0% found this document useful (0 votes)
26 views1 page

MB03-3 M601 DD - Chilled Water Schematic For Full MegaCHlP2 (White Space) (Rev 1) 1

The document outlines the specifications and design notes for a chilled water schematic system, including dimensions, flow rates, and installation guidelines. It emphasizes the need for proper coordination, flushing arrangements, and adherence to manufacturer recommendations. Additionally, it highlights the importance of using insulated piping and stainless steel valve stems with specific sealing requirements.

Uploaded by

vijaypattepury
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views1 page

MB03-3 M601 DD - Chilled Water Schematic For Full MegaCHlP2 (White Space) (Rev 1) 1

The document outlines the specifications and design notes for a chilled water schematic system, including dimensions, flow rates, and installation guidelines. It emphasizes the need for proper coordination, flushing arrangements, and adherence to manufacturer recommendations. Additionally, it highlights the importance of using insulated piping and stainless steel valve stems with specific sealing requirements.

Uploaded by

vijaypattepury
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

* UNLESS OTHERWISE SPECIFIED, ALL DIMENSIONS ARE IN mm

GENERAL NOTES:
1. THIS DRAWING SHOULD BE READ IN CONJUCTION
RISER-01 RISER-02 RISER-03 RISER-04 RISER-05 WITH THE DESIGN DOCUMENTATION WORK
FOR CONTINUATION REFER DWG NO: MB03-3 FOR CONTINUATION REFER DWG NO: MB03-3 FOR CONTINUATION REFER DWG NO: MB03-3 FOR CONTINUATION REFER DWG NO: MB03-3 FOR CONTINUATION REFER DWG NO: MB03-3 PACKAGE SCOPE OF WORKS, EQUINIX GLOBAL
M600 - CHILLED WATER SCHEMATIC FOR FULL M600 - CHILLED WATER SCHEMATIC FOR FULL M600 - CHILLED WATER SCHEMATIC FOR FULL M600 - CHILLED WATER SCHEMATIC FOR FULL M600 - CHILLED WATER SCHEMATIC FOR FULL
MEGACHIP 2 (ACC PLANT) MEGACHIP 2 (ACC PLANT) MEGACHIP 2 (ACC PLANT) MEGACHIP 2 (ACC PLANT) MEGACHIP 2 (ACC PLANT) DESIGN STANDARDS AND ALL OTHER SUPPORTING
T - Terrace TECHNICAL INFORMATION.
A Ø150 Ø150 Ø150 Ø150 Ø150 A
Provision
for Liquid
Provision
for Liquid
Provision
for Liquid
Provision
for Liquid
Provision
for Liquid
2. ALL PLANT AND EQUIPMENT IS TO BE INSTALLED TO
Cooling Cooling Cooling Cooling Cooling
MANUFACTURER'S RECOMMENDATIONS, ALLOWING
Failure: 173.8 L/s
Ø300
2.4 m/s
134.30 Pa/m
Normal: 139.1 L/s
Ø300
1.9 m/s
87.70 Pa/m 1 WORKING 2 WORKING 3 STANDBY
Failure: 173.8 L/s
Ø300
2.4 m/s
134.30 Pa/m
Normal: 139.1 L/s
Ø300
1.9 m/s
87.70 Pa/m 4 FUTURE 5 WORKING 6 WORKING
Failure: 173.8 L/s
Ø300
2.4 m/s
134.30 Pa/m
Normal: 139.1 L/s
Ø300
1.9 m/s
87.70 Pa/m 7 WORKING 8 FUTURE
Failure: 173.8 L/s
Ø300
2.4 m/s
134.30 Pa/m
Normal: 139.1 L/s
Ø300
1.9 m/s
87.70 Pa/m 9 STANDBY 10 WORKING 11 WORKING
Failure: 173.8 L/s
Ø300
2.4 m/s
134.30 Pa/m
Normal: 139.1 L/s
Ø300
1.9 m/s
87.70 Pa/m
FULL ACCESS FOR COMMISSIONING, MAINTENANCE
AND REMOVAL/REPLACEMENT.
Detail A Detail B Detail C Detail A Detail A Detail B Detail D Detail A
PHASE 3.3
Ø150 BFV
Flushing 7W+2S+2F 3. ANY MODIFICATION IN PIPE ROUTING / DESIGN /

