Engineering P&ID Reference
Engineering P&ID Reference
C
DIFFERENTIAL PRESSURE 50 m 3 WS
FROM DEMI. WATER TREATMENT DN80 WS
S
SYSTEM DRIVER POWER 18.5 kW AA003 FL AA004
IKCP0-WTS-W-21-011 (N-4) MOV
IN
3
22GHC10AA201
M 3
2 TO DEMI. WATER STORATE 3 DN80 WS REFERENCE DRAWINGS 2
TANK #1
CONDENSER VACUUM PUMP 1. P&I DIAGRAMS
THIS DWG. (A-7) 22GHC30 22GHC21 SYSTEM (UNIT2)
00GHC16 50 x 25 - SYMBOL & LEGEND (1/3) : IKCPL-YYG-M-21-001
DN50
BR001 HC1 BR001 HC1 - - SYMBOL & LEGEND (2/3) : IKCPL-YYG-M-21-002
BR001 HC1
*
DN 50 DN 25 - SYMBOL & LEGEND (3/3) : IKCPL-YYG-M-21-003
DN 50 CONDENSER VACUUM PUMP
AA022
AA022
22GHC22 SYSTEM (UNIT2)
BR001 HC1
-
DN 25
REFERENCE DOCUMENTS
AA001
AA021
AA021
3 3
22GHC31 TO CEP SEAL FLUSHING (UNIT2) 1. PIPING MATERIAL CLASSIFICATION : IKCPL-YYG-P-02-001
BR001 HC1 2. TECHNICAL SPECIFICATION FOR INSULATION : IKCPL-YYG-P-02-002
-
*
*
DN 25
AS001
* RO RO 3. INSTRUMENT SET POINT & ALARM LIST : IKCP1-CKN-I-08-002
00GHC14BP001 00GHC13BP001
CHEMICAL DOSING SYSTEM FOR
21GHC31 BOILER (UNIT 2)
BR021 HC1
SPARE BR601 HC1
00GHC14
IKCP0-CDS-W-21-002 (A-3)
SPARE * LI DN 50
DN 50
00GHC10CL501
21GHC40 BOILER INTIAL FILLING (UNIT2)
4 I BR001 HC1 4
PDA+ -
* - DN 100
AA302
AA303
AA311
AA301
00GHC10CT501 00GHC12 DEAERATOR INTIAL FILLING
*
AT001
DN 150 BR011 HC1 22GHC50 (UNIT2)
SPARE
* BR001 HC1150 x 80 BR001 HC1
100 x 50 DN 100 DN 100
-
AA011
5 00GHC12 5
* SPARE 00GHC12 3 20GHC32 SAMPLING SYSTEM (UNIT2)
AP001 BR001 HC1
3 -
AA012
AA001
LICA++/+/-/-- LIT * DN 25
LO
- 00GHC10CL102 DEMI WATER TANK #2
TO DOWNSTREAM OF
00GHC20 COMPRESSED AIR SYSTEM
LICA++/+/-/-- LIT * BB001 22GHC70
- 00GHC10CL101 (UNITE2)
BR001 HC1
00GHC20 -
LO LO DN 100
6 * BR001 HC1 TO DOWNSTREAM OF 6
DN 150
BR001 HC1
AA001 AS001 AA002 COMPRESSED AIR SYSTEM
20GHC20
12GHC70 (UNITE1)
BR021 HC1
DN 100
*
00GHC13
AA003 AS002 AA004 BR001 HC1
IKCPL-PGA-M-21-002 (N-5)
DN 50
DN 100 R CIVIL
CONTRACTOR DOCUMENT REVIEW
3 11GHC40 BOILER INTIAL FILLING (UNIT1)
E MECH
C
V
BR001 HC1 LOG DATE : I ELECT
FROM DEMI. WATER TREATMENT IKCPL-LAB-M-21-002 (N-3) E
DN 100
S
T
TI 10GHC20 12GHC10 LCV TP BY: DATE : I
00GHC17CT501 12GHC10AA101 12GHC10CT401
BR001 HC1 BR001 HC1
