Safe Working Rules for Railway Staff
Safe Working Rules for Railway Staff
Rly
14/AUGUST/2024
BLANK PAGE
1. Important authorities in Abs.Block System
S. Conditions Authorities
No.
● Calling–on signal
● P.N issued through
Signal post tele phone
(SPT) + PHS from
Home signal
1. PF/Yd/Cabin
defective
● T/369(3b) +PHS from
foot board of Loco.
● T/369(1) + PHS at the
foot of the signal post.
2. Starter defective ● Calling–on signal
● T/369(3b) + P.H .S at the
foot of the signal post.
3. Adv. Starter/L.S.S T/369(3b) + P.N
defective on Double +I.D.NO. ( P.H.S at the
line point which is
protected by L.S.S)
4. Adv. Starter / L.S.S P.L.C.T {T/C1425 for
defective on Single UP Tn and T/D1425
Line. for DN tn}+P.N+ID No.
5. D.C.O/ C.O. T/409
6. Nil caution order T/A 409
7. Remainder caution T/B 409
order
8. Train admitted on ● Calling–on signal
obstructed line of a ● P.N issued through
MDTC/VSKP/ECoR 1 pillala
station. Signal post telephone
(SPT) + PHS from
PF/Yd/Cabin
● T/ 509
9. Train admitted on T/369 (3b)+PHS
non-signal line SPT/PN+PHS(pf/yd/cabin)
10. Train departure T/511
from non-signal line
11. Train departure T/512
from common
starter line
12. Train send on T/A 602
obstructed block
section
13. Light Engine sent to T/B 602
opencommunication
on S/Line in TIC
14. Train send on TIC T/C 602
on D/L
15. Train send on TSL T/D 602
working
16. Shunting order T/806
MDTC/VSKP/ECoR 2 pillala
2.Important speed restriction in various
circumstances
S. Authorities/ Speeds
No Circumstances (Not exceeding)
1. Calling – on signal Very Cautious speed
and be prepared to
stop short of any
obstruction.
2. Pilot In (Home) 15 kmph
3. Pilot Out (Starter) 15 kmph
4. Adv. Starter Normal speed.(If
(T/369(3b)+PN+ID) or Adv. Starter
PLCT (T/C1425 or protecting any point
T/D1425) 15kmph +PHS at
point)
5. Advance Pilot in Section: Normal
(T/369(1)) speed.Passing
Home15 kmph after
getting PHS from the
signal post. If not –
Stop at Home.
6. T/509 15 kmph and be
prepared to stop if
required.
7. Non-signal line 15 kmph
admission
8. Non-signal line departure 15kmph
MDTC/VSKP/ECoR 3 pillala
9. T/A 602 15/10 kmph
10. TIC on S/L (T/B 602) to 15/10 kmph
open up communication
11. T/D 602 (TSL working) 1st train speed 25
kmph. 2nd and
subsequent trains
–booked speed.
12. T/C 602 (TIC on D/L) All trains 25/10
kmph
13. Shunting order (T/806) Normal shunting 15
kmph, Inflammable
articles 8 kmph
14. Train backing in section Walking speed
15. A. Material train availing A. 25 kmph
block.
B. Material train pushing B. 25/8 kmph
B/Van leading
C. Material train pushing C. 8 kmph.
B/Van not leading
16. 1. Sectional speed.
1. A class ODC
2. B class ODC 2. 40/15 Kmph
3. C class ODC 3. 25/8 kmph,
Dead stop if required,
and walking speed
17. 1. Foggy weather 1. Maximum 60 kmph
2. If fog safe device 2. Maximum 75 kmph
provided
(in auto-proceed aspect)
MDTC/VSKP/ECoR 4 pillala
18. Foggy weather (in auto- 30 kmph
Attention)
19. Foggy weather (caution ) Cautious speed and
be prepared to stop
at the next signal
20. OHE tripped for more 35/20 kmph.
than 3 minutes and
reason notknown
21. N.I working 30 kmph
22. 1 in 12 straight 15 kmph
23. 1 in 12 curved 30 kmph
25 1 in 8½ curved switch 15 kmph
26 1 in 8½ curved switch 30 kmph
with symmetrical split
27. I.B at ON, telephone not 15/8 kmph.
working/ not provided
28. 1. IBS-itself 1.PN+I.D(Normal
defective, telephone speed)
working 2.PN +ID + Gate PN
2. IBS-itself Cautious speed up to gate,if
defective which is gate is closed and PHS by
I/L with Gate. Gate man then normal speed
telephone working 3.PN+GatePN.Cautious
3. IBS defective due speed up to gate,if gate is
closed and PHS by Gate man
to gate defective.
then normal speed.
telephone working.
