0% found this document useful (0 votes)
62 views8 pages

40' LPG ISO TANK - Port Moresby (Papua New Guinea)

YILTEKS ENERJI ISI MAKINA IMALAT SAN. & DIS TICARET LTD. STI. has provided a price offer for 12 units of 40' LPG-Propane ISO tanks, totaling $459,600, with a shipping freight of $75,600. The tanks are designed with specific technical specifications, including a maximum working pressure of 15.1 bar and various safety features, and are guaranteed for two years against manufacturing errors. The offer is valid for 15 days from October 16, 2023, with a payment term of 50% in advance and 50% before shipment.

Uploaded by

Puyo Benoit
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
62 views8 pages

40' LPG ISO TANK - Port Moresby (Papua New Guinea)

YILTEKS ENERJI ISI MAKINA IMALAT SAN. & DIS TICARET LTD. STI. has provided a price offer for 12 units of 40' LPG-Propane ISO tanks, totaling $459,600, with a shipping freight of $75,600. The tanks are designed with specific technical specifications, including a maximum working pressure of 15.1 bar and various safety features, and are guaranteed for two years against manufacturing errors. The offer is valid for 15 days from October 16, 2023, with a payment term of 50% in advance and 50% before shipment.

Uploaded by

Puyo Benoit
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

PRICE OFFER

YILTEKS ENERJI ISI MAKINA IMALAT SAN. & DIS TICARET LTD. STI.

MANUFACTURER COMPANY Adress:E-90 KARAYOLU ÜZERİ 4.KM NİZİP/GAZİANTEP-TURKEY


Tel:+90 342 444 6251
Fax:+90 342 513 00 61
E-mail:[email protected]
SERVICE COMPANY TO BE
SUBMITTED GEOGAS
SUBJECT LPG- PROPANE ISO TANK OFFER
REFERENCE RESULT OF MEETING
OFFER NR. A.Y.23/0323
DATE OF OFFER 16.10.2023

Dear Mr.Benoit,

According your request the price offer and technical specifications of 40’ PROPANE ISO TANK
is prepared below.

We will wait for your precious orders and wish you a good day.

Best Regards…

Mesut YILMAZ
Sales and Marketing Manager
1. ISO TANK

1.1. TANK SPECIFICATION

Brand YILTEKS / KPRP - 40


Type 40’ ISO TANK
Dished Head Type Eliptical
Design Temperature Min - 20 ºC / Max + 50 ºC
Design Code ASME SECTION VIII. DIV.2
Surge Plates According to Standard
External pressure 1 bar
Maximum Working Pressure 15.1 bar
Hydrostatic Test Pressure 22 bar
Service LPG- PROPANE
Tank Volume 51450 litres.
Shell thickness 10 mm – P355
Head thickness 12 mm – P355
Lenght with frame 12192 mm
Width witf frame 2438 mm
Height with frame 2896 mm
Quantity 12

1.2. TANK DETAILS

1.2.1. Sheet Metal

Tank shell and dish ends manufacturing with 3.1 certified level according to EN 10204 past the
lamination control according to EN 10160; P355 NL1 sheet according to EN 10028-3 standard.

1.2.2. Manufacturing

• Manufacturer will have EN ISO 3834-2 document.

• The body segments of the tank will consist of one piece.

• After dished head manufactured, thickness measurement will be done and will be recorded.
1.2.2.1 Welding & Workmanship

Our company has EN ISO 3834-2 certificate in welder and welding management system. All welding
will be made by certified welders in accordance with the appropriate welding method with proven
accuracy.

1.2.2.2. Heat Treatment


Tank's dish ends stressed reliefed will be processed. At the same time, the computer output will be
automatically graphic on the paper and placed in the prepared quality file of the tank by each
process.

1.2.3. TESTS

1.2.3.1 RADIOGRAPHIC CONTROL

• The tank's welding seams will be controlled through the radiographic control according to
the design rules and standards.

• Radiographic test shall be carried out in accordance with standard.

• NDT Personnel will be certified by ASME.

• Radiographic test will be performed using high-precision, panoramic and linear x-ray devices.

1.2.3.2. PENETRANT TEST OR MAGNETIC PARTICLE TEST

• All weldings welds will be checked by penetrant test or magnetic particle test method
according to design standard by certified NDT personnel.

1.2.3.3.HYDROSTATIC TEST

• At the end of the tank manufacturing, hydrostatic test will be done according to the rules
and standards.

• Clean and tap water will be used during the hydrostatic test.

• The water temperature which will be used will not be less than below 7 °C.

• The hydrostatic test will be approved by an third party.If requested, CUSTOMER will be able to
supervise the test

• Following the hydrostatic test, inside and all internal pipes of the tank will be dehydrated.
1.2.3.4.LEAKAGE TEST

• Tanks, piping and instrument installation will be leakage tested with air according to
design rules and standards after hydrostatic test.
• During the leakage test, the joints will be checked with foam by Professional personel will be
withnessed supervisior from notified body.

1.2.4. PAINTING PROCESS

• The exterior surface of the tank will be cleaned so that no burrs, no oil and no dirt remain on
the surfaces.

• Following the cleaning works, sandblasting will be applied to obtain surface appearance of
SA2 ½ quality.

• Minimum surface roughness value will be Rz = 40 microns.