BFV

BFV
BFV

BFV

BFV
BFV

BFV
BFV

BFV

BFV
Bypass BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV COORDINATION ISSUES FOUND SHALL BE BROUGHT
TO THE NOTICE OF ENGINEER & TO BE RESOLVED
Ø150 BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BEFORE EXECUTION.
Flushing
Bypass
PHASE 3.4
7W+2S+2F
Detail A Detail B DC Detail C Detail A DC Detail A DC Detail D Detail A DC 4. THE SERVICES INDICATED ON THESE DRAWINGS
Normal: 21.0 L/s 0.4 m/s Normal: 21.0 L/s 0.4 m/s Normal: 21.0 L/s 0.4 m/s Normal: 21.0 L/s 0.4 m/s Normal: 21.0 L/s 0.4 m/s
SHOW THE GENERAL DESIGN INTENT AND
1 WORKING 2 WORKING 3 STANDBY 4 FUTURE 5 WORKING 6 WORKING 7 WORKING 8 FUTURE 9 STANDBY 10 WORKING 11 WORKING
B TP TP Failure:
Ø250
24.8 L/s
6.28 Pa/m
0.5 m/s TP TP Failure:
Ø250
24.8 L/s
6.28 Pa/m
0.5 m/s TP TP Failure:
Ø250
24.8 L/s
6.28 Pa/m
0.5 m/s TP TP Failure:
Ø250
24.8 L/s
6.28 Pa/m
0.5 m/s TP TP Failure:
Ø250
24.8 L/s
6.28 Pa/m
0.5 m/s
SCHEMATIC ROUTES. THE GENERAL CONTRACTOR B
Ø250 8.44 Pa/m Ø250 8.44 Pa/m Ø250 8.44 Pa/m Ø250 8.44 Pa/m Ø250 8.44 Pa/m
TO DEVELOP SHOP DRAWINGS AND DETAILED
Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25
BV
Ø25
BV
ENGINEERING CALCULATIONS FOR EXECUTION.
BV BV BV BV
BV BV BV BV

BFV
BFV
BFV
BFV
BFV

BFV
BFV

BFV
Ø25
BV
Ø25
BV Ø25
BV
Ø25
BV
Ø25
BV
Ø25
BV
Ø25
BV
Ø25
BV
Ø25
BV
Ø25
BV DRAWING NOTES:
05 - Level 5 (Retail)
1. ALL CHILLED WATER PIPE WORK SHALL BE
Ø150 Ø150 Ø150 Ø150 Ø150
Provision Provision Provision Provision Provision
INSULATED WITH FM APPROVED CLOSED CELL
for Liquid
Cooling
for Liquid
Cooling
for Liquid
Cooling
for Liquid
Cooling
for Liquid
Cooling ELASTOMERIC INSULATION AS PER EMS2.3
Failure: 147.5 L/s 2.0 m/s Normal: 118.0 L/s 1.6 m/s Failure: 147.5 L/s 2.0 m/s Normal: 118.0 L/s 1.6 m/s Failure: 147.5 L/s 2.0 m/s Normal: 118.0 L/s 1.6 m/s Failure: 147.5 L/s 2.0 m/s Normal: 118.0 L/s 1.6 m/s Failure: 147.5 L/s 2.0 m/s Normal: 118.0 L/s 1.6 m/s
Ø300 98.20 Pa/m 1 WORKING 2 WORKING 3 STANDBY Ø300 98.20 Pa/m 4 FUTURE 5 WORKING 6 WORKING Ø300 98.20 Pa/m 7 WORKING 8 FUTURE Ø300 98.20 Pa/m 9 STANDBY 10 WORKING 11 WORKING Ø300 98.20 Pa/m
Ø300 64.16 Pa/m Ø300 64.16 Pa/m Ø300 64.16 Pa/m Ø300 64.16 Pa/m Ø300 64.16 Pa/m
2. FLUSHING BYPASS ARRANGEMENT CONSIDERED
Detail A Detail B Detail C Detail A Detail A Detail D Detail A AT THE END OF EACH FLOOR FOR FLUSHING AND
PHASE 3.3
THE CHILLED WATER SYSTEM SHALL BE FLUSHED
Ø150 BFV 7W+2S+2F
C Flushing
ON FLOOR BY FLOOR. C

