Southern Journal of Engineering & Technology Vol.
1(1), 2023
           Analysis of Designs - A comparative Study of BIM and
                                                  AutoCAD
  Aayzaz Ahmed1, Muhammad Junaid2*, Muhammad Danish1, Mirza Aamish Hassan Khan1, Maryam
                                                Gull3, Riaz Ahmad4
  1
      Structural and Architectural Designing Engineer at UPTOWN Architects & Designers, United Mall, Multan
                 2
                     Department of civil engineering, Greenwich University London, United Kingdom
                      3
                       Structural Designing Engineer at Ikram Consulting Engineers, DHA Lahore.
           4
            Department of Civil Technology, Government College of Technology,60000 Multan Pakistan.
Abstract. Building information modeling (BIM) is software for the efficient designing of the structures, which
provides the advanced level designing of the structures along with the quantity takeoff required for the
construction of the respective structure. On the other hand, AutoCAD is the traditional drafting software which
is not enough efficient as compared to the building information modeling software. This research also focuses
on the visual as well as featural differences of the building information modeling software (BIM) and AutoCAD,
by the qualitative design analysis of the same structure from both AutoCAD and BIM, and also by quantitative
analysis technique for this research which incorporates the questionnaire online survey, to collect the responses
from various experts such as civil engineers of different years of experience and BIM experts of the different
levels and years of experience. According to the design analysis result, by using BIM and AutoCAD Models and
drawings, to visualize the difference between the features and level of advancement and efficient modeling. The
BIM allows us to design structures that are more attractive as well as well-structured along with the quantity
takeoff for the specific drawing. While AutoCAD is just the drawing software, it does not support the quantity
takeoffs and finished look better than that of BIM, according to the quantitative results, it can be concluded that
implementing BIM could reduce human error and also provides user-friendly ease to work, and also to perform
necessary variations without reworking on the model from the beginning.
Keywords: AutoCAD, BIM, Modelling.
Email: [email protected]
                                                              support to model the lifecycle of the building, which
1. Introduction to BIM                                        provides a framework for the entire project for
BIM (Building Information Modeling) has the                   execution, designing modeling, and drawing of the
potential to be a game-changer in the architectural,          entire structure. The building information model
and civil engineering business. Building Information          (BIM) also provides the advanced level designing of
Modeling technology generates a precise virtual               the structures along with their quantity takeoff and
picture of a digitally constructed building. The              the project schedules to work effectively during the
computer-generated model, once completed, will                execution stage. BIM technology can help with a
include flawless drawing components and also the              range of business activities. Although BIM adoption
important details for the structure to construct,             is still in its early stages in the AEC/FM (Facilities
commercially or for residential purposes. Building            Management) business, while the software named
information modeling software also provides the               “AutoCAD “is being used widely to produce the
                                                         35
Junaid, M. et al.
drawings unable to create an efficient and smart                 building information modeling software (Li, et al.,
model of the building (AutoCAD, 2020), AutoCAD                   2014).
is works based on the basic level of drawings
                                                                 1.2.     Building Information Modelling levels
techniques,     though   the   advances      are   being
incorporated in the software but still not efficient             Building an information model provides the access to
enough as compared to the building information                   visualize a three-dimension model of the drawings
modeling software (Eastman, Teicholz, Sacks, &                   that serve as the project's sole source of data.
Liston, 2008 ).                                                  According to Mark Bew and Mervyn Richards'
                                                                 model (Mark & Mervyn, 2013), four levels of the
1.1.      BIM Strategy
                                                                 drawings can be distinguished, either prepared by the
BIM is the advanced level software for building                  AutoCAD or by Building Information modeling
modeling, which incorporates the modified, realistic,            software. Any sort of paper documentation, whether
and rendered visualization along with the efficient              created by hand or using computer-aided design
and advanced structural modeling of the developed                (CAD) software, falls under Level 0. Level 1 refers
drawings      (Dunston   &      Wang,     2005).    The          to digital files that contain 2D and 3D content that is
advancement in building information modeling is                  not backed up by a comprehensive database.
