MB03-3 M601 DD - Chilled Water Schematic For Full MegaCHlP2 (White Space) (Rev 1) 1
MB03-3 M601 DD - Chilled Water Schematic For Full MegaCHlP2 (White Space) (Rev 1) 1
GENERAL NOTES:
1. THIS DRAWING SHOULD BE READ IN CONJUCTION
RISER-01 RISER-02 RISER-03 RISER-04 RISER-05 WITH THE DESIGN DOCUMENTATION WORK
FOR CONTINUATION REFER DWG NO: MB03-3 FOR CONTINUATION REFER DWG NO: MB03-3 FOR CONTINUATION REFER DWG NO: MB03-3 FOR CONTINUATION REFER DWG NO: MB03-3 FOR CONTINUATION REFER DWG NO: MB03-3 PACKAGE SCOPE OF WORKS, EQUINIX GLOBAL
M600 - CHILLED WATER SCHEMATIC FOR FULL M600 - CHILLED WATER SCHEMATIC FOR FULL M600 - CHILLED WATER SCHEMATIC FOR FULL M600 - CHILLED WATER SCHEMATIC FOR FULL M600 - CHILLED WATER SCHEMATIC FOR FULL
MEGACHIP 2 (ACC PLANT) MEGACHIP 2 (ACC PLANT) MEGACHIP 2 (ACC PLANT) MEGACHIP 2 (ACC PLANT) MEGACHIP 2 (ACC PLANT) DESIGN STANDARDS AND ALL OTHER SUPPORTING
T - Terrace TECHNICAL INFORMATION.
A Ø150 Ø150 Ø150 Ø150 Ø150 A
Provision
for Liquid
Provision
for Liquid
Provision
for Liquid
Provision
for Liquid
Provision
for Liquid
2. ALL PLANT AND EQUIPMENT IS TO BE INSTALLED TO
Cooling Cooling Cooling Cooling Cooling
MANUFACTURER'S RECOMMENDATIONS, ALLOWING
Failure: 173.8 L/s
Ø300
2.4 m/s
134.30 Pa/m
Normal: 139.1 L/s
Ø300
1.9 m/s
87.70 Pa/m 1 WORKING 2 WORKING 3 STANDBY
Failure: 173.8 L/s
Ø300
2.4 m/s
134.30 Pa/m
Normal: 139.1 L/s
Ø300
1.9 m/s
87.70 Pa/m 4 FUTURE 5 WORKING 6 WORKING
Failure: 173.8 L/s
Ø300
2.4 m/s
134.30 Pa/m
Normal: 139.1 L/s
Ø300
1.9 m/s
87.70 Pa/m 7 WORKING 8 FUTURE
Failure: 173.8 L/s
Ø300
2.4 m/s
134.30 Pa/m
Normal: 139.1 L/s
Ø300
1.9 m/s
87.70 Pa/m 9 STANDBY 10 WORKING 11 WORKING
Failure: 173.8 L/s
Ø300
2.4 m/s
134.30 Pa/m
Normal: 139.1 L/s
Ø300
1.9 m/s
87.70 Pa/m
FULL ACCESS FOR COMMISSIONING, MAINTENANCE
AND REMOVAL/REPLACEMENT.
Detail A Detail B Detail C Detail A Detail A Detail B Detail D Detail A
PHASE 3.3
Ø150 BFV
Flushing 7W+2S+2F 3. ANY MODIFICATION IN PIPE ROUTING / DESIGN /
BFV
BFV
BFV
BFV
BFV
BFV
BFV
BFV
BFV
BFV
Bypass BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV COORDINATION ISSUES FOUND SHALL BE BROUGHT
TO THE NOTICE OF ENGINEER & TO BE RESOLVED
Ø150 BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BEFORE EXECUTION.