• The paint system to be applied on the outer surface of the tank will be as follows:
1. Epoxy based primer as first coat (80-100 micron dry film thickness)
2. Epoxy intermediate coat as second layer (80-100 micron dry film thickness)
3. Acrylic polyurethane topcoat as third layer (50-60 micron dry film thickness)
4. The total paint thickness will be in the range of 210 - 260 microns
5. The final color of the tank will be white (RAL 9016)

• Paint film thicknesses, pre-application curing times, and more, will follow the paint
manufacturer's recommendations

• The products of the brands which have proven quality with the references in marine and
industrial applications in paint application will be used; Sandblasting and painting will be
done with first class workmanship

• Liquid pipelines will be in white color and gas pipelines will be in yellow color.

1.2. TANK ACCESSORIES

• All accesories which used on the tank will be supplied and worldwide brand accesories will
be selected.

• Identification and sizing of accessories and installation locations will be compatible to


standards.
• Any situation that puts safety and human health at risk will be considered when constructing
a tank installation.

• When designing accessories and installation, ease of maintenance, operation and


disassembly will be taken into account.

• All loading and unloading equipment, made of carbon steel and it will be positioned in the
side of the tank in a lockable armature cabinet.

1.4. OTHER POINTS TO CONSIDER

• The cover of the armature cabinet will be shock absorber. The shock absorbers will be
positioned so that they can be easily assembled and disassembled.

• Stainless steel locking system will be used on cover of the armature cabinet.

• All valves and equipments in the cabinet will be numbered.

• The P&ID and installation description will be installed where they can be seen in the tank
armature cabinet.

• The protection box made of steel sheet will be manufactured around the safety relief valves
and will be designed to prevent the collection of rainwater.

• 2 fire extinguisher cabinets with transparent windows, made of plastic will be installed on
the tank.
• There will be a sunshield on the tank.

• There will not be a catwalks and ladder on the tank.

• Reflectors,safety marking and labeling will be supplied by YILTEKS

• Surge plates will be cross type and disassemble. The surge plates will be designed so that
they can be taken out of the manhole when needed.

• Surge plates and surge plates connection plates will not be assemblied directly on the shell.

• The surge plates will be assemblied in doubling plates to be positioned on the tank shell.

• Surge plates assembly will be made with bolt and nut.


• The tank label to be manufactured from stainless steel will be installed where it can be seen
easily. The data on the label will meet the requirements of the minimum standard.

2.1. ISO FRAME

• The ISO frame allows for these tank containers to be transported on the trucks. This
flexibility provides a safe, reliable and cost-effective way to transport such cargoes to
locations across.

• Frame in accordance with ISO Standard 1496/3.

• It will be designed and manufactured with resistance with full load in road conditions.

• Reinforcement pads will be welded to the tank shell for legs to the tank.

3. CHECKING LIST

Provided Documents:

• Technical drawing

• Metal analysis report

• Stamping Report

• Tank Orientation

• Material Control Report

• Hydrostatic Test Report and certificate

• Visual and dimensional control report

• Heat treatment report

• Bill of Lading Paper or Non-Negotiable Seaway Bill

• Commercial Invoice, Packing List & Certificate of Origin

• Welder documents, WPS-PQR documents and hydrostatic tests are complience will be done

under the supervision which is an international company of Third party TUV.


4. TANK ACCESSORIES

ISO TANK CONTAINER STANDARD MATERIAL LIST

NO DESCRIPTION QUANTITY BRAND & MODEL

1 Manhole 1 Pc. DN 450 (18’’)

2 Safety Relief Valve 2 Pcs. 3’’ ATILIM

3. Rotogauge Level gauge with Protection Cover 1 Pc. 1’’ ATILIM

4. Magnetel level gauge with Protection Cover 1 Pc. 4” ROCHESTER-Dial

5. 3" Soft Check Valve 1 Pc. ATILIM

6. 2" Hydraulic Valve 1 Pc. ATILIM

7. Hydraulic Hand Operator 1 Pc. ATILIM

8. Constant Level valve (5% - 85%) 2 Pcs. REGO-3165C


9. Ø63 Manometer 0 - 40 bar with Protection 1 Pc.
Cover PAKKENS
10. Ø65 Thermometer –30 +60°C with Protection 1 Pc.
Cover PAKKENS
11. PN40 DN50 Ball Valve 3 Pcs. BATU

12. 3 1/4"ACME Adapter and Cover 3 Pcs. ATILIM

13. Fire Extinguisher Cabinet and its Cylinder 2 Pcs. YILTEKS

14. Armature cabinet 1 Set YILTEKS

15. ISO 1496/3 Frame 1 set YILTEKS

16. Sunshield 1 Set YILTEKS


5. COMMERCIAL ISSUES

DESCRIPTION UNIT PRICE QUANTITY TOTAL PRICE

40’ LPG- PROPANE ISO TANK 32.000,00$ 12 / UNIT 384.000,00$

Shipping Freight 6.300,00$ 12 / UNIT 75.600,00$

Grand Total: 459.600,00$

Option: Offer validity is 15 days from 16.10.2023

Delivery Location: CFR Port Moresby ( Papua New Guinea)

Payment Term: %50 advance, %50 balance before shipment.

Warranty: Products manufactured by YILTEKS are guaranteed for 2 years from the date of invoice
against manufacturing and workmal errors. Accessories which will be used on the tank not made of
YILTEKS, supplier/producers warranty terms will be valid. Problems caused by user errors are not
covered by the warranty.

The works which are not mentioned in the quotation or which are required to be amended shall be
made by adding or subtracting them to the price of the tender offer with the approval of the parties.

You might also like