Request For Inspection: Date: 20/01/2025
Request For Inspection: Date: 20/01/2025
Song Da 5, the NP main civil works Contractor is hereby requesting inspection as follows:
Propose
Location (Elevation, Purpose of
Item for Inspection Date and Remarks
Station) Inspection (1)
Time
-Zone 2B
Inspection of topography after compaction of Zone 2B at the -Right bank-
Nam Pha Dam - 19:30
right bank downstream from Sta. 0+416 to Sta. 0+437. Elevation F Upstream
Right Bank 20/01/2025
+945.031. Offset from +27m to +123m. -Layer: 2
-Volume: 970
1) Inspection purpose
A-Punch Listing D-Re-evaluation of NCR G-Material manufacturing at site
B-QC completion E-Notification of NCR deficiency of correction H-Field testing and inspection
C-Definition of construction details F-General inspection during work I-Others
Attachments: Yes No
Requested by SD5:
Name: Lương Văn Phong Signature: Date: 20/01/2025
Reference documents:
Note:. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
.......................................................................................................
.......................................................................................................
.......................................................................................................
.......................................................................................................
1 ++4420
1
1 +4 0
1 +3
1 +3 0
30
1 +3 0
00
1 +3 0
8
1 +3
60
1 +2 0
4
1 +2 0
2
1 +2 0
0
1 +2
80
1 +2 0
6
1 +1 0
4
1 +1 0
2
1 +1
00
1 +1 0
8
1 +1 0
6
1 +0 0
4
1 +0
20
1 +0 0
0
1 +0 0
8
B B
1 + 80
6
40
0+ 960
2
00
0+ 940
9
0+ 20
0+ 900
0+ 880
9
0+
0+
0+ 820
86
0+ 00
8
0+ 780
0
4
0+ 60
0
8
0+ 40
0+ 720
7
0+ 700
7
0+ 80
0+ 660
0+ 640
6
0+ 20
0+ 600
0+ 580
6
0+ 60
0+
0+ 20
5
0+ 500
5
0+ 480
4
5
C C
0+
0
0+ 40
0+ 420
46
0+ 00
4
0+ 380
0
0+ 360
4
0+ 40
0+ 320
0+ 300
3
0+ 80
0+ 260
0+ 240
2
0+ 20
0+ 200
0+ 180
2
0+
0+
0+ 120
16
0+ 00
1
0+ 080
0
4
0+ 060
0
1
0+ 40
0+ 020
0+ 000
0
0+
D D
E E
KEY PLAN
legend
F F
G G
H H
TOPOGRAPHY PLAN OF NAM PHA DAM at the RIGHT BANK
I DOWNSTREAM AREA NO. A8 TO C8 I
NOTES:
1. ALL ELEVATIONS ARE IN METERS AND
REFER TO EL. 0.000 m.a.s.l.
2. ALL DIMENSIONS ARE IN METERS EXCEPT
LS17
WHERE OTHERWISE NOTED.
J REVERSION SURVEY DATE DESCRIPTIONS J
KM:0+080.00 00 20/JAN/2025 TOPOGRAPHY SURVEY AFTER EMBANKMENT
THE EMPLOYER:
K NAMPHAK POWER COMPANY LTD. K
OWNER'S ENGINEER:
TRACTEBEL ENGINEERING LTD.
THE CONTRACTOR:
L L
SONG DA 5 JOINT STOCK COMPANY.
SONG DA 5
Prepared Nguyen Minh Chien Approved Le Anh Duc
Drawn Nguyen Minh Chien Checked Luong Van Phong
M PROJECT: M
NAM PHAK HYDROELECTRIC POWER PROJECT
DRAWING TITLE :
410.00
TOPOGRAPHY PROFILE LONGITUDINAL SECTION (LS)
N SCALE: PROJECT: DRAWING NO: SHEET OF N
NP 01 02
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
A A
1 ++4420
1
C3
1 +4 0
1 +3
1 +3 0
30
1 +3 0
00
1 +3 0
8
1 +3
60
1 +2 0
4
1 +2 0
2
1 +2 0
KM:0+420.00
0
1 +2
80
1 +2 0
6
1 +1 0
4
1 +1 0
2
1 +1
00
1 +1 0
8
1 +1 0
6
1 +0 0
4
1 +0
20
1 +0 0
0
1 +0 0
8
B B
1 + 80
6
40
0+ 960
2
00
0+ 940
9
0+ 20
0+ 900
0+ 880
9
0+
0+
0+ 820
86
0+ 00
8
0+ 780
0
4
0+ 60
0
8
0+ 40
0+ 720
7
0+ 700
7
0+ 80
0+ 660
0+ 640
6
0+ 20
0+ 600
0+ 580
6
0+ 60
0+
0+ 20
5
0+ 500
5
0+ 480
4
5
C C
0+
0
0+ 40
0+ 420
46
0+ 00
4
0+ 380
0
0+ 360
4
0+ 40
0+ 320
0+ 300
3
0+ 80
0+ 260
0+ 240
2
0+ 20
0+ 200
0+ 180
2
0+
0+
0+ 120
16
0+ 00
1
0+ 080
0
4
0+ 060
0
1
0+ 40
0+ 020
0+ 000
0
0+
D D
E E
TOPOGRAPHY CROSS SECTION (KM0+420.00) KEY PLAN
C5
KM:0+430.00
legend
F F
G G
H H
I I
NOTES:
TOPOGRAPHY CROSS SECTION (KM0+430.00)
1. ALL ELEVATIONS ARE IN METERS AND
REFER TO EL. 0.000 m.a.s.l.
2. ALL DIMENSIONS ARE IN METERS EXCEPT
WHERE OTHERWISE NOTED.
J REVERSION SURVEY DATE DESCRIPTIONS J
00 20/JAN/2025 TOPOGRAPHY SURVEY AFTER EMBANKMENT
C6
KM:0+435.00
THE EMPLOYER:
K NAMPHAK POWER COMPANY LTD. K
OWNER'S ENGINEER:
TRACTEBEL ENGINEERING LTD.
THE CONTRACTOR:
L L
SONG DA 5 JOINT STOCK COMPANY.
SONG DA 5
Prepared Nguyen Minh Chien Approved Le Anh Duc
Drawn Nguyen Minh Chien Checked Luong Van Phong
M PROJECT: M
NAM PHAK HYDROELECTRIC POWER PROJECT
DRAWING TITLE :
TOPOGRAPHY CROSS SECTION (KM0+435.00)
N SCALE: PROJECT: DRAWING NO: SHEET OF N
NP 02 02
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19