The document is a detailed architectural and engineering plan for the renovation and expansion of the Beiersdorf PC facility in Malang, Indonesia. It includes various sections such as key plans, locations of gate valves, water tanks, and chemical utility areas, as well as specifications for existing and new structures. Additionally, it outlines the layout for pedestrian areas, storage, and utility rooms, along with notes on dimensions and construction management details.

Uploaded by

miftah ahsan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
87 views1 page

Dismantling Non Soldier Pile HDPE

The document is a detailed architectural and engineering plan for the renovation and expansion of the Beiersdorf PC facility in Malang, Indonesia. It includes various sections such as key plans, locations of gate valves, water tanks, and chemical utility areas, as well as specifications for existing and new structures. Additionally, it outlines the layout for pedestrian areas, storage, and utility rooms, along with notes on dimensions and construction management details.

Uploaded by

miftah ahsan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

KEY PLAN

Posisi Gate Valve 16


14
22

21

Titik pemotongan 02 Ø200mm Area 20 23


04

Titik pemotongan pipa HDPE pipa Corner Warehouse


03 LOCATION

Posisi Gate Valve 10


02

pipa HDPE pipa hydrant 07

01 Ø200mm Area 18
15

hydrant
RAW Water Tank 13
19

200-FH-150235-CA
BOP +0.444

N
EXISTING BUILDING NEW BUILDING
DRIVER
WAITING
ROOM
SECURITY
ROOM LOCATION
NEW GUTTER EXISTING GUTTER

SLOPE
PEDESTRIAN

KEY PLAN
EXISTING PEDESTRIAN
COMBUSTIBLE AREA COMBUSTIBLE AREA

RAW WATER TANK


GV
GV CHEMICAL UTILITY
AREA
B3 CHEMICAL
PRODUCTION

PEDESTRIAN
LUBRICANT RO CHEMICAL WASTE CHEMICAL B3 CHEMICAL
Deepwell AREA AREA AREA PRODUCTION UNLOADING TRUCK

PANCANG RWT

NEW GUTTER
PEDESTRIAN

SLOPE 10°
PIT existing
SRU

STORAGE FUEL
NOTE & LEGEND
EXISTING PEDESTRIAN
AREA

- ALL DIMENSIONS ARE IN MILLIMETERS UNLESS NOTED


STRATIFICATION
TANK GENSET

AKSES HSPD L 5330 x W 2180 x H 2518

120 ton

KEEP EXISTING
UNLOADING TRUCK
FOR AREA BOILER
OTHERWISE.

EXISTING GUTTER

EXISTING GUTTER
RHI OFFICE CKD SITE OFFICE
200-FH-HDPE TRAFO 02

RHI OFFICE
MEETING ROOM DEMOLITION CHILLER ROOM
EXISTING PUMP ROOM
SOLVED
RECOVERY AREA - : DEMOLISH PIPE
(UNDER TRAFO 01
BECA OFFICE CKD SITE OFFICE
GROUND
Toilet
PIPE
PH OHB - : EXISTING PIPE
INSTALLATION) (EXISTING APPARATUS)

MVMDP
Cont. 10ft

EXISTING GUTTER
- : NEW RE-ROUTING FH Ø100mm
Mushola
SPACE MURINDA
- : NEW RE-ROUTING FH Ø200mm
Smoking
Room
- : NEW RE-ROUTING DPW Ø65mm
Cont. 10ft
Toilet

- : NEW RE-ROUTING DPW Ø40mm


WASTE SHELTER
Toilet
Pekerja
1

- : HOLD (Wait Further Information from BDF)


ECONOMICAL B3 & VEHICLE
WASTE HAZARDOUS PARKING
08.00.04 08.00.05 08.00.06
FFL±0.000 FFL±0.000 FFL±0.000

LOADING DOCK

GV Ø200 CORRIDOR
08.00.07
FFL±0.000

DOMESTIC CARTOON
SPARE ROOM WASTE RETURN
08.00.01 08.00.02 08.00.03 MATERIAL MATERIAL
FFL±0.000 FFL±0.000 FFL±0.000
PERSONAL AIRLOCK OUT AIRLOCK IN
OFFICE
BATTERY AIRLOCK
WAREHOUSE
CHARGHING

MANUAL SAMPLING ROOM


WASHING
BYPAS
FINISH ROOM

HYDRANT EKSISTING perbandingan radius MANUAL


desain dan akutal BYPAS
BANGUNAN BARU PALLET TRANSFER PALLET TRANSFER
BY LIVI STATION 1 STATION 2

EXISTING MAIN LINE HYDRANT PIPA Ø200mm


CLEANING

UNDER GROUND POSITION ROOM

REV DATE DRAWN DESCRIPTION


ALCOHOL DHOSING
AIR LOCK CLEAN WORKSHOP & RM/PPM AIRLOCK ALCOHOL ROOM
LABEL STAGING AREA BATTERY CHARGING 1 CHANGE PARTS BATTERY CHARGING 2 WASTE ROOM

CLIENT :
container 20 feet
storage

container 20 feet
storage
CONTAINER
BANGUNAN EKSISTING EKSISTING

container 20 feet
container 20 feet container 20 feet container 20 feet
storage storage storage

storage
PT BEIERSDORF INDONESIA
Jl. Raya Randuagung - Singosari KM 75,
Randuagung, Singosari, Malang