BFV
BFV

BFV
BFV

BFV
BFV

BFV

BFV

BFV
BFV

Bypass BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV
BFV

Ø150 BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV
3. VALVE STEMS SHALL BE OF STAINLESS STEEL WITH
Flushing
Bypass
PHASE 3.4 EITHER 'O' RING TYPE SEALS OR NON-ASBESTOS
(7W+2S+2F) MATERIAL PACKED GLANDS.
Detail A Detail B DC Detail C Detail A DC Detail A DC Detail D Detail A DC
Normal: 19.9 L/s 0.4 m/s Normal: 19.9 L/s 0.4 m/s Normal: 19.9 L/s 0.4 m/s Normal: 19.9 L/s 0.4 m/s Normal: 19.9 L/s 0.4 m/s

Ø250 5.69 Pa/m 1 WORKING 2 WORKING 3 STANDBY Ø250 5.69 Pa/m 4 FUTURE 5 WORKING 6 WORKING Ø250 5.69 Pa/m 7 WORKING 8 FUTURE Ø250 5.69 Pa/m 9 STANDBY 10 WORKING 11 WORKING Ø250 5.69 Pa/m 4. VALVE DISC SHALL BE STAINLESS STEEL OR
TP TP Failure: 24.8 L/s 0.5 m/s TP TP Failure: 24.8 L/s 0.5 m/s TP TP Failure: 24.8 L/s 0.5 m/s TP TP Failure: 24.8 L/s 0.5 m/s TP TP Failure: 24.8 L/s 0.5 m/s
ALUMINIUM BRONZE AND GIVE TIGHT SHUT OFF
Ø250 8.44 Pa/m Ø250 8.44 Pa/m Ø250 8.44 Pa/m Ø250 8.44 Pa/m Ø250 8.44 Pa/m
AGAINST THE VALVE SEAT. VALVE MAY CONTAIN
Ø25 Ø25 Ø25 Ø25
Ø25
BV
Ø25
BV
Ø25
BV
Ø25
BV
Ø25
BV
Ø25
BV
BV BV BV BV PROPRIETARY LATEX BASED MATERIALS TO

BFV
BFV
BFV

BFV

BFV
BFV

BFV

BFV
Ø25 Ø25 Ø25 Ø25 Ø25 Ø25
Ø25 Ø25 Ø25 Ø25 ENSURE THAT A GOOD SEATING IS OBTAINED.
BV BV BV BV
BV BV BV BV BV BV WHERE USED, THE MATERIAL SHALL BE WELL
04 - Level 4 (Retail) PROVEN IN USE AND FULLY BONDED.
D Ø150
Provision
Ø150
Provision
Ø150
Provision
Ø150
Provision
Ø150
Provision D
for Liquid for Liquid for Liquid for Liquid for Liquid 5. VALVE SHALL HAVE GRADUATED INDICATOR PLATES
Cooling Cooling Cooling Cooling Cooling
TO SHOW DISC POSITION.
Failure: 122.7 L/s 1.7 m/s Normal: 98.2 L/s 1.3 m/s Failure: 122.7 L/s 1.7 m/s Normal: 98.2 L/s 1.3 m/s Failure: 122.7 L/s 1.7 m/s Normal: 98.2 L/s 1.3 m/s Failure: 122.7 L/s 1.7 m/s Normal: 98.2 L/s 1.3 m/s Failure: 122.7 L/s 1.7 m/s Normal: 98.2 L/s 1.3 m/s
Ø300 69.06 Pa/m Ø300 45.22 Pa/m 1 WORKING 2 WORKING 3 STANDBY Ø300 69.06 Pa/m Ø300 45.22 Pa/m 4 FUTURE 5 WORKING 6 WORKING Ø300 69.06 Pa/m Ø300 45.22 Pa/m 7 WORKING 8 FUTURE Ø300 69.06 Pa/m Ø300 45.22 Pa/m 9 STANDBY 10 WORKING 11 WORKING Ø300 69.06 Pa/m Ø300 45.22 Pa/m

6. GENERALLY VALVES UP TO AND INDICATING DN150


Detail A Detail B Detail C Detail A Detail A Detail D Detail A
PHASE 3.3 SHALL BE WRENCH OPERATED AND VALVES IN
Ø150 BFV
Flushing (7W+2S+2F) EXCESS OF DN150 SHALL BE GEAR OPERATED.

