The Comprehensive Energy Project (CEP) in Sonoma County aims to reduce greenhouse gas emissions, improve energy efficiency, and achieve financial savings through various energy initiatives. Key components include a 1.4 MW fuel cell power plant, energy audits, and the implementation of energy efficiency measures across county facilities. The project is designed to be expense neutral from day one, with financing based on projected energy savings and various incentives.

Uploaded by

mnmnghmnmngh522
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
22 views23 pages

Comprehensive Energy Projects Cep and Innovative Financing

The Comprehensive Energy Project (CEP) in Sonoma County aims to reduce greenhouse gas emissions, improve energy efficiency, and achieve financial savings through various energy initiatives. Key components include a 1.4 MW fuel cell power plant, energy audits, and the implementation of energy efficiency measures across county facilities. The project is designed to be expense neutral from day one, with financing based on projected energy savings and various incentives.

Uploaded by

mnmnghmnmngh522
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 23

Comprehensive Energy Projects (CEP)

and Innovative Financing

June 21, 2011


1
Sonoma County – CPAP history

2001 Joined ICLEI – Cities for Climate Protection


• First Climate Pledge
2002 County GHG Assessment - Orrett
• Goals, targets, opportunities, cogeneration possible
2006 Climate Protection Action Plan – CPAP
1. Set Policy - BOS Resolution to exceed AB32
2. Recommended Energy & Sustainability Manager/ Division
3. Recommend hire Energy Services Company (ESCO)
4. Recommended EEM’s/ Comprehensive Energy Project (CEP)
5. Set GHG target reduction of GHG by 8,454 tons:
• Buildings - 6,348 tons, Fleet - 436 tons, Commute – 1,670 tons
2
Sonoma County – Policies

2006 BOS Resolution GHG Targets exceed AB32


• 20% below 2000 GHG by 2010
• 25% below 1990 GHG by 2015
Permitting and Resource Management (PRMD)
– 2008: LEED certified for commercial and BIG for residential
– 2011: Currently adopted CALGreen Tier 1
– Next: International Green Construction Code (IGCC)
2010 – GS Green Building Policy County Facilities
– LEED certified <10,000 s.f.
– LEED Silver minimum goal >10,000 s.f.
– LEED Gold minimum goal >50,000 s.f.
– Maximize green, sustainable and energy efficiency
3
Sonoma County – Background

Various 20th Century Efficiency Projects


First decade 21st Century Projects:
– 5-6 MW Landfill Gas
– Local Government Electric Vehicle Partnership
• County plus 9 Jx = 240 hybrids, plug-ins and EV’s
– 820 MW Solar 2 projects, more planned
– CEP w/ 1.4 MW Fuel Cell CHP Power Plant
– 1MW biogas (compost) in development
– 5MW to date – Sonoma County Energy
Independence Program (SCEIP)
– Bloom box technology in consideration
– Off bill, ARRA, and QCEB funded projects
– 5 MW savings – Sonoma County Energy Watch
(SCEW)
4
Sonoma County – Other Agencies

Sonoma County Water Agency (SCWA)


– Goal of carbon free water delivery by 2015
– 22.4MW in development including CCA feasibility
– 2.2 MW Solar 3 projects – $15.5M, projects received
$4.49M in PG&E rebates
– 2.64 MW Hydro
– 32 hybrids and plug-in hybrids
– Wave power feasibility study – 2 to 5 MW at each of 3
locations, potential expansion 40 MW.
– Geothermal project in development
Sonoma County Fair and Exposition
– 1.36 MW Photovoltaic, State grant funding
5
Sonoma County – Other Agencies

Sonoma County Water Agency (SCWA)


– 5.6 MW Biomass – 1.4 MW Fuel Cell project in development

6
Sonoma County – CEP history

2006-2008 – Develop CEP (Phase I)


– RFP to select Energy Services Company (1 year)
– Complete Inventory Grade Energy Audit (1 year)

2008-2010 – Execute CEP (Phase II)


– CEP Objectives:
1. GHG reduction
2. Positive Financial Impact
3. Infrastructure Renewal
7
Comprehensive Energy Project

CEP Process
– Phase I – Inventory County
Facilities (1 year)
• Prepared Investment Grade Audit
• 180 Energy Efficiency Measures
(EEM) assessed
• 101 EEM’s recommended

Fuel Cell Module


– Phase II – CEP
• Phase IIA – 38 EEM measures, 24
buildings plus Fuel Cell
• Phase IIB – To be determined from
remainder on list of 101 EEMs
8
Comprehensive Energy Project

38 EEMs at 24 buildings
Lighting retrofits, 20 buildings, 1.3 MWh savings
HVAC replace or rebuild in 4 buildings
HVAC Motors & Controls MADF
Central Mechanical Plant (CMP) upgrade
Water retrofits, including detention, 20 M gallons/yr.
Ozonator for Detention Laundry Water
1.4MW Fuel Cell Cogeneration Power Plant

9
1.4 MW Fuel Cell Power Plant

Fuel Cell Energy DFC 1500


– Generates 10,693,216 kWh/year
– Produces 45 billion BTUs year
– Produces virtually no NOx or SOx
pollutants
– Reduce GHG emissions by 69%
versus grid power
– Designated “Ultra-Clean” by CARB
– Categorically exempt from CEQA