29. Advance authority to T/369 (3b)+PN+ID
pass IB at ON Normal speed
MDTC/VSKP/ECoR 5 pillala
30. Std.I(R) Interlocking 50 kmph
31. Std.II(R) Interlocking 110 kmph
32. Std. III (R) Interlocking 140 kmph.
33. Std. IV (R) Interlocking 160 kmph
34. Petrol man not turn up 40 Kmph (Day)/
within15 minutes 15 Kmph(Night)
35. Less serious rail fracture 10 kmph (Ist train)
36. Less serious rail fracture 20 KmpH (2nd &
subsequent trains)
with caution order
3. Timings to be maintained in different
circumstances
S.NO Circumstances Timings
1. TIC on D/L in 30 minutes time
Absolute Block System interval for each
andevery train
2. TIC on D/L in 15 minutes time
Automatic system interval.
3. A.R.M.E Departure-time: 25
(Single Exit) minutes from
ordering.
4. A.R.M.E Departure time:
(Double exit) 15 minutes from
ordering.
5. A.R.T. Day time 30 minutes.
MDTC/VSKP/ECoR 6 pillala
6. A.R.T. Night time 45 minutes.
MDTC/VSKP/ECoR 7 pillala
15 Modified mid section
semi-auto signal at ON, Wait for 5 minutes
A-marker not glowing,
telephone not working
4. Blasting of Hooters, after getting information of
accident.
S.No. No. of hooter Duration of Gap in Purpose
sound each blast between
blasts
1. Three 60 sec 10 sec To send
(0 0 0) ART only
2. Five 60 sec 10 sec To send
(0 0 0 0 0) ART+
ARME
5.Detonators placement in different
circumstances:
One detonator:1. Extreme emergency
2. FSS defective in Off condition 90 m from signal
post.
Two detonators:
● Foggy weather
● 270m+10 m placement in rear of home signal
● 270 mts + 10 mts placement in rear of caution
indicator if it is not visible from 180mts
Three detonators:
● Block ticket ( in rear) → 250 mts + 250 mts
+ 10 mts
MDTC/VSKP/ECoR 8 pillala
● TIC on D/L or S/L → 250 m + 250 m + 10 m
● Auto section →90 mts + 90 mts + 10 mts
● Auto sec: Engineering Banner Flag protection
→BF 90mts + 180mts + 10 mts + 10 mts
● ABS: Engineering Bannrer Flag protection
→BF600mts + 1200 mts + 10 mts + 10mts
Four detonators:
● Train protection in rear → 600 mts + 600 mts + 10
mts+10 mts
● Train protection in front → 600 mts + 600 mts + 10
mts +10 mts
● Adjacent line protection → 600 mts + 600 mts +
10 mts +10 mts
● One train only system → 600 mts + 600 mts + 10
mts +10 mts
● In D/L Auto- TIC : Rear protection — 600 mts + 600
mts + 10 mts +10 mts
● In TSL working: Rear protection —600 mts + 600
mts + 10 mts +10 mts.
6. Duties of LP/ ALP incase of fire in
passenger train
● Stop the train immediately.
● Switch on flasher light.
● Detrain the passengers first.
● If there is any postal van on the train, save
MDTC/VSKP/ECoR 9 pillala
mails.
● Give FIR to all concerned (KM, time, nature of fire
etc)
● Disconnect electrical fittings in coach, fuse links.
● Extinguish the fire with the fire extinguisher.
● Isolate burning vehicle at least distance of
45 mts on bothend.
● Give first aid to the injured persons
● Try to shift injured persons to the nearest
hospitals
● Protect the train as per GR 6.03
● If fire is uncontrollable, ask for fire brigade.
7. Adjacent line protection
1. Flasher light- ON, 2. Show warning signal.
Always protect 600 – 600 – 10 – 10 meters in the all system
of working by placing 4 detonators and on return collect
Intermediate detonator.