BFV

BFV
BFV

BFV

BFV
BFV

BFV

BFV

BFV
BFV

Bypass BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV
BFV

7. VALVES FOR REGULATING PURPOSES SHALL BE


Ø150 BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV
Flushing
PHASE 3.4
GEAR OPERATED AND LOCKABLE IN THE
Bypass
(7W+2S+2F) REGULATED POSITION.
Detail A Detail B DC Detail C Detail A DC Detail A DC Detail D Detail A DC
Normal: 17.4 L/s 0.3 m/s Normal: 17.4 L/s 0.3 m/s Normal: 17.4 L/s 0.3 m/s Normal: 17.4 L/s 0.3 m/s Normal: 17.4 L/s 0.3 m/s

Ø250 4.41 Pa/m 1 WORKING 2 WORKING 3 STANDBY Ø250 4.41 Pa/m 4 FUTURE 5 WORKING 6 WORKING Ø250 4.41 Pa/m 7 WORKING 8 FUTURE Ø250 4.41 Pa/m 9 STANDBY 10 WORKING 11 WORKING Ø250 4.41 Pa/m
8. VALVES FOR END OF LINE SERVICE AND
TP TP TP TP TP TP TP TP TP TP
EQUIPMENT ISOLATION SHALL BE FULLY LUGGED
E Failure: 21.8 L/s

Ø250
0.4 m/s

6.67 Pa/m
Failure: 21.8 L/s

Ø250
0.4 m/s

6.67 Pa/m
Failure: 21.8 L/s

Ø250
0.4 m/s

6.67 Pa/m
Failure: 21.8 L/s

Ø250
0.4 m/s

6.67 Pa/m
Failure: 21.8 L/s

Ø250
0.4 m/s

6.67 Pa/m TYPE.


E
Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25
BV BV BV BV BV BV BV BV BV BV

9. RISER FLOW RATES ARE NOTATED AS THE

BFV
BFV
BFV

BFV

BFV
BFV

BFV

BFV
Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25
BV BV BV BV BV BV BV BV BV BV
AVERAGE FLOW RATE EACH CONSECUTIVE FLOOR
03 - Level 3 (Retail) PROVIDES TO THE NUMBER OF AVAILABLE RISERS.
Ø150 Ø150 Ø150 Ø150 Ø150
IN NORMAL OPERATION ALL RISERS ARE AVAILABLE
Provision
for Liquid
Provision
for Liquid
Provision
for Liquid
Provision
for Liquid
Provision
for Liquid
AND FAILURE OPERATION ACCOUNTS FOR THE
Cooling Cooling Cooling Cooling Cooling
LOSS OF ONE RISER.
Failure: 101.0 L/s 1.4 m/s Normal: 80.8 L/s 1.1 m/s Failure: 101.0 L/s 1.4 m/s Normal: 80.8 L/s 1.1 m/s Failure: 101.0 L/s 1.4 m/s Normal: 80.8 L/s 1.1 m/s Failure: 101.0 L/s 1.4 m/s Normal: 80.8 L/s 1.1 m/s Failure: 101.0 L/s 1.4 m/s Normal: 80.8 L/s 1.1 m/s
Ø300 47.68 Pa/m Ø300 31.29 Pa/m 1 WORKING 2 WORKING 3 STANDBY Ø300 47.68 Pa/m Ø300 31.29 Pa/m 4 WORKING 5 WORKING 6 FUTURE Ø300 47.68 Pa/m Ø300 31.29 Pa/m 7 WORKING 8 WORKING Ø300 47.68 Pa/m Ø300 31.29 Pa/m 9 STANDBY 10 WORKING 11 WORKING Ø300 47.68 Pa/m Ø300 31.29 Pa/m
10. THE FLOW RATES OF RISERS INCLUDE SCALABLE IT
Detail A Detail B Detail C Detail A Detail A Detail D Detail A
PHASE 3.3 CAPACITY, BUT THIS CAPACITY IS NOT ACCOUNTED
Ø150 BFV
Flushing
(8W+2S+1F) FOR AT THE DATA HALL HEADER LEVEL. ONCE

BFV

BFV
BFV
BFV
BFV

BFV

BFV

BFV
BFV

BFV
Bypass BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV CONFIRMATION OF THE SCALABLE IT LOAD DETAILS
F BFV

IS RECEIVED, THE FLOW RATE WILL BE F


Ø150 BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV APPROPRIATELY DISTRIBUTED.
Flushing
Bypass PHASE 3.4
Normal: 29.6 L/s 0.6 m/s
Detail A Detail E Detail E Detail B Detail B DC Detail C Detail A DC Detail A DC Detail D Detail A DC
(8W+2S+1F) 11. ISOLATION VALVES MUST BE WITHIN A DISTANCE OF
TP TP Ø250 11.77 Pa/m TP TP TP TP TP TP TP TP

