0% found this document useful (0 votes)
31 views2 pages

Roles and Responsibilities

The document outlines daily operational activities including handling pending emails, ticket statuses, server health checks, and purging activities. It details the steps involved in purging unnecessary data, redundancy activities, and the importance of patching for system maintenance. Additionally, it mentions the synchronization of primary and disaster recovery setups in Mumbai and Chennai, along with daily reporting and KPI preparation tasks.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as TXT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
31 views2 pages

Roles and Responsibilities

The document outlines daily operational activities including handling pending emails, ticket statuses, server health checks, and purging activities. It details the steps involved in purging unnecessary data, redundancy activities, and the importance of patching for system maintenance. Additionally, it mentions the synchronization of primary and disaster recovery setups in Mumbai and Chennai, along with daily reporting and KPI preparation tasks.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as TXT, PDF, TXT or read online on Scribd
You are on page 1/ 2

L1/L2

Morning-Evening-Night
(I used to get the handover from the people having morning shift that included)

pending mails
1
2
3

activity (left to perform)


1 xyz - tonight
2

ticket status
SR how many - 4
CR how many - 2
IN how many - 1

Servers health check - diskspace/memory cpu utilization/load average/cron


status/report status/transaction status/process status

process status - ps command


transaction status - logs
report status
cron jobs - cron tabs

Daily - prepared KPI reports/share MIS status with client/work on ticket / plan and
perform the activity

Activity: purging activity/3 months old data is dropped(we got the purging document
and after login into the database the purging activities were completed)/redundacy
activity/patching activity

Purging: Purging is the process of removing unnecessary or redundant data from a


system to free up space and improve performance 🧹✨.
PR DR drill: PR (Primary Recovery) and DR (Disaster Recovery) drills are practice
exercises to ensure systems can be recovered after a failure or disaster .
PR setup in Mumbai
DR setup in Chennai
so, PR has to be matched with DR and they has to be in sync
wigh DR. Monthly checks are done.

Steps in purging:
1. Identify Data: Determine which data is no longer needed based on criteria
like age, usage, or relevance 📊🔍.
2. Backup: Create a backup of the data to be purged to prevent accidental
loss 📦💾.
3. Delete Data: Use commands or tools to remove the identified data from the
system .
4. Verify: Ensure that the purging process is successful and no essential
data is lost ✅🔄.

redundancy activity: TXN1 and TXN2 - 1 pe transaction ja rahi hai ya nahin ja rahi.
Pehle 2 band kar denge, 2 ki transactions 1 pe jayengi, aur fir 1 ki band kar denge
aur wo 2 pe jayengi.
Why do we do the patching activity? multiple tasks, bug issue update, I do get the
artefacts, and then I close the services of the server and when patching is done
then the server is restarted and checking if all the components are working fine.

Application ke kaam- configuration, account create, account block, card group


configuration.
card group kya hota hai? is se related questions jo interview mein aa sakte
hain wo batao

You might also like