10
1.4 MW Fuel Cell Power Plant

Fuel Cell Energy Production

8
1.4 MW Fuel Cell Power Plant

Fuel Cell Installations in California:


– City of Santa Barbara, 500KW
– Sierra Nevada Brewing Co., Chico, CA 1MW
– Sheraton Hotel, San Diego 1MW
– Westin Hotel, San Francisco Airport, 600KW
– California State Univ. at Northridge, 1MW
– City of Riverside 1MW
– County of Alameda, 1MW
– Turlock Irrigation District, 1.2 MW
– City of Tulare, 900KW
– Dublin San Ramon Service District, 600KW
– Cache Creek Casino, 750 KW
– Santa Clara 1996 – 4@500MW
11
1.4 MW Fuel Cell Power Plant

Sonoma County Fuel Cell Power Plant


•Largest fuel cell in California - First article 1.4MW
•1.4 MW Distributed Generation (DG) creates more
reliable power for County Center in brown out situation.
•Adjacent to CMP for Combined Heat and Power (CHP)
• Certified Combined Heat and Power (CHP) per
CPUC §2840 Guidelines, Section III
• 47% electrical efficiency , plus 20% due to CHP
(compare fossil fuel plants 33% efficient)
• No transmission loss to deliver to 12kV loop
•Natural gas provided by utility non-core.
• Shopping for renewable gas supply
•SGIP incentive of $3,000,000 from PGE toward the
$9,763,271 cost
13
1.4 MW Fuel Cell Power Plant

County Utility Costs –


• Prior County electric bill $1.5M annually
• New County power costs $1.5M annually
• Gas bill for fuel cell is $350k
• Amortize equipment costs (debt repayment)
• Pay FCE maintenance costs
• Prepay (amortize) stack replacement @ 5th year
County Load Characteristics –
• Demand at night – 8-900 kW due to detention 24/7
• Demand summer peak – 2,500kW or more
• Supply constant 1.4MW (Part Peak Load match)
• AB1613 Feed in Tariff (FIT) desired.
• Looking at additional load shifting opportunities
Fuel Cell Payback is Seven Years! 14
1.4 MW Fuel Cell Power Plant

SPECIAL ISSUES:
• Interconnection to utility was difficult
• Fuel cell module on-site August 2010
• Turned “on” in December 2010
• Digital Metering desired per building–
• First meter $25k with software
• Subsequent meters $15k
• Metering Load –
• Net generation output meter at the fuel cell
• No meter at the connection of12kV loop to PGE
• Maintenance –
• No problems yet with seamless electric supply
• Demand charges are severe when FC drops out
15
Financing

Directive: Make CEP Expense Neutral Day 1 Î


– California Government Code §4217.10 finance based on savings
– Obtained Private Loan Financing – Bank of America
– Based on equipment lease model
– Collateralized on improvements
– Bond package option as backup
16
Financing

Financing Plan
Project Cost $22,272,029
Incentives, Grants, and Rebates ($3,941,226)
Financed Amount $18,730,803
Estimated Interest Rate* 4.98%
Repayment Term 16 years
Assumed Closing/Funding Date 1/1/09
Assumed Annual Energy Cost Escalation* 5%
First year of positive cash flow Year 12
Total payments $31,794,615
Total cumulative positive cash flow after 25 years
$38,404,231
(estimate life of equipment)

* Rates are estimates and are subject to change. 5.4 was max rate 17
Rebates

Rebates played a big part in our total financial package. 18


Cost Savings

Comprehensive
Projected Cost Savings
Energy Project - Phase 2 Projected Projected
EnergyEnergy
& Water Cost
and Water Cost
Energy and Water Savings Projection Total Financing
Total Financing and Maintenance Costs
& Maintenance Costs
$6,000,000

$5,000,000

$4,000,000
Dollars
Dollars

$3,000,000

$2,000,000

$1,000,000

$-
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
Year
Year 19
CEP Results

CEP Objectives Met ?


1. GHG reduction 6,135 tons*
– Electricity reduction 13,365,226 kWh
– Water savings = 19,138,260 gallons
– Utility savings = $1,689,316
2. Saving $$$, No General fund impact
3. Replaced old worn out equipment
* Now in 1 year Measurement and Verification
+ Created jobs, collaboration, other benefits
20
Additional Projects

• LED Parking lot retrofit with


On Bill Financing
• Sustainable Energy
Practices Guidebook

www.sonoma-county.org/gs/energy/index.htm
21
State of California Trending

Governor Jerry Brown Goals


Distributed Generation Renewable

1.3 Million MW feasible CA


Increase RPS 20% to 33%
20,000 MW Distributed
Generation – Renewable
– 8,000 MW utility scale
– 12,000 MW small projects
• 2,500 MW state facilities
By 2020 (9 years)
22
Thank you

Julia Donoho, AIA, Esq. – Major Project Architect


Project Manager of Comprehensive Energy Project
[email protected]
707- 565-1366

Sam Ruark– Energy & Sustainability Coordinator


[email protected]
707- 565-2125 23