also being approached by the various modeling                    Building information modeling might be considered
developer companies to improve the level of a                    to begin at Level 2. It appears to be comparable to
building and structural simulations (Eastman C,                  Level 1 from before. The library management and
Teicholz P, Sacks R, & K, 2011). Following are the               file-based communication tools employed in the
strategies to make the 3d models of buildings, being             project are the most significant differences. As a
adopted widely throughout the world:                             result, the essence of BIM is a project-wide shared
                                                                 database, linked to the object's 3D model, from
By using the building information modeling software,
                                                                 which    we   may    create comprehensive      project
such as the “Revit” supported by Autodesk, to create
                                                                 documentation. Currently, the majority of engineers
the user-friendly building modeling, in the sense of
                                                                 work at Level 1 or 2 positions. BIM proponents have
changing      the   design     parameters,     structural
                                                                 set a goal of preparing all projects in BIM at Level 3
components, to identify the flaws and mistakes in the
                                                                 (intelligent BIM, or BIM), which allows for
designs, and the ease to make the changes and
                                                                 construction management throughout the design life
variation if required, without changing the entire
                                                                 cycle. They also expect ISO standards to be
design (Building SMART, 2010).
                                                                 introduced, as well as the widespread adoption of
The three-dimensional building construction models               BIM formats like IDM, IFC, and IFD (Hietanen,
can also be developed by using AutoCAD software                  2008).
supported by Autodesk. The AutoCAD 3d models or
                                                                 1.2.1.   Collision detection
the drawings are usually considered a lower-level
design for the drawings, which is called the level”0”,           Collision detection is the essence of interdisciplinary
in the BIM technology. as the AutoCAD lags in                    cooperation in the old design when collisions were
providing Real-time environments to the drawings,                found visually by tracing all crossings with
and also the visualization difference of the drawings            overlapped drawings on tracing papers. A similar
being produced by the AutoCAD, as compared to the                approach is used in CAD 2D systems, where layers
                                                            36
Junaid, M. et al.
of different colors are visually contrasted on a              3. Results and Comparative Analysis of
computer screen. The next stage was to use a CAD                     BIM and AutoCAD drawings and models
3D model to help detect collisions. There is, however,        3.1.      Qualitative Method Results
a significant distinction between CAD 3D and BIM              3.1.1.    Analysis of Design
3D. Collision detection in BIM is based on
technologies created for the gaming and computer
graphics industries. Collision detection techniques in
BIM should be precise rather than quick. As a result,
BIM systems employ computer graphics techniques
as well as sound engineering practices and standards.
BIM distinguishes three types of collisions:
•    Severe Collisions occur when two objects clash
     in the same space.
•    Physical collisions: verifying the assembly
     sequence and delivery schedule; verifying the
     number of workers and time required to
     complete the construction phase.
•    Technological collisions: verifying the assembly
     sequence and delivery schedule; verifying the
     number of workers and time required to                          Fig. 1. Food Court Plan in Mall of Oman
     complete the construction phase. The ability to                              (AutoCAD)
     detect collisions is a significant advantage of
     building information modeling in general.
     During both the design and construction phases,
     it offers significant cost reductions (Ireneusz
     Czmoch & Pekala, 2014).
2. Methodology Flowchart
                                                              Fig. 2a. Food Court Finish Plan in Mall of Oman
                                                                                   (BIM)
                                                              Fig. 1 and Fig. 2, show the visual difference in the
                                                              same plan designed on AutoCAD and modified on
                                                              BIM. The difference between the software, BIM, and
                                                              AutoCAD is can be visualized from the output
                                                              drawings. The BIM allows us to design structures
                                                         37
Junaid, M. et al.
that are more attractive as well as well-structured
along with the quantity takeoff for the specific
drawing. While AutoCAD is just the drawing
software, it does not support the quantity takeoffs,
and the finished look better than that of BIM.