8. Single detonator Burst:
1. Immediately apply emergency brake and look for any
danger(PCEE safety instruc. no.5/2024 dt.14.06.24)
2. Note down the Km. No., section, Time.
3. Give intermittent whistle.
4. If crew do not notice any obstruction then start the
train and proceed cautiously and be prepared to stop
sort of any obstruction up to 1.5 km.
MDTC/VSKP/ECoR 10 pillala
5. If no danger is found then Pick up normal speed and
give information to the S.M. of the next station.
MDTC/VSKP/ECoR 11 pillala
10. LP Duties during Dead engine attaching:
1. In normal case, always dead engine should
be attached in the rear of the leading engine.
2. In 1 in 100 down gradient dead engine should
not be attached in rear for all Trains (Goods &
Coaching)
3. Dead engine can be attached as per the
following table
In front In rear (Emergency)
MDTC/VSKP/ECoR 13 pillala
the train, immediately control the speed and stop
the train in the first convenient place to avoid
sharp curves, cuttings, bridges, high
embankments.
2. LP should take care to avoid any jerk while
stopping.
3. In case coaching train try to open doors and
windows of the coaches with help of the TMR or
Rly staff in train for free passage of wind
through the coaches.
4. Note time, km no. and inform TLC/SCR
/Coaching control/SM.
5. LP shall restart the train in consultation
with the TMR only after the cyclone /storm/or
wind abates.
MDTC/VSKP/ECoR 16 pillala
can give PN to TMR for backing.
6. TMR should prepare two copies quoting the
P.N and one copy should be handed over to LP
and take acknowledgment in another copy.
7. In case of Auto section, if no train is sent in
rear of that train, S.M shall give P.N to TMR by
any means of communication, so the TMR do
the duties as in I.B territory; LP act
accordingly.
8. Train can be backed by lowering home
signal by S.M in rear station(in S/L) or P/In; on
D/L section Train is P/In, (T/369 (3b).
16. Shunting authorities / shunting
precautions to be taken by LP/ALP;
during shunting:
Shunting Authorities:
1. Within the station section if shunting performed
by signals; shunting memo not required, shunting
particulars shouldbe given to LP by written memo/
verbal orders.
MDTC/VSKP/ECoR 17 pillala
2. If shunt signal defective T/806 should be issued
+ P.H.S.
3. If shunting beyond the station section, T/806 +
B/B or B/F PN issued.
Shunting Precautions:
1. Normal shunting speed maximum up to
15kmph.
2. Inflammable articles shunting speed up to
8kmph.
3. In case of Ghat section, engine always
should be in downgradient.
MDTC/VSKP/ECoR 19 pillala
3 If there is no calling on signal, if telephone is
provided, take
P.N from S.M and ensure PHS from
cabin/Yd/ PF, all facing & trailing points
are correctly set and locked with the speed
of maximum15kmph.
4 If written memo T/369(3b)+PHS issued, LP start
the train with speed of maximum 15 kmph
ensures proper route setting.
5 In case T/369(1) issued in rear station or last
stopping station, LP maintain sectional speed,
control the speed at home and ensure P.H.S at
home signal and proceed with maximum
15kmph by ensuring facing & trailing is set and
locked.
20.In case starter defective duties of LP
1 If calling on signal is lowered, proceed cautiously.
MDTC/VSKP/ECoR 22 pillala
26. If LP is incapacitated:
a. If ALP is not duly qualified he should stop
the train and inform all concerned, and
should not start the train. Wait for relief is
arranged.
b. If ALP is duly qualified, inform all
concerned, clear the section with
maximum 25kmph speed. (Only one block
section).
c. If required, shunt back the train into a convenient
line and wait for relief crew.
I. Switch ON FL,
use frequent
whistle.
II. Stop at the right line home signal OR wrong
line Adv. Starter, whichever comes first.
III. Train will be P/In (T/369(3b))
Protection as per GR 6.03.
29.Duties of crew, when IB-cum-Distant is
defective and telephone is working:
a. Stop the train. Obtain PN & ID over IB
telephone from rear SM.
b. Inform TMR of the train, exchange signal,
give 0-0 whistle.
c. Proceed cautiously and follow the next
stop signal aspect.
MDTC/VSKP/ECoR 24 pillala
kg/cm2 of BP in the locomotive.