Failure: 0.7 m/s


Normal: 29.6 L/s 0.6 m/s Normal: 29.6 L/s 0.6 m/s 3Ø OF THE NEAREST BRANCH (i.e. IF THE VALVE IS
37.0 L/s Normal: 29.6 L/s 0.6 m/s Normal: 29.6 L/s 0.6 m/s
1 WORKING 2 WORKING 3 STANDBY 4 WORKING 5 WORKING 6 FUTURE 7 WORKING 8 WORKING 9 STANDBY 10 WORKING 11 WORKING
100MM IN DIAMETER, IT SHOULD NOT BE MORE
BFV

BFV

BFV

BFV

BFV
BFV

BFV

BFV

BFV

BFV
Ø250 11.77 Pa/m Ø250 11.77 Pa/m
Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25
Ø250 17.76 Pa/m Ø250 11.77 Pa/m
BV BV BV BV Failure: 37.0 L/s 0.7 m/s BV BV Failure: 37.0 L/s 0.7 m/s BV BV BV BV Ø250 11.77 Pa/m
Failure: 37.0 L/s 0.7 m/s Failure: 37.0 L/s 0.7 m/s
THAN 300MM FROM THE BRANCH). THIS IS TO
Ø250 17.76 Pa/m Ø250 17.76 Pa/m
Detail H

Detail H

Detail H

Detail H

Detail H
Ø250 17.76 Pa/m Ø250 17.76 Pa/m ALLOW FOR CIRCULATION OF WATER IN THE PIPE
DP DP DP DP DP

Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25


WHEN THE VALVE IS CLOSED, ANY MORE THAN 3Ø
Ø25 Ø25
BV BV BV BV BV BV BV BV OF THE VALVE DIAMETER AND WATER WOULD
STAGNANT IN THE PIPE.
02 - Level 2 (Hybrid)
12. FLOW METER MUST HAVE A MINIMUM OF 10Ø
G UPSTREAM RELATIVE TO THE INSTRUMENT AND A G
MINIMUM DISTANCE OF 5Ø DOWNSTREAM (I.E THE
PIPE IS 250Ø, SO PIPE BEFORE THE METER NEEDS
1CDU_QR3_01 1CDU_QR3_02
Detail G
Ø100 CHW S/R
Detail G 1CDU_QR3_03 1CDU_QR3_04 1CDU_QR3_05 1CDU_QR3_06 1CDU_QR3_07 1CDU_QR3_08 1CDU_QR3_09 1CDU_QR3_10 1CDU_QR3_11 1CDU_QR3_12 1CDU_QR3_13 1CDU_QR3_14
TO BE A MINIMUM LENGTH OF 2500MM).
CDU CDU 27.3 L/s 1.47 m/s CDU CDU CDU CDU 27.3 L/s 1.47 m/s CDU CDU CDU CDU 71.76 L/s 2.2 m/s CDU CDU CDU CDU
Ø150 125.5 Pa/m Ø150 125.5 Pa/m Ø200 192.2 Pa/m 13. LEAK DETECTION IS REQUIRED UNDER ALL COILS
WITHIN THE COOL ARRAY.
Ø80 mm
Normal: 19.1 L/s 1.02 m/s
Bypass (typ) Normal: 19.1 L/s 1.02 m/s Normal: 19.1 L/s 1.02 m/s Normal: 19.1 L/s 1.02 m/s Normal: 19.1 L/s 1.02 m/s

