Final Safty Equipment and Escape Route, Hac Layout-Model
Final Safty Equipment and Escape Route, Hac Layout-Model
Goa
Unit: V
ED
ST-7 CM
MANUFACTURING CORRIDOR-III
M M LINE IV M M M
ED
M STAIRCASE
CM
CM
DUCT
CIP/SIP
5170 DRAIN
CM
EMPTY VIAL M PRODUCTION
STORAGE & LOADING
INSPECTION AREA M OFFICE
AREA
(LINE-IV)
(LINE-IV)
CRASH PANEL
5111 M M
ED HATCH DOOR
LAUNDRY AREA
AIR LOCK
(GROUNDM FLOOR) 5082 5083 M SERVICE AREA M
MANUFACTURING CORRIDOR-III
5077 SERVICE AREA COOLING AREA M M
ZONE AREA (LINE-IV) MISCELLENEOUS 5194
COMPONENT PREPARATION AND
FEDEGARI AUTOCLAVE
(LINE-IV) M CONSUMABLE STORAGE AREA
STERILIZATION AREA-CPSA INSTRUMENT
(LINE-IV)
5081 STORAGE AREA
5078
CLEAN LIFT (LINE-IV) M
CPSA CLEAN EQUIPMENT M
HOLD AREA PPE
(LINE-IV)
SLIDING DOOR
STERILE CORRIDOR
5172
M
PACKING CORRIDOR-II
M CONTROL ROOM
(LINE-IV)
DECONTAMINATION (LINE-IV)
5072 CHANGE
M 5171 M
ROOM 5102 M
SCRAP 5167 DPB M EMPTY TRAYS STORAGE
5079 VIAL COLLECTION
COLLECTION AREA AREA AREA
UNIT DECONTAMINATION (LINE-IV) M
(GROUND FLOOR) PREPARTION AREA (LINE-IV) 5104
AREA
(LINE-IV) (LINE-IV)
DPB
M
M FINISHED GOODS STORE
M M
5168 5091
MIRROR
M 5090
5067 M M 5095
DPB
FILLING CHANGE FILLING
DPB CPSA TRANSFER M STERILE CORRIDOR M ROOM-III CHANGE
TOWARDS AIRLOCK (LINE-IV) (LINE-IV)
HATCH
ROOM-II
EXIT (LINE-IV) M
DPB (LINE-IV)
CROSS OVER BENCH
5087 5093 M
5092
COMPOUNDING DPB DPB FILLING FILLING
5086 CHANGE
5097 5096 RETURN RETURN
COMPOUNDING ROOM-III M
M (LINE-IV) STERILE FILTRATION M
FILLING HOLD AREA CHANGE CHANGE
CHANGE M
AREA M (LINE-IV) ROOM-I ROOM-II
ROOM-II M
(LINE-IV) (LINE-IV) (LINE-IV)
(LINE-IV) M
5169
5123
COMPOUNDING AREA
CROSSOVER BENCH
5085 M (LINE-IV) 5071 5089 CONDENSATE
COMPOUNDING M 5094 FILLING
PRODUCTION OFFICE FILLING MAIN RECOVERY ROOM
MCHANGE FFU CHANGE
IPA stand
ROOM-I M 5066 M
AIR LOCK ROOM-I M
MFG (LINE-IV) (LINE-IV)
M (LINE-IV) VESSEL M E-ROOM (LINE-IV)
TOWARDS (LINE-IV)
LINE-IV
CM M
MANUFACTURING CORRIDOR-III
LINE III
ED
M M M M M
ED CM 5106
MANUFACTURING CORRIDOR-III 5011
PPE
A/L-6
VIAL WASHING AND
DEPYROGENATION AREA 5033
LYOPHILIZER SERVICE AREA M
(LINE-III) 5104
M (LINE-III) FINISHED GOODS STORE
5015 LOADING BAY SPB
EMPTY VIAL M CH ROOM
ACCESSORIES AND INSPECTION AREA
CONSUMABLE STORAGE AREA M 5030 5105
(LINE-III)
M LYOPHILIZER
M VIAL FILLING ,LYO LOADING
M 5166 M SHUTTER
AND UNLOADING AREA
(LINE-III) 527
UNLOADING PLATFORM
M
DPB
M
COMPONENT PREPARATION
AND STERLISATION AREA-CPSA
2100MM WIDE CORRIDOR
(LINE-III) VHP UP
PASS BOX
M
MANUFACTURING CORRIDOR-II
5032
Autoclave
5031 VIALS COLLECTION AREA
CM
Service
M area FFU (LINE-III)
M
M
VIAL SEALING
5034 5157 5029 AREA
M Steam 5109
WFI ROOM -II M Sterilizer COOLING (LINE-III)
ZONE AREA
(LINE-III) M
FINISHED GOODS COLD STORAGE
PACKING CORRIDOR-II
M M Mirror
STERILE CORRIDOR
M 5024
Mirror
(LINE-III)
Autoclave FILLING
5156 Service CHANGE CROSSOVER BENCH
area
PPE CPSA FILLING M
ROOM-III
5158 HOLD AREA 5023
CHANGE (LINE-III) M
ROOM DECONTAMINATION (LINE-III) FILLING
5010 CHANGE ROOM DPB CHANGE
M (LINE-III) (LINE-III)
UNIT M 5162M ROOM-II
PREPARTION AREA 5159
DPB (LINE-III) M (LINE-III)
5059 DECONTAMINATION
M
MEDIA STORAGE ROOM AREA
