problem pertaining might arise during the execution.
Deals with the relevant material engineering aspects, like materials for all
civil works, mix designed, laying procedure in accordance with specifications.
Quality control of executed works and report to Quality Control
Manager/Construction Engineer/ Project Manager about defective work and
material.
Asses the existing Road condition and suggest alternatives to the design
Assist in preparation of reports.
Identifying materials required and estimating quantities and qualities of each
material.
Determination of the usage value of the material.
Controlling the production of material on the spot
January 29, 2025 6 of 11
CV-your name Tel: +251942201687
Pavement/Material Engineer
9.5 Name of assignment or projects:-Humera,Welkait, Tsegede Area URRAP projects
Year: March 2005 EC –June 2007 EC
Location: Tigray
Client: Regional construction office
Employer: Regional construction office
Main project features: design & Supervision
Position held: Material Engineer
Activities performed
Selection and Assessment of borrow areas
Control of Production methodology and stock piling Technics
Evaluation of quality of materials and maintaining the costs allocated for the
works
Evaluation of laboratory and field tests
Guide and supervise each type of works prescribing the construction
methodologies and control tests specification,
Monitoring the cost effectiveness and active public participation expressing
their desire
Creating of awareness for periodic maintenance of the works so as to
increment of its life span
Evaluate implementation of introduced construction quality control system
and reporting formats
January 29, 2025 7 of 11
CV-your name Tel: +251942201687
Pavement/Material Engineer
9.6 Name of assignment or projects:-The City Asphalt roads (50km) and other types
Year: April 2004 EC –February 2005 EC
June 2007 EC –January 2008 EC
April 2015 EC.-January 2017 EC
Location: Mekelle
Client: Mekelle infrastructure office
Employer: City infrastructure office
Main project features: Construction Supervision
Position held: Project Engineer
Activities performed:
Planning and monitoring the project works as per the project technical
specification
Follow up all activities on the site and keeping daily site diary of the daily
activities including daily progress of works, delays, weather, personnel,
equipment
Preparation of contract agreement such as supplementary agreement and
variations
Inspection of Earthworks , back slopes, benching etc
Inspection of Embankment works including proper compaction, placing,
layer thickness, appropriate moisture contents are being used
Inspection of pavement works including proper compaction, placing, layer
thickness, appropriate moisture contents are being used
Supervise contractors site laboratory and Engineers facility
Follow up all contractual agreements, cash flow
Coordinate the work of construction activity on behalf of client
January 29, 2025 8 of 11
CV-your name Tel: +251942201687
Pavement/Material Engineer
9.7 Name of assignment or projects: Wukro-Abrha asbha-Nebelet AC Road Upgrading
Project
Year: (October 2010 EC -December 2012 EC)
Location: WUKRO-NEBELET
Client: Ethiopian Roads Authority
Employer: SUR construction PLC
Main project features: Construction Supervision
Position held: Material Inspector
Activities performed:
Joint Soil and Material Survey
Selection of borrow areas
Joint carrying out of asphalt mix design
Joint preparation of mix design for concrete and supervision of the mix at
plant and site work
Carried out quality tests on aggregates for concrete and bituminous mixture
Assist the Material Engineer in searching borrow and quarry sites
Jointly as required perform sampling and testing such as acceptance tests,
material quality tests and check tests for the acceptance or rejection of the
material
Carrying out in-situ tests and monitoring tests conducted by the Contractor
Inspection of aggregate production, asphalt plant, and concrete production
Perform assignments as per the direction of the other experts and submits
reports
January 29, 2025 9 of 11
CV-your name Tel: +251942201687
Pavement/Material Engineer
9.8 Name of assignment or projects:-Shire Hospital compound Road & building
Project
Year: October 2002 EC – October 2004 EC
March 2005 EC –February 2007 EC
Location: SHIRE
Client: Ethiopian defense force
Employer: Defence construction Enterprise
Position held: Site & Office engineer respectively
Activities performed:
Inspection of Earthworks
Inspection of Pavement works including proper compaction and moisture
contents are being achieved
Ensure that good workmanship is carried out in the construction of the
works.
Monitor the Contractor's operations, including adherence to safety
requirements.
Carry out quality control of works, verification of lines and levels, inspection
of works, acceptance and rejection of the completed works.
Supervise the placing, spreading and compaction of capping, sub-base, base
course and asphalt materials.
Maintain a record set of working drawings
Carry out compilation and verification of "as- built drawings", of the works.
Assist the resident engineer in preparation of project reports.
Monitor & evaluation the implementation of project contract specification.
January 29, 2025 10 of 11
CV-your name Tel: +251942201687
Pavement/Material Engineer
10. Certification
I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly
describes me, my qualifications and my experience. I understand that any willful misstatement
described herein may lead to my disqualification or dismissal, if engaged.
Date: ___________
[Signature of Staff Member or Authorized Day/Month/Year
Representative of the Staff]
Full Name of Authorized_________________________________
January 29, 2025 11 of 11