Ø150 62 Pa/m
Normal: 51.2 L/s
Ø300
0.7 m/s
13.34 Pa/m
Ø150 62 Pa/m Ø150 62 Pa/m Ø150 62 Pa/m
Ø150 62 Pa/m
DC
14. ALL MANUAL ISOLATION BUTTERFLY VALVES MUST
Failure: 23.9 L/s 1.28 m/s
Failure: 23.9 L/s 1.28 m/s
DC
Failure: 23.9 L/s 1.28 m/s
DC
Failure: 23.9 L/s 1.28 m/s
DC
Failure: 23.9 L/s 1.28 m/s
BE RESILIENT SEAT TYPE VALVES EQUIVALENT .
Y-ST Failure: 64.0 L/s 0.9 m/s Y-ST Y-ST Ø150 94.24 Pa/m
Ø150 94.24 Pa/m Ø150 94.24 Pa/m Ø150 94.24 Pa/m Ø150 94.24 Pa/m
Ø300 20.21 Pa/m
Failure: 64.0 L/s 0.9 m/s Normal: 51.2 L/s 0.7 m/s Y-ST
1 WORKING 2 WORKING 3 STANDBY 4 WORKING 5 WORKING 6 WORKING 51.2 L/s
7 WORKING 8 WORKING 9 STANDBY 10 WORKING 11 WORKING Y-ST
15. ALL MOTORIZED VALVE MUST BE HIGH
Ø300 20.21 Pa/m Ø300 13.34 Pa/m Failure: 64.0 L/s 0.9 m/s Normal: 0.7 m/s 51.2 L/s Failure: 64.0 L/s 0.9 m/s Normal: 51.2 L/s 0.7 m/s
Failure: 64.0 L/s 0.9 m/s Normal: 0.7 m/s
Ø300 20.21 Pa/m Ø300 13.34 Pa/m Ø300 20.21 Pa/m Ø300 13.34 Pa/m Ø300 20.21 Pa/m Ø300 13.34 Pa/m
PERFORMANCE BUTTERFLY VALVES.
H Detail A Detail B Detail C Detail A Detail A Detail D Detail A
PHASE 3.3 H
Ø150 BFV
Flushing
(11W) 16. ALL CRITICAL EQUIPMENT (CRAHS, CRAYS, MAUS,

BFV

BFV
BFV
BFV
BFV

BFV

BFV
BFV

BFV

BFV
Bypass BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV
BFV
ETC) SHOULD BE BALANCED TO ZERO PLUS 5% TO
BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV
ENSURE DESIGN AIRFLOW.
Ø150 BFV BFV BFV
Flushing
Bypass
PHASE 3.4 17. ALL CHILLED WATER FLOW RATES SHOULD BE
Detail A Detail B DC Detail C Detail A DC Detail A DC Detail D Detail A DC (10W+1S) BALANCED TO ZERO PLUS 5%.
1 WORKING 2 WORKING 3 STANDBY 4 WORKING 5 WORKING 6 WORKING 7 WORKING 8 WORKING 9 STANDBY 10 WORKING 11 WORKING
18. A POWER PROVISION FOR TEMPORARY
Normal: 51.2 L/s 1.0 m/s Normal: 51.2 L/s 1.0 m/s Normal: 51.2 L/s 1.0 m/s Normal: 51.2 L/s 1.0 m/s Normal: 51.2 L/s 1.0 m/s DEHUMIDIFIERS HAS BEEN CONSIDERED, THIS
Failure:
Ø250 32.57 Pa/m
1.3 m/s Failure:
Ø250 32.57 Pa/m
1.3 m/s Failure:
Ø250 32.57 Pa/m
1.3 m/s
Ø250 32.57 Pa/m Ø250 32.57 Pa/m MIGHT BE REQUIRED FOR THE INITIAL OPERATION
64.0 L/s 64.0 L/s 64.0 L/s Failure: 64.0 L/s 1.3 m/s
Failure: 1.3 m/s

Typical Ø250 49.54 Pa/m Typical Ø250 49.54 Pa/m Typical Ø250 49.54 Pa/m Typical Ø250 49.54 Pa/m Typical
64.0 L/s
OF DATA HALL. THESE WILL BE INSTALLED, ONLY IF
Ø250 49.54 Pa/m
Detail F Detail E Detail E Detail E Detail E THE DATA HALL HUMIDITY LEVEL WAS NOT
J 01 - Level 1 (LFP)
RISER-01 (S168) RISER-02 (S165) RISER-03 (S163) RISER-04 (S161) RISER-05 (S158) MAINTAINED WITHIN THE SLA LIMITS. AS PER THE J
GRID NO: J-H TO 24-25 GRID NO: J-H TO 21-22 GRID NO: J-H TO 19-20 GRID NO: J-H TO 18-19 GRID NO: J-H TO 16-17
CALCULATION 5 NOS OF DEHUMIDIFIERS ARE
REQUIRED.

19. DRAIN COCK ON THE HEADER SHALL BE Ø40 mm.

0M - MEZZANINE FLOOR
20. DRAIN COCK ON THE CDU HEADER SHALL BE Ø25
mm.

21. ALL THE END TERMINATION (INCLUDING TAP OFFS)


MUST BE PROVIDED WITH END FLANGE.