2. Ensure 4.8 / 4.7 kg/cm2(above 58 vehicles) of
BP pressure in the BV/LV.
3.Apply A9 automatic brake valve and reduce BP
pressure by 1 kg/cm2 without pause (gauge
reading 4kg/cm2 .)
4. Confirm with the TMR for corresponding
reduction of BP pressure in the BV (3.6 - 3.8
kg/cm2)
5. LP has to close A8 Cock / 70 Cock / MODE
switch in TEST.
6. TMR shall open the BV emergency valve till BP
drops to zero, then close the BV emergency
valve.
7. If the BV is not the last vehicle,TMR shall open
the BP angle cock in the rear side of last vehicle
till BP drops to zero, then close the BP angle
cock.
8.Both LP and TMR to ensure dropping of BP
pressure completely to “0” and no further raise in
BP.
9.Now LP to normalize A8 Cock /70 Cock/MODE
switch to LEAD and keeps A-9 on RUN.
10. Charge 5.0 kg/cm2 of BP in the loco and 4.8 /
4.7 kg/cm2 of BP in the BV/LV.
MDTC/VSKP/ECoR 25 pillala
31. BP continuity test for coaching trains:
a. Create 10 kg/cm2 of MR pressure and 5
kg/cm2 of BP, 6kg/cm2 of FP in the
Locomotive.
b. Ensure 4.8/4.7(above 26 coaches)kg/cm2 of
BP, 5.8/5.7kg/cm2 of FP in the SLR/LV.
c. Apply A9 automatic brake valve and reduce BP
pressure by 1 kg/cm2 without pause (gauge
4kg/cm2). Confirm with the TMR for
corresponding reduction of BP pressure in the
SLR / LV(3.6 - 3.8kg/cm2).
d. Release A-9 and ensure BP pressure 5kg/cm2
in loco and ensure 4.8/4.7kg/cm2 in SLR / LV.
e. After the BP pressure has stabilized in the
locomotive,LP to close A8 Cock / 70 Cock /
MODE switch in TEST.
f. Then the TMR shall immediately open the
Emergency brake valve to vent out the BP to
3.6 Kg/cm2 and close the emergency valve. LP
should observe that the pressure in the BP
gauge in the locomotive is within in the range
of 3.6 to 4.0 Kg/cm2.
g. Now both LP and TMR to ensure no further
raise in BP from this level.
MDTC/VSKP/ECoR 26 pillala
h. LP to open the A-8 cock /E-70 cock / mode
switch in LEAD and restore the BP in Loco
5kg/cm2 and in SLR/LV is 4.8/4.7kg/cm2
32.Duties of crew, when LSS-cum-Distant is
defective at ON:
After obtaining PLCT in S/L or T/369(3b)+
PN+ID in D/L, pass LSS cum Distant at ON,
Proceed cautiously and follow the aspects of the
next stop signal.
33.Duties of crew, when IB-cum-Distant is
defective and SM of rear station is
aware of it:
At the rear station, the train to be stopped.
a. SM shall issue T/369(3b) with PN & ID with
endorsement that to proceed with normal
sectional speed without stopping at IB duly
observing other Speed Restrictions in force.
***********************
For any discrepancy please refer the GR, SR, BWM, AM, OPM and special
instructions of E.Co.Rly.
MDTC/VSKP/ECoR 27 pillala
Automatic section authorities / MDTC / VSKP / E. Co. Rly
S. Sec- Circumstances Authorities Speed Related Remarks
No. tion (Not exceeding) Rule
1 D/L Home Signal failed 1. Calling on 1.Very cautious GR 9.14, Up to
SR the next
(A-Marker not 2. SPT +PHS (pf/yd/stn) 2. 15kmph 9.14.01a, signal
glowing) SR
3. T-369(3b) +PHS 3. 15kmph 3.69.03
2 D/L Starter failed-Loop 1.Calling-on 1. Very cautious GR 9.14, Up to the
line and Main Line next
2.T-369(3b) +PHS 2. 15kmph GR 3-H, signal
(A-marker not GR 3.69
glowing )
3 D/L Advance starter T/A 912 15/10kmph upto the SR
failed(A- Marker next signal and then 9.14.01 b
not glowing) follow its aspect.
