Request For Inspection: IR No. NP-SD5-RFI-57211 To: Npc/Teth

The document is a request for inspection related to the Nam Phak Hydroelectric Power Project, specifically for civil work conducted by Contractor Song Da 5. It details the locations and types of inspections requested, including density and permeability tests at the Nam Pha Dam. The request is dated January 20, 2025, and includes signatures from the contractor and acknowledgment sections for the owner's engineer.

Uploaded by

trieu nguyen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
19 views1 page

Request For Inspection: IR No. NP-SD5-RFI-57211 To: Npc/Teth

The document is a request for inspection related to the Nam Phak Hydroelectric Power Project, specifically for civil work conducted by Contractor Song Da 5. It details the locations and types of inspections requested, including density and permeability tests at the Nam Pha Dam. The request is dated January 20, 2025, and includes signatures from the contractor and acknowledgment sections for the owner's engineer.

Uploaded by

trieu nguyen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

NAM PHAK HYDROELECTRIC POWER PROJECT

CIVIL WORK CONTRACT

REQUEST FOR INSPECTION


To: NPC/TETH
IR No. NP-SD5-RFI-57211 Date: 20/01/2025
Type of work
Excavation Geology Concrete Blasting HSE QC Survey
Locations
Contractor’s Site Installation Nam Phak Valve House Phou Pong Diversion Tunnel
Access Roads Nam Phak Powerhouse Quarry
Nam Phak Dam Nam Pha Powerhouse Penstock
Nam Pha Dam Nam Phak Tunnel Nam Phak Switchyard

Phou Pong Dam Nam Pha Tunnel Others

Song Da 5, the NP main civil works Contractor is hereby requesting inspection as follows:
Location (Elevation, Purpose of Propose Date
Item for Inspection Remarks
Station) Inspection (1) and Time

-Zone 2B
Density test, Permeability test after compaction of Zone 2B at -Right bank-
Nam Pha Dam - 16:00
the right bank downstream from Sta. 0+416 to Sta. 0+437. F Upstream
Right Bank 20/01/2025
Elevation +945.031. Offset from +27m to +123m. -Layer: 2
-Volume: 970

1) Inspection purpose
A-Punch Listing D-Re-evaluation of NCR G-Material manufacturing at site
B-QC completion E-Notification of NCR deficiency of correction H-Field testing and inspection
C-Definition of construction details F-General inspection during work I-Others
Attachments: Yes No
Requested by SD5:
Name: Lương Văn Phong Signature: Date: 20/01/2025
Reference documents:
Note:. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

.......................................................................................................

.......................................................................................................

.......................................................................................................

.......................................................................................................

The Engineer's Site Instruction: Yes No

THE OWNER'S ENGINEER THE OWNER


THE CONTRACTOR
(ACKNOWLEDGED BY) (ACKNOWLEDGED BY)

Name: Lương Văn Phong Name: Name:


Date: 20/01/2025 Date: / / Date: / /