Flushing
Bypass
PHASE 3.4
7W+2S+2F
Detail A Detail B DC Detail C Detail A DC Detail A DC Detail D Detail A DC 4. THE SERVICES INDICATED ON THESE DRAWINGS
Normal: 21.0 L/s 0.4 m/s Normal: 21.0 L/s 0.4 m/s Normal: 21.0 L/s 0.4 m/s Normal: 21.0 L/s 0.4 m/s Normal: 21.0 L/s 0.4 m/s
SHOW THE GENERAL DESIGN INTENT AND
1 WORKING 2 WORKING 3 STANDBY 4 FUTURE 5 WORKING 6 WORKING 7 WORKING 8 FUTURE 9 STANDBY 10 WORKING 11 WORKING
B TP TP Failure:
Ø250
24.8 L/s
6.28 Pa/m
0.5 m/s TP TP Failure:
Ø250
24.8 L/s
6.28 Pa/m
0.5 m/s TP TP Failure:
Ø250
24.8 L/s
6.28 Pa/m
0.5 m/s TP TP Failure:
Ø250
24.8 L/s
6.28 Pa/m
0.5 m/s TP TP Failure:
Ø250
24.8 L/s
6.28 Pa/m
0.5 m/s
SCHEMATIC ROUTES. THE GENERAL CONTRACTOR B
Ø250 8.44 Pa/m Ø250 8.44 Pa/m Ø250 8.44 Pa/m Ø250 8.44 Pa/m Ø250 8.44 Pa/m
TO DEVELOP SHOP DRAWINGS AND DETAILED
Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25
BV
Ø25
BV
ENGINEERING CALCULATIONS FOR EXECUTION.
BV BV BV BV
BV BV BV BV
BFV
BFV
BFV
BFV
BFV
BFV
BFV
BFV
Ø25
BV
Ø25
BV Ø25
BV
Ø25
BV
Ø25
BV
Ø25
BV
Ø25
BV
Ø25
BV
Ø25
BV
Ø25
BV DRAWING NOTES:
05 - Level 5 (Retail)
1. ALL CHILLED WATER PIPE WORK SHALL BE
Ø150 Ø150 Ø150 Ø150 Ø150
Provision Provision Provision Provision Provision
INSULATED WITH FM APPROVED CLOSED CELL
for Liquid
Cooling
for Liquid
Cooling
for Liquid
Cooling
for Liquid
Cooling
for Liquid
Cooling ELASTOMERIC INSULATION AS PER EMS2.3
Failure: 147.5 L/s 2.0 m/s Normal: 118.0 L/s 1.6 m/s Failure: 147.5 L/s 2.0 m/s Normal: 118.0 L/s 1.6 m/s Failure: 147.5 L/s 2.0 m/s Normal: 118.0 L/s 1.6 m/s Failure: 147.5 L/s 2.0 m/s Normal: 118.0 L/s 1.6 m/s Failure: 147.5 L/s 2.0 m/s Normal: 118.0 L/s 1.6 m/s
Ø300 98.20 Pa/m 1 WORKING 2 WORKING 3 STANDBY Ø300 98.20 Pa/m 4 FUTURE 5 WORKING 6 WORKING Ø300 98.20 Pa/m 7 WORKING 8 FUTURE Ø300 98.20 Pa/m 9 STANDBY 10 WORKING 11 WORKING Ø300 98.20 Pa/m
Ø300 64.16 Pa/m Ø300 64.16 Pa/m Ø300 64.16 Pa/m Ø300 64.16 Pa/m Ø300 64.16 Pa/m
2. FLUSHING BYPASS ARRANGEMENT CONSIDERED
Detail A Detail B Detail C Detail A Detail A Detail D Detail A AT THE END OF EACH FLOOR FOR FLUSHING AND
PHASE 3.3
THE CHILLED WATER SYSTEM SHALL BE FLUSHED
Ø150 BFV 7W+2S+2F
C Flushing
ON FLOOR BY FLOOR. C
BFV
BFV
BFV
BFV
BFV
BFV
BFV
BFV
BFV
BFV
Bypass BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV
BFV
Ø150 BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV
3. VALVE STEMS SHALL BE OF STAINLESS STEEL WITH
Flushing
Bypass
PHASE 3.4 EITHER 'O' RING TYPE SEALS OR NON-ASBESTOS
(7W+2S+2F) MATERIAL PACKED GLANDS.