4 D/L Advance starter T/D 912(ID no, PN 1. First train 25kmph SR Ensure
failed(A- Marker no) + Caution order 2. Second and 9.14.01 b that the
not glowing) subsequent trains LC gates
are
No intervening normal speed duly
closed
Auto signals observing the other and PHS
between the Speed Restrictions in by Gate
stations force. man
1 MDTC/VSKP/ECoR pillala
5 D/L Failure of all (or) T/D 912(ID no, PN 1. First train SR Ensure
series of signals no) + Caution order 25kmph 9.12.01 that the
likely to last for LC gates
some time. 2. Second and are
subsequent trains closed
(prolonged failure and PHS
of signals - normal speed duly
by Gate
Communication observing the other
man
available) Speed Restrictions in
force.
6 D/L All signals are Caution order + List As per the aspect of SR
working but of trains (for the first signals. First train to 9.12.05
communication train of series listed) stop at the FSS of
not available to be handed over at next station ,
next station. contact with SM,
signals may be taken
OFF, hand over the
list of trains.
7 D/L Total interruption T/B 912 25/10kmph SR
of communication 9.12.02
15 min. Interval
between trains
2 MDTC/VSKP/ECoR pillala
S. Sec- Circumstances Authorities Speed Related Remarks
No. tion (Not exceeding) Rule
D/L Temporary single 1)For all wrong line 1. First train SR Ensure
9.12.03 that the LC
line working on trains and first right 25kmph. gates are
8 D/L. (obstruction line train closed and
on one of the lines i).PLCT(T/C1425 Second and PHS by
and means of up,T/D1425 dn with subsequent trains Gate man
3 MDTC/VSKP/ECoR pillala
10 D/L Other than TSL T/A 602 + SM to 15/10kmph SR Ensure
9.12.03 that the LC
working, train or indicate the all gates are
LE proceeding on governing and non- (e),
closed and
wrong line to next governing signals to SR6.02.0 PHS by
station (not a be passed at ON Gate man
5 (g)
passenger train)
11 S/L Home signal failed 1.Calling on 1. Very cautious GR9.06, SR Up to the
9.14.01 (a) next
(if A-marker is not SR 3.69.03
glowing) 2.SPT +PHS 2. 15kmph signal
(pf/yd/stn)
3.T-369(3b) +PHS 3. 15kmph
12 S/L Starter failed & A- 1.Calling-on 1. Very cautious GR 3-H, Up to the
marker not next
2.T-369(3b) +PHS 2. 15kmph GR 3.69 signal
glowing (where
Advance Starter is
provided)
13 S/L Direction of traffic 1. Controlling station Not exceeding BWM
established but T/ A 912 + T 512 15/10kmph up to 7.23(1) a
Advance starter the next stop signal (iv)
failed (or) Starter 2. Controlled station and then follow its
failed where T/A 912 aspect.
advance starter
not provided.
4 MDTC/VSKP/ECoR pillala
S. Sec- Circumstances Authorities Speed Related Remarks
No. tion (Not exceeding) Rule
14 S/L Direction of traffic 1. PLCT(T/C1425up, First train 25kmph SR Ensure
not established 9.12.07 that the
(or) contradictory T/D1425dn with ID Second and LC gates
no, PN no) subsequent trains BWM are
indication of 7.23(v) &
normal speed duly closed
arrows on panel 2. T/A 912 (indicate (vi) and PHS
(or) red indication observing other SRs
the all governing and in force. by Gate
of arrows on panel non-governing man
(or) Panel signals to be passed
suspended and at ON)
Advance starter 3. Caution Order
failed (or) Starter
failed where
advance starter
not provided
15 S/L Working in T/C 912 + SM to 15/10kmph SR Ensure
9.12.08 that the LC
obstructed block indicate the gates are
section governing and non- SR closed and
governing signals to 6.02.05 PHS by
be passed at ON Gate man
5 MDTC/VSKP/ECoR pillala
16 S/L Total interruption 1)T/B 602 + T/A912 1) 15/10kmph while SR Ensure
of communication for opening opening 9.12.06 that the
communication communication LC gates
SR are
6.02.04 closed
2)After opening 2)First train normal
communication T/G speed, subsequent and PHS
by Gate
602 up (or) trains 25/10kmph
man
T/H 602 dn + T/A Time interval is
912 + Caution Order 30min.
