0% found this document useful (0 votes)
18 views1 page

220 KV Earth TCC

The document contains electrical specifications for a 220 kV bus system, detailing current ratings, time settings, and protection relay configurations for various transformers and bus ties. It includes information on CT ratios, pickup values, and time dials for different operational scenarios. The project is located in Hospet, Karnataka, and is associated with a ground fault analysis dated November 14, 2024.

Uploaded by

reltecempmails
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views1 page

220 KV Earth TCC

The document contains electrical specifications for a 220 kV bus system, detailing current ratings, time settings, and protection relay configurations for various transformers and bus ties. It includes information on CT ratios, pickup values, and time dials for different operational scenarios. The project is located in Hospet, Karnataka, and is associated with a ground fault analysis dated November 14, 2024.

Uploaded by

reltecempmails
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Amps X 10 Bus14 (Nom. kV=220, Plot Ref.

kV=220)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 500

300 300
220 KV O/G TO 80 MVA TRF - N
OC1
Schneider Electric
P141 U2
CT Ratio 600:1 220 KV TRANSFER BUS - N - 51 15242.047 MVAsc
100 Group 1 100
OC1
IEC Standard Inverse
Schneider Electric
Pickup = 0.08 (0.08 - 4 xCT Sec)
P141
Time Dial = 0.25 MAIN BUS-1 SW24
50 CT Ratio 600:1 50
3x = 1.58 s, 5x = 1.07 s, 8x = 0.824 s
Group 1
IEC Standard Inverse
30 30 ±

Pickup = 0.2 (0.08 - 4 xCT Sec) MAIN BUS-2 R


Time Dial = 0.305
220 KV INCOMER
3x = 1.92 s, 5x = 1.31 s, 8x = 1.01 s
SW7 SW6 SW11 SW10 SW13 SW12
SW1 SW2 SW27 SW26
220 KV O/G TO 160 MVA TRF - N 220 KV O/G TO 160 MVA TRF - G
10 OC1 OC1 10
Schneider Electric Schneider Electric CB4
P141 P141
±

R
CT Ratio 600:1 CT Ratio 3000:1 CB2 CB22
5 5 CB1 CB7
Group 1 Group 1 220 KV BUS TIE

Seconds
Seconds

IEC Standard Inverse IEC Standard Inverse


3 Pickup = 0.15 (0.08 - 4 xCT Sec) Pickup = 0.2 (0.08 - 4 xCT Sec) 3 SW3 SW29 SW25
Time Dial = 0.19 Time Dial = 0.12
3x = 1.2 s, 5x = 0.813 s, 8x = 0.626 s 3x = 0.756 s, 5x = 0.514 s, 8x = 0.396 s ±

SW4 220 KV TRANSFER BUS SW23


SW8
1 220 KV BUS TIE - N - 51 1
∆ 0.227 s
OC1 TRANSFER BUS
∆ 0.215 s
Schneider Electric
.5
P141 .5
CT Ratio 600:1 SW5
Group 1
.3 IEC Standard Inverse .3
Pickup = 0.2 (0.08 - 4 xCT Sec) ±
±
Time Dial = 0.4 R R
3x = 2.52 s, 5x = 1.71 s, 8x = 1.32 s 220 KV O/G TO 80 MVA TRF - G 220 KV O/G TO 80 MVA TRF 220 KV O/G TO 160 MVA TRF
OC1
.1 Schneider Electric .1
220 KV INCOMER - N - 51 P141
OC1 CT Ratio 1600:1
Schneider Electric Group 1
.05 P141 IEC Standard Inverse .05
CT Ratio 600:1 Pickup = 0.18 (0.08 - 4 xCT Sec)
Group 1 Time Dial = 0.215
.03 .03
IEC Standard Inverse 3x = 1.35 s, 5x = 0.92 s, 8x = 0.709 s 220 KV O/G TO 80 MVA TRF - G - LG
Pickup = 0.2 (0.08 - 4 xCT Sec) 220 KV TRANSFER BUS - LG 220 KV INCOMER - LG
Time Dial = 0.5 220 KV O/G TO 160 MVA TRF - LG 220 KV BUS TIE - LG
3x = 3.15 s, 5x = 2.14 s, 8x = 1.65 s 220 KV O/G TO 80 MVA TRF - LG
220 KV O/G TO 160 MVA TRF - G - LG
.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 10 Bus14 (Nom. kV=220, Plot Ref. kV=220) ETAP Star 22.5.0D

Project: ISP MRSS Date: 14-11-2024


Location: HOSPET KARNATAKA Rev: Base
Contract: BGR Fault: Ground
Engineer: REALTECH