Detail A Detail B DC Detail C Detail A DC Detail A DC Detail D Detail A DC
Normal: 19.9 L/s 0.4 m/s Normal: 19.9 L/s 0.4 m/s Normal: 19.9 L/s 0.4 m/s Normal: 19.9 L/s 0.4 m/s Normal: 19.9 L/s 0.4 m/s
Ø250 5.69 Pa/m 1 WORKING 2 WORKING 3 STANDBY Ø250 5.69 Pa/m 4 FUTURE 5 WORKING 6 WORKING Ø250 5.69 Pa/m 7 WORKING 8 FUTURE Ø250 5.69 Pa/m 9 STANDBY 10 WORKING 11 WORKING Ø250 5.69 Pa/m 4. VALVE DISC SHALL BE STAINLESS STEEL OR
TP TP Failure: 24.8 L/s 0.5 m/s TP TP Failure: 24.8 L/s 0.5 m/s TP TP Failure: 24.8 L/s 0.5 m/s TP TP Failure: 24.8 L/s 0.5 m/s TP TP Failure: 24.8 L/s 0.5 m/s
ALUMINIUM BRONZE AND GIVE TIGHT SHUT OFF
Ø250 8.44 Pa/m Ø250 8.44 Pa/m Ø250 8.44 Pa/m Ø250 8.44 Pa/m Ø250 8.44 Pa/m
AGAINST THE VALVE SEAT. VALVE MAY CONTAIN
Ø25 Ø25 Ø25 Ø25
Ø25
BV
Ø25
BV
Ø25
BV
Ø25
BV
Ø25
BV
Ø25
BV
BV BV BV BV PROPRIETARY LATEX BASED MATERIALS TO
BFV
BFV
BFV
BFV
BFV
BFV
BFV
BFV
Ø25 Ø25 Ø25 Ø25 Ø25 Ø25
Ø25 Ø25 Ø25 Ø25 ENSURE THAT A GOOD SEATING IS OBTAINED.
BV BV BV BV
BV BV BV BV BV BV WHERE USED, THE MATERIAL SHALL BE WELL
04 - Level 4 (Retail) PROVEN IN USE AND FULLY BONDED.
D Ø150
Provision
Ø150
Provision
Ø150
Provision
Ø150
Provision
Ø150
Provision D
for Liquid for Liquid for Liquid for Liquid for Liquid 5. VALVE SHALL HAVE GRADUATED INDICATOR PLATES
Cooling Cooling Cooling Cooling Cooling
TO SHOW DISC POSITION.
Failure: 122.7 L/s 1.7 m/s Normal: 98.2 L/s 1.3 m/s Failure: 122.7 L/s 1.7 m/s Normal: 98.2 L/s 1.3 m/s Failure: 122.7 L/s 1.7 m/s Normal: 98.2 L/s 1.3 m/s Failure: 122.7 L/s 1.7 m/s Normal: 98.2 L/s 1.3 m/s Failure: 122.7 L/s 1.7 m/s Normal: 98.2 L/s 1.3 m/s
Ø300 69.06 Pa/m Ø300 45.22 Pa/m 1 WORKING 2 WORKING 3 STANDBY Ø300 69.06 Pa/m Ø300 45.22 Pa/m 4 FUTURE 5 WORKING 6 WORKING Ø300 69.06 Pa/m Ø300 45.22 Pa/m 7 WORKING 8 FUTURE Ø300 69.06 Pa/m Ø300 45.22 Pa/m 9 STANDBY 10 WORKING 11 WORKING Ø300 69.06 Pa/m Ø300 45.22 Pa/m
BFV
BFV
BFV
BFV
BFV
BFV
BFV
BFV
BFV
BFV
Bypass BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV
BFV
Ø250 4.41 Pa/m 1 WORKING 2 WORKING 3 STANDBY Ø250 4.41 Pa/m 4 FUTURE 5 WORKING 6 WORKING Ø250 4.41 Pa/m 7 WORKING 8 FUTURE Ø250 4.41 Pa/m 9 STANDBY 10 WORKING 11 WORKING Ø250 4.41 Pa/m
8. VALVES FOR END OF LINE SERVICE AND
TP TP TP TP TP TP TP TP TP TP
EQUIPMENT ISOLATION SHALL BE FULLY LUGGED
E Failure: 21.8 L/s
Ø250
0.4 m/s
6.67 Pa/m
Failure: 21.8 L/s
Ø250
0.4 m/s
6.67 Pa/m
Failure: 21.8 L/s
Ø250
0.4 m/s
6.67 Pa/m
Failure: 21.8 L/s
Ø250
0.4 m/s
6.67 Pa/m
Failure: 21.8 L/s
Ø250
0.4 m/s
BFV
BFV
BFV
BFV
BFV
BFV
BFV
BFV
Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25
BV BV BV BV BV BV BV BV BV BV
AVERAGE FLOW RATE EACH CONSECUTIVE FLOOR
03 - Level 3 (Retail) PROVIDES TO THE NUMBER OF AVAILABLE RISERS.
