Foundation MR - Brarath 09.09.21 Model

The document provides a detailed schedule of footings and reinforcement for a proposed G+2 residential building in Saidapet, Chennai. It includes specifications for various footings, such as dimensions, reinforcement details, and concrete mix requirements. Additionally, it outlines guidelines for materials and construction practices to be followed during the project.

Uploaded by

SivarajSiva
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
41 views1 page

Foundation MR - Brarath 09.09.21 Model

The document provides a detailed schedule of footings and reinforcement for a proposed G+2 residential building in Saidapet, Chennai. It includes specifications for various footings, such as dimensions, reinforcement details, and concrete mix requirements. Additionally, it outlines guidelines for materials and construction practices to be followed during the project.

Uploaded by

SivarajSiva
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

NOTES:

SCHEDULE OF FOOTINGS
REINFORCEMENT 1. ALL DIMENSIONS ARE IN FEET & INCHES
NAME OF SIZE NO OF
S NO FOOTING Lx X Lz d d1 D FOOTING 2. USE CONCRETE - M25 (DESIGN MIX)
SHORT DIRECTION LONG DIRECTION
3. MINIMUM CEMENT CONTENT SHALL NOT
01 F1 6'-3" x 6'-3" 8" 18" 6'-9" 10# @ 6" C/C 10# @ 6" C/C 2
10'-3" 5' BE LESS THAN 340 KG/CU.M FOR M25
[3.12] [1.52]
4'-6" 4'-6" 02 F2 5'-6" x 5'-6" 8" 17" 8'-2" 10# @ 6" C/C 10# @ 6" C/C 3 4. HIGH YIELD STRENGTH DEFORMED BARS
41" 4'-11" 4'-11" 41"
[1.03]
3'-412"

2 2 2 2
Fe500 CONFIRMING IS 1786-1985 TO BE USED
2'-3" 2'-3"

2'-3" 2'-3"
03 F3 5'-0" x 5'-0" 8" 16" 6'-9" 10# @ 6" C/C 10# @ 6" C/C 2
4'-6"

4'-6"
F4 F4 5. NO ADMIXTURES SHALL BE ADDED
C4 C4
04 F4 4'-6" x 4'-6" 8" 16" 6'-9" 10# @ 6" C/C 10# @ 6" C/C 4 WITHOUT PERMISSION OF CONSULTANT.
[3.58]
11'-9"

6. CLEAR COVER TO THE REINFORCEMENT


5'-6" 5'-6"
05 CF1 Ref plan 12" 24" 6'-9" 12# @ 6" C/C 12# @ 6" C/C 1
41" 5'-11" 1 FOR FOOTING: 50MM, COLUMN 40MM ,BEAM
2 2 5'-12" 41"
2
06 CF2 Ref plan 12" 22" 6'-9" 12# @ 6" C/C 12# @ 6" C/C 1 30MM, SLAB 25MM.
3'

3'
5'-6"

5'-6"
PLINTH BEAM
7. DEVELOPMENT LENGTH OF BAR Ld AS 50Ø,
F2 F2
2'-6"

2'-6"
C2 C2
WHERE Ø = DIA OF BAR.
SCHEDULE OF STRAP BEAM 8. STRUCTURE IS DESIGNED FOR G+ 2
[3.28]
10'-9"

NO NAME OF SIZE OF SHAPE OF


5'-6"
8'-9" BEAM
SHAPE OF REINFORCEMENT
STIRRUPS FLOORS.
41" 5'-11" BEAM BEAM TIES BOTTOM
3'-41"
TOP
2 2
2
5' 41"
2 9. THE SAFE BEARING CAPACITY OF SOIL IS
G.L
1'-101"
2'-6"

1 SB1 15" X 24" 10# AT 6" C/C 8# @ 6" C/C


3-20# 3-20# TAKEN AS 140 kN/M2 AT 2.1 M DEPTH.
5'-6"

F2 C1 C4
C2
3'
[1.75]
5'-9"

10# @ 6"C/C
5'-9"

9'-6"

CF1
3 -20# (T)
C1 C4
3-20# (B)
1'-101"
2

12# 6" C/C BOTH DIRECTION


12"
P.C.C 4" TK
[3.20]

M.SAND 4" TK
10'-6"

5'
41" 4'-71" C.S OF COMBINED FOOTING b-b'
2 2
b'
3'-4"

F3
C3
5'
3'-914"

1'-9" 1'-8"
[1.15]

PLINTH BEAM
GL

6"
6"
PLINTH BEAM
3'-12"
1
[0.30]

SB1 R.C.C COLUMN


1'

6'-3"
5'
3'-3"

F3
3'-11"

C1 CF2 C2
2

C3 3-20# (T)
REINFORCEMENT ALONG

D
3- 20# (B) LATERAL TIES
1 LONG DIRECTION 12# @ 6"C/C
41" 4'-72" 08.09.2021
2
41"
BOTH DIRECTION 0 N/A
5' 4'-41" 5'
2
2
9'-9" REINFORCEMENT 10 @ 6" C/C
ALONG 12" 12" 12" 12"
SHORT DIRECTION 4" THK PCC REV. DATE DESCRIPTION BY
[5.11]

4"
16'-9"

4" THK M-SAND


4" REF PLAN 4"
ADVANCE COPY
PLAN OF ISOLATED FOOTING L.S OF COMBINED FOOTING
(CF2) b

PROJECT

PROPOSED G+2 RESIDENTIAL BUILDING


1"

3'-41"
3'-42

F1 BRICK WALL
F1
C1 C1 GL
6'-3"

6'-3"

PLINTH BEAM PLINTH BEAM PLINTH BEAM LOCATION:


2'-101"

2'-101"
2

GL PROPOSED RESIDENTIAL BUILDING AT


SAIDAPET, CHENNAI.
1
42" 5'-101" 5'-101" 41"
2 R.C.C COLUMN
[3.28]

2 2
10'-9"

6'-3" 6'-3" 12 @ 6" C/C

CLIENT:
Mr. N.BHARATH
R.C.C WALL
COLUMN REINFORCEMENT 9" THK. DATE: JOB NO.:
2'-6"

2'-6"

09.09.21 07/ 2021


4'-6"

4'-6"

8/10 mm TIES AT 6" C/C


F4 F4 TITLE:
2'

2'

C4 C4 REINFORCEMENT ALONG FOUNDATION LAYOUT &


[1.71]
5'-712"

LONG DIRECTION
1
42"
1
4'-12" 4'-11" 41" REINFORCEMENT DETAILS
2 2
REINFORCEMENT ALONG 10 @ 6" C/C
4'-6" REFER SCHEDULE
SHORT DIRECTION
DRAWING NO.: SCALE:
01 NTS
4" THK PCC
4" THK M-SAND DRAWN BY: DESIGNED BY: CHECKED BY:
K.S M.N.D N.K.R
4" THK PCC REVISION
4" THK M-SAND
0
C.S OF ISOLATED FOOTING
C.S OF LIFT FOOTING SHREE CONSULTANTS
(CF-1) Adayar, Chennai - 600020.
TYPICAL SECTION OF COMBINED FOOTING