00 - Level 0 (Utility Floor)


K PHASING LEGEND: K
PHASE MB3.3 NON-HIGHLIGHTED

Ø40, 3.63 l/s (TYP.) Ø40, 3.63 l/s (TYP.) Ø40, 3.63 l/s (TYP.) Ø40, 3.63 l/s (TYP.) PHASE MB3.4

IV IV IV IV IV IV IV IV IV IV IV IV IV IV IV IV IV IV IV IV IV IV
SCALABLE
IV Y-ST IV Y-ST IV Y-ST IV Y-ST IV Y-ST IV Y-ST IV Y-ST IV Y-ST IV Y-ST IV Y-ST IV Y-ST IV Y-ST IV Y-ST IV Y-ST IV Y-ST IV Y-ST IV Y-ST IV Y-ST IV Y-ST IV Y-ST IV Y-ST IV Y-ST

FC FC FC FC FC FC FC FC FC FC FC FC FC FC FC FC FC FC FC FC FC FC FC FC FC FC FC FC FC FC
1 RIBA 4 ADDENDUM 20/12/24 SK PRK

SK
1
RIBA 4 ADDENDUM 20/12/24 PRK

0 RIBA 4 APPROVAL 16/10/24 SK PRK


Spare Spare Spare Rev No Description Date Drawn Checked
Ø80 Temporary connections Spare Ø80 Temporary connections Ø80 Temporary connections
Supplied by contractor Supplied by contractor Supplied by contractor Supplied by contractor
/ liquid cooled server future / liquid cooled server future / liquid cooled server future
L connections connections connections
L
Supplied by cool array ePIV ePIV ePIV ePIV ePIV ePIV Supplied by cool array ePIV ePIV ePIV Supplied by cool array ePIV ePIV ePIV Supplied by cool array ePIV ePIV ePIV
manufacturer manufacturer manufacturer manufacturer
Drawing Status

RIBA 4 ADDENDUM
TP

TP

TP

TP

TP

TP

TP

TP

TP

TP

TP

TP

TP

TP

TP
TP

TP

TP

TP

TP

TP

TP

TP

TP

TP

TP

TP

TP

TP

TP
Air Vent and Air Vent and Air Vent and Air Vent and Client
Drain Point Drain Point Drain Point Drain Point
required on Coil required on Coil required on Coil required on Coil
as part of DC DC DC DC DC DC as part of DC DC DC as part of DC DC DC as part of DC DC DC
T T T T T T T T T T T T T T T
instilation instilation instilation instilation
requirememnts requirememnts requirememnts requirememnts

Detail A Detail B Detail C Detail D


M Cool Array Module Cool Array Module Cool Array Module Cool Array Module Lead Design Consultant M
NV5 Mission Critical
MISSION Office No:611, Corporate Annexe,
Sonawala Road, Goregaon East,
CRITICAL Mumbai, India 400063
Tel: (91) 22 4266 1860

Architect
Ø300
Ø300
AWP Pte Ltd
Reducer Reducer 143 Cecil Street
Reducer Reducer Corrosion coupon
#12-00 GB Building, (S) 069542
rack to be included at
the bottom of a
W: awparchitects.com
IV IV
T 6337 6777 ; F 6339 6956
N IV IV
single riser only.
Final location and
Note: Differential Pressure
Sensor to be selected by
N
design details, Line size to suit DPS
Ø150 including the physical
BMS Contractor
Project Title
arrangement and DP
Ø150
number of coupons Approximate
required, to be 8mm/Microbore
Ø25 riser minimum
flow bypass
connection
developed on a
project basis
Supplied
by
IV IV
EQUINIX MB03-3
contractor
TP TP
Supplied by FC FC
Equinix
IV IV
Flanged Flanged Customer
Drawing Title
connection for connection for
Ø150 flushing Ø150 flushing Ø25
Blanking connection Temporary Ø150 bypass temporary DC DC bypass temporary
CDU
Flow
with Ø150 flanged
connection
Flush Bypass with
Ø150 flanged Return
CHILLED WATER SCHEMATIC
connection
FOR FULL MEGACHIP2
P P
Detail E Detail F
Corrosion Coupon
Detail G
Coolant Distribution Unit
Detail H (WHITE SPACE)
Differential Pressure Transducer Arrangement

Job No Scale

862224-0002398.00 NTS @ A0

Drawing Number Revision

M601 1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

You might also like