NOTES:
SCHEDULE OF FOOTINGS
REINFORCEMENT 1. ALL DIMENSIONS ARE IN FEET & INCHES
NAME OF SIZE NO OF
S NO FOOTING Lx X Lz d d1 D FOOTING 2. USE CONCRETE - M25 (DESIGN MIX)
SHORT DIRECTION LONG DIRECTION
3. MINIMUM CEMENT CONTENT SHALL NOT
01 F1 6'-3" x 6'-3" 8" 18" 6'-9" 10# @ 6" C/C 10# @ 6" C/C 2
10'-3" 5' BE LESS THAN 340 KG/CU.M FOR M25
[3.12] [1.52]
4'-6" 4'-6" 02 F2 5'-6" x 5'-6" 8" 17" 8'-2" 10# @ 6" C/C 10# @ 6" C/C 3 4. HIGH YIELD STRENGTH DEFORMED BARS
41" 4'-11" 4'-11" 41"
[1.03]
3'-412"
2 2 2 2
Fe500 CONFIRMING IS 1786-1985 TO BE USED
2'-3" 2'-3"
2'-3" 2'-3"
03 F3 5'-0" x 5'-0" 8" 16" 6'-9" 10# @ 6" C/C 10# @ 6" C/C 2
4'-6"
4'-6"
F4 F4 5. NO ADMIXTURES SHALL BE ADDED
C4 C4
04 F4 4'-6" x 4'-6" 8" 16" 6'-9" 10# @ 6" C/C 10# @ 6" C/C 4 WITHOUT PERMISSION OF CONSULTANT.
[3.58]
11'-9"
6. CLEAR COVER TO THE REINFORCEMENT
5'-6" 5'-6"
05 CF1 Ref plan 12" 24" 6'-9" 12# @ 6" C/C 12# @ 6" C/C 1
41" 5'-11" 1 FOR FOOTING: 50MM, COLUMN 40MM ,BEAM
2 2 5'-12" 41"
2
06 CF2 Ref plan 12" 22" 6'-9" 12# @ 6" C/C 12# @ 6" C/C 1 30MM, SLAB 25MM.
3'
3'
5'-6"
5'-6"
PLINTH BEAM
7. DEVELOPMENT LENGTH OF BAR Ld AS 50Ø,
F2 F2
2'-6"
2'-6"
C2 C2
WHERE Ø = DIA OF BAR.
SCHEDULE OF STRAP BEAM 8. STRUCTURE IS DESIGNED FOR G+ 2
[3.28]
10'-9"
NO NAME OF SIZE OF SHAPE OF
5'-6"
8'-9" BEAM
SHAPE OF REINFORCEMENT
STIRRUPS FLOORS.
41" 5'-11" BEAM BEAM TIES BOTTOM
3'-41"
TOP
2 2
2
5' 41"
2 9. THE SAFE BEARING CAPACITY OF SOIL IS
G.L
1'-101"
2'-6"
1 SB1 15" X 24" 10# AT 6" C/C 8# @ 6" C/C
3-20# 3-20# TAKEN AS 140 kN/M2 AT 2.1 M DEPTH.
5'-6"
F2 C1 C4
C2
3'
[1.75]
5'-9"
10# @ 6"C/C
5'-9"
9'-6"
CF1
3 -20# (T)
C1 C4
3-20# (B)
1'-101"
2
12# 6" C/C BOTH DIRECTION
12"
P.C.C 4" TK
[3.20]
M.SAND 4" TK
10'-6"
5'
41" 4'-71" C.S OF COMBINED FOOTING b-b'
2 2
b'
3'-4"
F3
C3
5'
3'-914"
1'-9" 1'-8"
[1.15]
PLINTH BEAM
GL
6"
6"
PLINTH BEAM
3'-12"
1
[0.30]
SB1 R.C.C COLUMN
1'
6'-3"
5'
3'-3"
F3
3'-11"
C1 CF2 C2
2
C3 3-20# (T)
REINFORCEMENT ALONG
D
3- 20# (B) LATERAL TIES
1 LONG DIRECTION 12# @ 6"C/C
41" 4'-72" 08.09.2021
2
41"
BOTH DIRECTION 0 N/A
5' 4'-41" 5'
2
2
9'-9" REINFORCEMENT 10 @ 6" C/C
ALONG 12" 12" 12" 12"
SHORT DIRECTION 4" THK PCC REV. DATE DESCRIPTION BY
[5.11]
4"
16'-9"
4" THK M-SAND
4" REF PLAN 4"
ADVANCE COPY
PLAN OF ISOLATED FOOTING L.S OF COMBINED FOOTING
(CF2) b
PROJECT
PROPOSED G+2 RESIDENTIAL BUILDING
1"
3'-41"
3'-42
F1 BRICK WALL
F1
C1 C1 GL
6'-3"
6'-3"
PLINTH BEAM PLINTH BEAM PLINTH BEAM LOCATION:
2'-101"
2'-101"
2
GL PROPOSED RESIDENTIAL BUILDING AT
SAIDAPET, CHENNAI.
1
42" 5'-101" 5'-101" 41"
2 R.C.C COLUMN
[3.28]
2 2
10'-9"
6'-3" 6'-3" 12 @ 6" C/C
CLIENT:
Mr. N.BHARATH
R.C.C WALL
COLUMN REINFORCEMENT 9" THK. DATE: JOB NO.:
2'-6"
2'-6"
09.09.21 07/ 2021
4'-6"
4'-6"
8/10 mm TIES AT 6" C/C
F4 F4 TITLE:
2'
2'
C4 C4 REINFORCEMENT ALONG FOUNDATION LAYOUT &
[1.71]
5'-712"
LONG DIRECTION
1
42"
1
4'-12" 4'-11" 41" REINFORCEMENT DETAILS
2 2
REINFORCEMENT ALONG 10 @ 6" C/C
4'-6" REFER SCHEDULE
SHORT DIRECTION
DRAWING NO.: SCALE:
01 NTS
4" THK PCC
4" THK M-SAND DRAWN BY: DESIGNED BY: CHECKED BY:
K.S M.N.D N.K.R
4" THK PCC REVISION
4" THK M-SAND
0
C.S OF ISOLATED FOOTING
C.S OF LIFT FOOTING SHREE CONSULTANTS
(CF-1) Adayar, Chennai - 600020.
TYPICAL SECTION OF COMBINED FOOTING