17 S/L Auto signal or Stop the train SR
Semi - auto signal 9.02.02
and with A -marker 1. Follow the aspect 1. As per steady
which is steady for aspect SR
D/L glowing is 9.07.02
Bobbing and 60sec
Flickering
2. 15/10kmph upto SR
2. No steady aspect 9.02.01
the next stop signal
then follow the most
and follow its aspect
restrictive aspect of SR
the signal post(ON 9.07.01
aspect)
6 MDTC/VSKP/ECoR pillala
S. Sec- Circumstances Authorities Speed Related Remarks
No. tion (Not exceeding) Rule
20 S/L Auto signal at ON Stop the train, wait 1 15/10kmph up to GR 9.02, Maintain a
clear gap
or minute by day / 2 the next signal then from
and SR
minutes by night or follow its aspect. 9.02.01
preceding
Semi-Auto signal when view a head is
train or
D/L at ON with A- Exercise great
obstruction
not clear, GR 9.07, of 150m/
marker glowing. caution and be two OHE
spans or
prepared to stop 75m/one
7 MDTC/VSKP/ECoR pillala
contact SM if SPT sort of any SR OHE span
for EMU or
provided(S/L), give obstruction 9.07.01 closure in
spl.
one long whistle, GR circumstanc
inform and 9.14(1) es.
exchange signals Inform SM
with TMR, start the of next
station.
train.
21 S/L Gate stop signal at 1. If A-Marker is 1. 15/10kmph upto GR 9.15 observe
ON in auto section glowing I.e. Gate is the next signal then that the
and GR 9.02, LC gate is
closed , follow the follow its aspect.
Stop the train with procedure to pass SR closed
D/L continuous long and PHS
Auto signal at ON 9.02.01
whistle ensure G by Gate
2.If A-Marker 2. If Gate is closed and GR 9.07, man.
marker and A- extinguished, wait 1 Gate man exhibiting Inform
marker. minute by day / 2 hand signals, proceed SR next
minutes by night further past the gate 9.07.01 station
sound one long cautiously, then follow SM .
GR
whistle, inform and SR not exceeding 15/10
9.14(1)
kmph upto the next
exchange signals
signal then follow its GR 3.73
with TMR proceed aspect.
cautiously up to
Gate 3. If Gate is open,
gate man not
8 MDTC/VSKP/ECoR pillala
available, stop in rear
of Gate, after
ascertaining that gate
is closed and after
getting hand signal,
pass the gate
cautiously, then follow
SR not exceeding 15/10
kmph up to the next
signal then follow its
aspect. Report the
matter at next station.
S. Sec- Circumstances Authorities Speed Related Remarks
No. tion (Not exceeding) Rule
22 S/L Mid section Stop the train GR Report
modified semi – 9.01(3) & the
and auto signal is ON (4) matter
10 MDTC/VSKP/ECoR pillala
and obstruct Main Line 1. Calling-on signal 1. Very cautious BWM
then manually 7.08(1),
or
D/L operated stop 7.18(1)
2. shunt signal b&c
signals, HOME
(shunting between 2. 15kmph
signal, L.S.S to
outermost points
be kept at ON and and L.S.S on D/L ,
semi-auto stop Shunting between
signals A-marker is outermost points on
kept extinguished. S/L)
25 S/L Shunting outside T-806 + Block Back 15kmph BWM
the outer most PN 7.07(2),
and points at 7.08(2)
approaching end. Rear block section is 7.18(2),
D/L to be kept clear and 7.19
auto block system is
to be suspended
26 D/L Shunting outside T-806 + Block 15kmph BWM
the L.S.S. Forward PN 7.07(3),
7.08(2)
Block section ahead &(3)
is to be kept clear
and auto block
11 MDTC/VSKP/ECoR pillala
system is to be
suspended OR
Shunting in rear of
running away train if
SWR permits
27 S/L Shunting outside T-806 + Block Back 15kmph BWM
the outermost PN 7.18(2)
points in the 7.19
established Block section ahead
direction of traffic is to be kept clear
and auto block
system is to be
suspended OR
Shunting in rear of a
running away train if
SWR permits
NOTE: This is only for the guidance of the Crew/TMR/SM ; in case of any ambiguity, Staff shall follow GR , SR, BWM , SWR and S.I. in
force.
12 MDTC/VSKP/ECoR pillala