OWNER REPRESENTATIVE :
EX. FUEL TANK

PT BIMATEKNO KARYATAMA
LIFT KONSULTAN

EX. FUEL TANK


CIP RETURN
TANK
Tempo Scan Tower 25th floor
Jl. H.R. Rasuna Said Kav. 3 – 4
KOH
EQUIPMENT
Jakarta Selatan 12950

CONSTRUCTION MANAGEMENT PT HASKONING INDONESIA


TECHNICAL
MIXER ROOM
EQUALIZATION
Arkadia Green Park, Tower G, 10th
Jl. Let. Jend. TB Simatupang Kav 88,
TANK
60M3

Kebagusan, Pasar Minggu, South Jakarta,


12520, Indonesia.
T: +62 21 397 11320
AERATION
E: [email protected]
TANK
180M3

SANDALS RACK FEMALE LOCKER

TECHNICAL

TOILET
CHANGING ROOM
ZONE A
MIXER ROOM
CONTRACTOR
PT CITRA KARSA DINAMIKA
PRODUCTION OFFICE
Design - Manufacturing - Construction - General Trade
AIRLOCK
Jl. Pangkalan II No.35 RT 04/02
TOILET

MALE LOCKER
Cikiwul, Bantar Gebang - Bekasi Timur
SANDALS RACK CLEAN CHANGE OVER FILLER
COSMETIC
PACKING
LAB.
AREA
CIP ROOM Phone :Telp. (62-021) 86210121
WASHING

PANTRY
WORK
STATION
Fax. :(62-021) 86210120

SERVER HEALTCARE CIP & DIW


PROJECT TITLE :
LABORATORY TECHNICAL ROOM
ROOM EXPANSION LAB. PREPARATION ROOM CLEAN ROOM
LAB MICRO LAB MICRO

BEIERSDORF PC MALANG RENOVATION & EXPANSION


AREA
MICROBIOLOGY
LAB
PASS
WORK SERVER BOX

STATION ROOM PASS

MAGMA 2 PROJECT
BOX
PRINT
STATION
WASH BASIN CHEMICAL
LABORATORY CHEMICAL
DOSING
INSTRUMENT DOSING
ACID
FOCUS FOCUS FOCUS FOCUS ROOM

GUTTER
ROOM ROOM ROOM ROOM

UF
675.0000
GUTTER

2100.0000
GUTTER

CCRO
WORK

DRAWING TITLE :
STATION STORAGE
LOBBY

2100.0000
MEETING
ROOM

UF
MOTHER

2100.0000
ROOM

GUTTER

650.0000
BACK SITE AREA

RO
GUTTER

LAYOUT NEW INSTALLATION FIRE HYDRANT & DEEP


WELL PIPE
GUARD
CROSS LINE
HOUSE DATE :
30-___-HI
-03
IH-___

DRIVER
30-___-HI
-03
IH-___

30-___-HI

SHELTER
3
__-0
IH-_
30-___-HI

r
03
__- _
IH-

30-___-HI
-03
IH-___
30-___-HI

30-___-HI
_-03
IH-__

_-03
IH-__
30-___-HI
-03
IH-___

DROP OFF
YOUR REQUEST IS :
30-___-HI
3
__-0
IH-_
CABINET
FILLING

30-___-HI
GUARD1

3
__-0
IH-_
CONCRETE

30-___-HI
FFL±0.000
11.00.01

-03
IH-___
HOUSE
TABLE

30-___-HI

30-___-HI
_-03
IH-__

_-03
IH-__

APPROVED APPROVED WITH NOTED HOLD


30-___-HI
-03
IH-___

30-___-HI
03 -
___
IH-
30-___-HI
3
__-0
IH-_

30-___-HI
_-03
IH-__
30-___-HI

30-___-HI
-03

-03
IH-___

IH-___
30-___-HI
-03
IH-___

30-___-HI
-03
IH-___

RETURN FOR CORRECTION REJECT


30-___-HI
3
__-0
IH-_

30-___-HI

GATE 1
RAMP
-03
IH-___

SLIDING
30-___-HI
_-03
IH-__

30-___-HI

PT. CITRA KARSA DINAMIKA PT. HASKONING INDONESIA PT. BECA


-03
IH-___

-03
IH-___
30-___-HI

30-___-HI
-03
IH-___

30-___-HI

30-___-HI
30-___-HI
-03
IH-___

DRAWN BY: CHECKED BY:


30-___-HI

APPROVED BY: APPROVED BY: APPROVED BY: APPROVED BY:


-03 _
IH-__
30-___-HI
-03
IH-___

30-___-HI
_-03
IH-__

GATE 2
30-___-HI
-03

SLIDING
IH-___

30-___-HI
-03
___
IH-
30-___-HI

-03 _
IH-__
3
__-0
IH-_

30-___-HI
-03
IH-___
30-___-HI

30-___-HI
-03
IH-___

PT. BEIERSDORF INDONESIA SCALE

ACKNOWLEDGE : ACKNOWLEDGE : ACKNOWLEDGE :

SIZE
DWG NO :
A3

You might also like