Lyceum of the Philippines University
Cavite Campus
College of Engineering Computer Studies and Architecture
DEPARTMENT OF ARCHITECTURE
Building Technology 5
Critique Sheet
Final Major Plate Period
Date Reviewed : JANUARY 2, 2025 (RE-ASSESSED)
Name of Group : ARKIFUSION CO.
Project Name : NOT PROVIDED
Project Title : PROPOSED 30-STOREY RESIDENTIAL CONDOMINIUM
Date Filed : DECEMBER 21, 2024
I. CRITERIA
Architectural Solution
The Group was able to Provide Architectural Solutions with Innovative
Approaches, Shows Mastery in Space Planning, Site Planning with 30%
Considerations with the Location, and other Elements that affects Site Planning,
Designing with Legal Considerations, Presentation of Ideas, Concepts that brings
the totality of the Building Design that considers Firmitas, Utilitas, and Venustas.
Knowledge in Building Technology
The Group was able to Provide Solutions in General Construction Methods and
was able to specify Construction Concepts applied to their proposed design. This 30%
shall show the use of Construction Methods from Substructure, Superstructure,
with Consideration of the Correct Allotments to Vertical and Horizontal Spaces in
relation to Architectural Requirements of the Building.
Use of Alternative Building Materials
The Group was able to integrate the use of Alternative Building Materials as
prescribed in the Problem. Which includes the use of I-Beams, Pre-Cast Concrete, 30%
Pre-Cast Walls, Curtain Walls, and any other Alternative Building Materials that
shows innovation in designing High-Rise Buildings.
Presentation Technique
The group was able to present properly with completeness, dilligence, good faith,
commitment and with Confidence. It includes detailed presentation, readable, 10%
coherence, consistency, and with the knowledge of the group to what they present,
their ability to explain and answer to the questions that was raised by the
presentor.
ADDITIONAL CRITERIA: Drawings/Plans without column grid call-outs,
unlabeled spaces and areas, and no reflected dimensions will have an automatic
deduction of 10-points (%) to their final Major Plate grade.
Grand Total 100%
Pointing System
30 Point Criteria 10 Point Criteria
12 to 16 Lacks Comprehension 4 to 5 Lacks Comprehension
17 to 20 Average 5 to 7 Average
21 to 25 Passing 7 to 9 Passing
26 to 30 Above Expectation 9 to 10 Above Expectation
Lyceum of the Philippines University
Cavite Campus
College of Engineering Computer Studies and Architecture
DEPARTMENT OF ARCHITECTURE
Building Technology 5
II. SCORE SHEET
Criterium for Building Technology 5 Assessment
Rate
Keywords / Description (10 Point Score Remarks
Criteria)
For Sewer Layout:
Architectural Solution - Do NOT embed your soil
pipes on your walls
(exterior/interior). These pipes
are floor mounted (soil pipes)
while the soil stack and vent
stacks are the only vertical
pipe which can be located to
your chase or partially
embedded on your walls.
- Sewer line for soil pipe should
be shown as solid line in
thicker line type. There should
be different line type to
represent the vent pipes.
- Reflect where are your clean-
outs.
For Waterline Layout:
- Waterline is not included to
the legend. Define properly.
- Reflect the location of your
The Group was able to Provide water meter assembly and
Architectural Solutions with Innovative valves locations.
Approaches, Shows Mastery in Space For FirePro (Sprinkler System):
Planning, Site Planning with Considerations - Consider showing the smoke
30% 6 22.8 detector location/s.
with the Location and other Elements that - Dimensions should be from
affects Site Planning, Designing with Legal inner wall to the center line of
Considerations, Presentation of Ideas, sprinkler.
Concepts that brings the totality of the For Lighting Layout:
Building Design that considers Firmitas, - Reflect where is the location
Utilitas, and Venustas. of your panel board
- For this practice, consider
showing your lighting layout
(lighting fixtures and its
dimensions from inner walls;
centerline of lighting fixtures
to lighting fixtures.
- For Switch location, show the
lighting fixtures included. E.G.
for S1 it includes a & b; S3 it
includes c,d,e,f,g, and etc.
- Show your circuit homeruns.
For Power Layout:
- LOCATIONS OF
CONVENIENCE OUTLETS
WERE NOT VISIBLE –
SEARCH THE PROPER
SYMBOL FOR
CONVENIENCE OUTLETS.
Lyceum of the Philippines University
Cavite Campus
College of Engineering Computer Studies and Architecture
DEPARTMENT OF ARCHITECTURE
Building Technology 5
- Consider to reflect the wall
height of c.o.
Knowledge in Building Technology GENERAL COMMENT:
Consider to re-study your ceiling
The Group was able to Provide Solutions in height clearances, as you need to
General Construction Methods and was visualize all the conduits,
able to specify Construction Concepts busways, ductworks, pipings, and
other instances where there will be
applied to their proposed design. This shall
30% 6 22.8 a need for higher soffit clearance.
show the use of Construction Methods from
Substructure, Superstructure, with For Reflected Ceiling Plan
Consideration of the Correct Allotments to - Consider larger scale.
Vertical and Horizontal Spaces in relation to Consider the lighting fixtures for
Architectural Requirements of the Building. fire exits. Where’s the vehicular
ramp?
Use of Alternative Building Materials Not reflected on plans.
The Group was able to integrate the use of
Alternative Building Materials as prescribed
in the Problem. Which includes the use of I-
30% 4 19.2
Beams, Pre-Cast Concrete, Pre-Cast Walls,
Curtain Walls, and any other Alternative
Building Materials that shows innovation in
designing High-Rise Buildings.
Presentation Technique
The group was able to present the required
documents properly with completeness,
diligence, good faith, commitment and with
10% 7 8.2
Confidence. It includes detailed
presentation, readable, coherence,
consistency, and with the knowledge of the
group to what the project/property needs.
Grand Total 100% 74.8%
Accepted by:
DIQUIT, JHOANNA MARIE C.
Group Leader, ARKIfusion Co.
Student, Building Technology 5
With conformance of the members:
ABUL, ANDREI GABBRIEL BIEN E.
Member 1, ARKIfusion Co. BRONCANO, JOHN LLOYD D.
Student, Building Technology 5 Member 2, ARKIfusion Co.
Student, Building Technology 5
Lyceum of the Philippines University
Cavite Campus
College of Engineering Computer Studies and Architecture
DEPARTMENT OF ARCHITECTURE
Building Technology 5
DESINGAÑO, JOHN PAOLO O. PIDLAOAN, JAMIELLE E.
Member 3, ARKIfusion Co Member 5, ARKIfusion Co
Student, Building Technology 5 Student, Building Technology 5
MARQUEZ, KATCHELLE C. SANTOS, RALF NICOS Y.
Member 4, ARKIfusion Co Member 6, ARKIfusion Co
Student, Building Technology 5 Student, Building Technology 5
TADLIP, LORENZO P.
Member 7, ARKIfusion Co
Student, Building Technology 5