(LINE-III) M
5161 SGC
COMMON STERILE CORRIDOR
M
AIR LOCK (LINE-III)
M
(LINE-III) Mirror
CM
5022
CM
5025
DPB
DPB
CROSSOVER BENCH
M FILLING
FILLING
M
RETURN
5016 CHANGE
MOBILE RACK DPB M
5056 CHANGE
ROOM-I
COMPOUNDING M ROOM-I
M
CHANGE
M ROOM-I STERILE FILTRATION (LINE-III) (LINE-III)
(LINE-III) AREA
(LINE-III)
Mirror
M
5160
COMPOUNDING AREA 5036 5021
M M
(LINE-III) 5163 FILLING
5017 M E ROOM RETURN
MOBILE RACK FILLING MAIN
COMPOUNDING (LINE-III) CHANGE M
CHANGE ROOM-II M AIR LOCK
M ROOM-II
(LINE-III) (LINE-III) (LINE-III)
5050
M
QA DOCUMENT ROOM DPB
STAIRCASE
MOBILE RACK M M M
MANUFACTURING CORRIDOR-II
DPB
M
PPE CM
5058
M
PPE PACKING HALL
MOBILE RACK M 5183 M TERMINAL
STERILIZATION UNLOADING AREA
STAGING AREA SPARE AND CHANGE PARTS STORAGE AREA
PACKING CORRIDOR R-II
(PRODUCTION) M
5182
5164 M
SERVICE AREA
CM
TERMINAL
ST-3 STERILIZER
M
JANITOR
ROOM (PRODUCTION) TERMINAL
M 5142 M STERILIZATION LOADING AREA
M M
CM
M
EQUIPMENT & ACCESSORIES STORAGE ROOM 5165
5181
M
M
CM
MANUFACTURING CORRIDOR-I
SHAFT M LINE II M
M
ED
M
M
EXTRACT
201 EXTRACT
APPROVED EXTRACT
LYO LOADING AREA
Storage Room DEPYROGENATION
RAW MATERIAL EXTRACT
DPB
STORE-II
PACKING CORRIDOR-I
A30/R10
5147
EXTRACT
209
EXTRACT
204 STERILE
DECONTAMINATION DPB
MANUFACTURING CORRIDOR-I
538
265 EXCIPIENT 205
CH.ROOM III CH-III QA ROOM-II
DISPENSING UNIT PREPARATION
VLCS
EXTRACT 213 RB
RB
MFG
CORRIDOR
EXTRACT
EXTRACT
EXTRACT
EXTRACT
RET.CH.ROOM-I
EXTRACT
M 210 ROOM
EXTRACT
219
EXTRACT
CHANGE 5127
PRE
MANUFACTURING CORRIDOR-I ROOM-I
CHANGE
M
5145
M ROOM 5126
EXTRACT
EXTRACT
CORRIDOR
APPROVED 5125
RAW MATERIAL EXTRACT
STORE-I
539
M DOCUMENTATION
M M M
CM
540
INCUBATION
MANUFACTURING CORRIDOR-I
WORK IN
COLD STORAGE
DEEP FREEZER
COLD
STORAGE ROOM PROGRESS ROOM
5178 5177
ACTIVE SAMPLING
PACKING CORRIDOR-I
5116 DPB
5144 M M M
APPROVED RAW MATERIAL
STORES-III
PILASTER-80
LOW HUMIDITY
GLOVE VBOX
M
5117
CH.ROOM
CHANNEL-80
PILASTER-80
CH.ROOM M
279 DPB
SAMPLING 5143
UNLOADING PLATFORM
EXCIPIENT M
DPB
PRODUCTION
RLAF
OFFICE
ROLLING
SHUTTER
5184
549
A/L-5
P.M.TESTING 308
PRODUCTION DEDUSTING ED
322 DN
MANUFACTURING PACKING E.W.C.
LADIES CHANGE ROOM 311 OFFICE
ST-1 CHANGE ROOM CHANGE ROOM 550
321
I.W.C.
LINEN VISITORS
DUCT LADIES
STORES CHANGE
5137 5138 ROOM TOILET 5130 UP
BOOTY LOCKERS
9 NO. x 12 High
SHOWER
DN
SPB
5131
STREET
UP DN SHOE CORRIDOR Q.C.GENTS CHANGE ROOM
VISITORS CORRIDOR
STAIRCASE ST-2
CRASH PANEL
ENTRANCE LOBBY
CHANGE ROOM
5133 STAIRCASE
ED LOBBY AREA
5134
Service Door
5135
TOILET
MALE 5124
5179
STORAGE
LINEN WC WC WC WC WC/SHOWER ROOM
STORAGE ROOM
5136
LEGENDS
SYMBOLS DESCRIPTION
ED
EMERGENCY DOOR
SMOKE DETECTOR
ZONE 21: ABOVE 1M AFTER ZONE Z20 REVIEWED BY REVIEWED BY
User Department Head EHS Department
ZONE 22: AFTER ZONE Z21/SOURCES
HEAT DETECTOR OF RELEASE Date Date
ZONE 0 : WITHIN 1M SOURCES OF
PPE PERSONAL PROTECTIVE EQUIPMENTS BOX
RELEASE REVIEWED BY APPROVED BY
Quality Assurance Unit Head
CM CONTROL MODULE ZONE 1: ABOVE 1M AFTER ZONE Z0 Date
Date
PUBLIC ADDRESS SYSTEM ZONE 2: AFTER ZONE Z1/SOURCES OF APPROVED BY
N PUBLIC ADDRESS HOOTER
RELEASE
Head Unit QA
Date
FIRE ALARM
DATE OF EFFECTIVE
(EP-044/F2/5)