AA001
AA301
LOG DATE : O
LO
DN 100 FC
AA401
AA001 AA001 AA001 AA002
3
AA011 AA012
PDIT PI PI DN 100
00GHC11CP151 00GHC11CP501 00GHC11CP502 TIT 3 BR002 HC1 3 23.AUG.'19 ISSUED FOR CONSTRUCTION (APPROVED BY OWNER ON SEP.12.'18) S.W.YOON S.W.YOON J.W.SON
AA001
BR001 HC1
AA302
AA311
2
00GHC10
19.JUL.'18 ISSUED FOR CONSTRUCTION (APPROVED BY OWNER ON JAN.03.'18) S.W.YOON S.W.YOON J.W.SON
12GHC10AA102
DN 150
00GHC11
DN 50
12GHC30
BR001 HC1
WS
AT001 TI WS 1 03.NOV.'17 ISSUED FOR CONSTRUCTION (APPROVED BY OWNER ON SEP.12.'17) S.W.YOON S.W.YOON J.W.SON
DN 150 BR011 HC1 DN80
*
-
AS001
AA402
00GHC11 3 REV. DATE DESCRIPTION DRWN CHKD APPD
9 00GHC11 3 3 9
SPARE AP001 MOV OWNER:
SPARE * LI 12GHC10AA201 IN
00GHC20CL501
3 DEMI. WATER TRANSFER PUMPS M
3
PT PLN (PERSERO)
(2 x 100%) 3 WS
DN80 Jl. Trunojoyo Blok M I/135, Kebayoran Baru Jakarta 12610
AA403
* EQUIPMENT NAME DEMI WATER TANK #1/#2
Phone: +62-21-7261875, 7261122, 7262234, Fax : +62-21-7221330
e-mail: [email protected]
Contract Agreement No. : 1594.PJ/DAN.02.01/DIR/2016
CHEMICAL DOSING SYSTEM FOR
ITEM NO. 00GHC20BB001/00GHC10BB001 11GHC31 BOILER (UNIT 1)
BR601 HC1 PT. PLN (PERSERO) PUSAT ENJINIRING KETENAGALISTRIKAN
* IKCP0-CDS-W-21-001 (E-11)
10 TI WORKING CAPACITY 760 m3 DN 50 10
00GHC20CT501
PLN DWG NO.
1 0 1 1 8 B - 0 0 - M - 5 2 - G HC - 0 0 1 - 0 1 - 3
*
SPARE
MATERIAL CARBON STEEL 12GHC31 TO CEP SEAL FLUSHING (UNIT1) PROJECT:
* BR001 HC1
IKCPL-LCA-M-21-001 (A-11)
KALSELTENG 2 CFSPP(2x100MW)
C
DN 25
* SPARE CONDENSER VACUUM PUMP
S
50 x 25
12GHC21 SYSTEM (UNIT1) CONTRACTOR:
LICA++/+/-/-- LIT * 3 TO FLUSHING PUMP BR001 HC1 CONSORTIUM OF
00GHC20CL102
IKCPL-MAG-CONM-21-001 (C-2)
- DEMI WATER TANK #1 IKCP0-WTS-W-21-012 (A-11)
DN 25 PT TRUBA JAYA ENGINEERING - HYUNDAI ENGINEERING CO., LTD. - ITOCHU CORPORATION
11 00GHC10 CONDENSER VACUUM PUMP 11
LICA++/+/-/-- LIT * BB001 12GHC22 SYSTEM (UNIT1)
- 00GHC20CL101 TO REGENERATION PUMP BR001 HC1
IKCPL-MAG-CONM-21-001 (G-2)
LO LO DN 25
IKCP0-WTS-W-21-014 (A-7)
* DEAERATOR INTIAL FILLING
DRAWN BY DATE TITLE:
S.W.YOON 23.AUG.'19
AA001 AS001 AA002 12GHC50 (UNIT1)
BR001 HC1
IKCPL-LAB-M-21-001 (A-2)
CHECKED BY DATE P&I DIAGRAM
*