Ø150 Ø150 Ø150 Ø150 Ø150
IN NORMAL OPERATION ALL RISERS ARE AVAILABLE
Provision
for Liquid
Provision
for Liquid
Provision
for Liquid
Provision
for Liquid
Provision
for Liquid
AND FAILURE OPERATION ACCOUNTS FOR THE
Cooling Cooling Cooling Cooling Cooling
LOSS OF ONE RISER.
Failure: 101.0 L/s 1.4 m/s Normal: 80.8 L/s 1.1 m/s Failure: 101.0 L/s 1.4 m/s Normal: 80.8 L/s 1.1 m/s Failure: 101.0 L/s 1.4 m/s Normal: 80.8 L/s 1.1 m/s Failure: 101.0 L/s 1.4 m/s Normal: 80.8 L/s 1.1 m/s Failure: 101.0 L/s 1.4 m/s Normal: 80.8 L/s 1.1 m/s
Ø300 47.68 Pa/m Ø300 31.29 Pa/m 1 WORKING 2 WORKING 3 STANDBY Ø300 47.68 Pa/m Ø300 31.29 Pa/m 4 WORKING 5 WORKING 6 FUTURE Ø300 47.68 Pa/m Ø300 31.29 Pa/m 7 WORKING 8 WORKING Ø300 47.68 Pa/m Ø300 31.29 Pa/m 9 STANDBY 10 WORKING 11 WORKING Ø300 47.68 Pa/m Ø300 31.29 Pa/m
10. THE FLOW RATES OF RISERS INCLUDE SCALABLE IT
Detail A Detail B Detail C Detail A Detail A Detail D Detail A
PHASE 3.3 CAPACITY, BUT THIS CAPACITY IS NOT ACCOUNTED
Ø150 BFV
Flushing
(8W+2S+1F) FOR AT THE DATA HALL HEADER LEVEL. ONCE
BFV
BFV
BFV
BFV
BFV
BFV
BFV
BFV
BFV
BFV
Bypass BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV CONFIRMATION OF THE SCALABLE IT LOAD DETAILS
F BFV
BFV
BFV
BFV
BFV
BFV
BFV
BFV
BFV
BFV
Ø250 11.77 Pa/m Ø250 11.77 Pa/m
Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25
Ø250 17.76 Pa/m Ø250 11.77 Pa/m
BV BV BV BV Failure: 37.0 L/s 0.7 m/s BV BV Failure: 37.0 L/s 0.7 m/s BV BV BV BV Ø250 11.77 Pa/m
Failure: 37.0 L/s 0.7 m/s Failure: 37.0 L/s 0.7 m/s
THAN 300MM FROM THE BRANCH). THIS IS TO
Ø250 17.76 Pa/m Ø250 17.76 Pa/m
Detail H
Detail H
Detail H
Detail H
Detail H
Ø250 17.76 Pa/m Ø250 17.76 Pa/m ALLOW FOR CIRCULATION OF WATER IN THE PIPE
DP DP DP DP DP
Ø150 62 Pa/m
Normal: 51.2 L/s
Ø300
0.7 m/s
13.34 Pa/m
Ø150 62 Pa/m Ø150 62 Pa/m Ø150 62 Pa/m
Ø150 62 Pa/m
DC
14. ALL MANUAL ISOLATION BUTTERFLY VALVES MUST
Failure: 23.9 L/s 1.28 m/s
Failure: 23.9 L/s 1.28 m/s
DC
Failure: 23.9 L/s 1.28 m/s
DC
Failure: 23.9 L/s 1.28 m/s
DC
Failure: 23.9 L/s 1.28 m/s
BE RESILIENT SEAT TYPE VALVES EQUIVALENT .
Y-ST Failure: 64.0 L/s 0.9 m/s Y-ST Y-ST Ø150 94.24 Pa/m
Ø150 94.24 Pa/m Ø150 94.24 Pa/m Ø150 94.24 Pa/m Ø150 94.24 Pa/m
Ø300 20.21 Pa/m
Failure: 64.0 L/s 0.9 m/s Normal: 51.2 L/s 0.7 m/s Y-ST
1 WORKING 2 WORKING 3 STANDBY 4 WORKING 5 WORKING 6 WORKING 51.2 L/s
7 WORKING 8 WORKING 9 STANDBY 10 WORKING 11 WORKING Y-ST
15. ALL MOTORIZED VALVE MUST BE HIGH
Ø300 20.21 Pa/m Ø300 13.34 Pa/m Failure: 64.0 L/s 0.9 m/s Normal: 0.7 m/s 51.2 L/s Failure: 64.0 L/s 0.9 m/s Normal: 51.2 L/s 0.7 m/s
Failure: 64.0 L/s 0.9 m/s Normal: 0.7 m/s
Ø300 20.21 Pa/m Ø300 13.34 Pa/m Ø300 20.21 Pa/m Ø300 13.34 Pa/m Ø300 20.21 Pa/m Ø300 13.34 Pa/m
PERFORMANCE BUTTERFLY VALVES.
H Detail A Detail B Detail C Detail A Detail A Detail D Detail A
PHASE 3.3 H
Ø150 BFV
Flushing
(11W) 16. ALL CRITICAL EQUIPMENT (CRAHS, CRAYS, MAUS,
BFV
BFV
BFV
BFV
BFV
BFV
BFV
BFV
BFV
BFV
Bypass BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV
BFV
ETC) SHOULD BE BALANCED TO ZERO PLUS 5% TO
BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV
ENSURE DESIGN AIRFLOW.
Ø150 BFV BFV BFV
Flushing
Bypass
PHASE 3.4 17. ALL CHILLED WATER FLOW RATES SHOULD BE
Detail A Detail B DC Detail C Detail A DC Detail A DC Detail D Detail A DC (10W+1S) BALANCED TO ZERO PLUS 5%.
1 WORKING 2 WORKING 3 STANDBY 4 WORKING 5 WORKING 6 WORKING 7 WORKING 8 WORKING 9 STANDBY 10 WORKING 11 WORKING
18. A POWER PROVISION FOR TEMPORARY
Normal: 51.2 L/s 1.0 m/s Normal: 51.2 L/s 1.0 m/s Normal: 51.2 L/s 1.0 m/s Normal: 51.2 L/s 1.0 m/s Normal: 51.2 L/s 1.0 m/s DEHUMIDIFIERS HAS BEEN CONSIDERED, THIS
Failure:
Ø250 32.57 Pa/m
1.3 m/s Failure:
Ø250 32.57 Pa/m
1.3 m/s Failure:
Ø250 32.57 Pa/m
1.3 m/s
Ø250 32.57 Pa/m Ø250 32.57 Pa/m MIGHT BE REQUIRED FOR THE INITIAL OPERATION
64.0 L/s 64.0 L/s 64.0 L/s Failure: 64.0 L/s 1.3 m/s
Failure: 1.3 m/s
Typical Ø250 49.54 Pa/m Typical Ø250 49.54 Pa/m Typical Ø250 49.54 Pa/m Typical Ø250 49.54 Pa/m Typical
64.0 L/s
OF DATA HALL. THESE WILL BE INSTALLED, ONLY IF
Ø250 49.54 Pa/m
Detail F Detail E Detail E Detail E Detail E THE DATA HALL HUMIDITY LEVEL WAS NOT
J 01 - Level 1 (LFP)
RISER-01 (S168) RISER-02 (S165) RISER-03 (S163) RISER-04 (S161) RISER-05 (S158) MAINTAINED WITHIN THE SLA LIMITS. AS PER THE J
GRID NO: J-H TO 24-25 GRID NO: J-H TO 21-22 GRID NO: J-H TO 19-20 GRID NO: J-H TO 18-19 GRID NO: J-H TO 16-17
CALCULATION 5 NOS OF DEHUMIDIFIERS ARE
REQUIRED.
0M - MEZZANINE FLOOR
20. DRAIN COCK ON THE CDU HEADER SHALL BE Ø25
mm.
Ø40, 3.63 l/s (TYP.) Ø40, 3.63 l/s (TYP.) Ø40, 3.63 l/s (TYP.) Ø40, 3.63 l/s (TYP.) PHASE MB3.4
IV IV IV IV IV IV IV IV IV IV IV IV IV IV IV IV IV IV IV IV IV IV
SCALABLE
IV Y-ST IV Y-ST IV Y-ST IV Y-ST IV Y-ST IV Y-ST IV Y-ST IV Y-ST IV Y-ST IV Y-ST IV Y-ST IV Y-ST IV Y-ST IV Y-ST IV Y-ST IV Y-ST IV Y-ST IV Y-ST IV Y-ST IV Y-ST IV Y-ST IV Y-ST
FC FC FC FC FC FC FC FC FC FC FC FC FC FC FC FC FC FC FC FC FC FC FC FC FC FC FC FC FC FC
1 RIBA 4 ADDENDUM 20/12/24 SK PRK
SK
1
RIBA 4 ADDENDUM 20/12/24 PRK
RIBA 4 ADDENDUM
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
Air Vent and Air Vent and Air Vent and Air Vent and Client
Drain Point Drain Point Drain Point Drain Point
required on Coil required on Coil required on Coil required on Coil
as part of DC DC DC DC DC DC as part of DC DC DC as part of DC DC DC as part of DC DC DC
T T T T T T T T T T T T T T T
instilation instilation instilation instilation
requirememnts requirememnts requirememnts requirememnts
Architect
Ø300
Ø300
AWP Pte Ltd
Reducer Reducer 143 Cecil Street
Reducer Reducer Corrosion coupon
#12-00 GB Building, (S) 069542
rack to be included at
the bottom of a
W: awparchitects.com
IV IV
T 6337 6777 ; F 6339 6956
N IV IV
single riser only.
Final location and
Note: Differential Pressure
Sensor to be selected by
N
design details, Line size to suit DPS
Ø150 including the physical
BMS Contractor
Project Title
arrangement and DP
Ø150
number of coupons Approximate
required, to be 8mm/Microbore
Ø25 riser minimum
flow bypass
connection
developed on a
project basis
Supplied
by
IV IV
EQUINIX MB03-3
contractor
TP TP
Supplied by FC FC
Equinix
IV IV
Flanged Flanged Customer
Drawing Title
connection for connection for
Ø150 flushing Ø150 flushing Ø25
Blanking connection Temporary Ø150 bypass temporary DC DC bypass temporary
CDU
Flow
with Ø150 flanged
connection
Flush Bypass with
Ø150 flanged Return
CHILLED WATER SCHEMATIC
connection
FOR FULL MEGACHIP2
P P
Detail E Detail F
Corrosion Coupon
Detail G
Coolant Distribution Unit
Detail H (WHITE SPACE)
Differential Pressure Transducer Arrangement
Job No Scale
862224-0002398.00 NTS @ A0
M601 1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22