                                                                Fig. 3. Food Court Column Architectural Plan
                                                                             Mall of Oman (BIM)
Fig. 2b. Food Court Finish Plan in Mall of Oman
                     (BIM)
                                                               Fig. 4. Food Court Modified Plan in Sitting Area
                                                                            in Mall of Oman (BIM)
                                                                  Fig. 5. Food Court 3D plan, Mall of Oman
                                                                                 (AutoCAD)
 Fig. 2c. Food Court Terrace Ceiling Plan Mall of
                  Oman (BIM)
                                                              Figs. 6-8 shows the 3D model of the interior design
Figs. 3-5 shows the basic architectural plan for the          of the food court located in the Mall of Oman
sitting area made by AutoCAD and the modified plan            developed by using AutoCAD and BIM respectively.
by using BIM with sitting arrangement to provide a            While, Fig. 7, and Fig. 8 show the columns and
real look by using the filled rendered objects for the        special features in the food court by using AutoCAD
previously created features, respectively.                    and BIM, respectively.
                                                         38
Junaid, M. et al.
                                                               human resource”, “specialization” is 0.24, 0.257,
                                                               0.69 respectively, For the (Implementing of BIM
                                                               could reduce the human error due to incomplete,
                                                               incorrect, and rework during design) with the
                                                               demographic variables, it is observed that it has a
                                                               strong relationship with the specialization and weak
                                                               correlation with the size of the company based on
                                                               human resource. And the covariance is observed to
                                                               be about 1.667. (Adopting BIM can earlier detect the
Fig. 6. Food Court 3D plan, Mall of Oman (BIM)
                                                               design errors and clashes among a variety of
                                                               structural, mechanical, electrical and plumbing
                                                               systems) with the demographic variables, it is
                                                               observed that it has a positive correlation with years
                                                               of experience of BIM technology variable while
                                                               negative   with   other   two variables. And        the
                                                               covariance is observed to be about 2.138. According
                                                               to the results of the correlations for the (Drawing
                                                               errors could be greatly adjusted through BIM
                                                               implementation) with the demographic variables, it is
                                                               observed that it has a negative correlation with all the
   Fig. 7. Food Court 3D plan with Column and                  demographic variables. And the covariance is
   Special Features, Mall of Oman (AutoCAD)                    observed to be about 1.720, while for the (BIM could
                                                               enhance communication between design team) with
                                                               the demographic variables, it is observed that it has a
                                                               significant correlation with all the specialization
                                                               variables. And the covariance is observed to be about
                                                               1.826. According to the results of the correlations for
                                                               the (The financial aspect of BIM setup prevents its
                                                               implementation i.e., software, training, and hardware)
                                                               with the demographic variables, it is observed that it
                                                               has a positive correlation with the size of a company
   Fig. 8. Food Court 3D plan with Column and
      Special Features, Mall of Oman (BIM)                     based on human resource variable while negative
                                                               with other two variables. And the covariance is
3.2.      Quantitative Method Results
                                                               observed to be about 2.202, while for the (High cost
3.2.1.     Correlation Analysis
                                                               of recruiting BIM specialists) with the demographic
According to the results, it is observed that “years of        variables, it is observed that it has a negative
experience of BIM technology” has a strong                     correlation with all the demographic variables. And
relationship with the specialization. While the                the covariance is observed to be about 1.426.
covariances observed for the “years of experience of
                                                               According to the results of the correlations for the
BIM technology”, “size of a company based on
                                                               (lack of awareness of the capabilities of BIM tools)
                                                          39
Junaid, M. et al.
with the demographic variables, it is observed that it         and negative correlation with the years of experience
has a negative correlation with all the demographic            of BIM technology, And the covariance is observed
variables. And the covariance is observed to be about          to be about 1.085.
1.168., while for the (Cultural resistance in
                                                               According to for the (Engineers in the industry prefer
companies is the greater challenge than any
                                                               AutoCAD for Structural Design instead of BIM) with
technological challenge) with the demographic
                                                               the demographic variables, it is observed that it has a
variables, it is observed that it has a significant
                                                               significant positive correlation with the size of a
negative correlation with the size of a company based
                                                               company based on human resources variable, And
on human resource variable. And the covariance is
                                                               the covariance is observed to be about 1.275, while
observed to be about 0.993.
                                                               for the (BIM can be considered more suitable for the
According to the results of the correlations for the           project planning according to design than AutoCAD)
(Lack of demand and disinterest of BIM) with the               with the demographic variables, it is observed that it
demographic variables, it is observed that it has a            has a positive correlation with the size of a company
negative correlation with the specialization variable          based on human resources variable and negative
and a positive correlation with other demographic              correlation   with   the   specialization,   And   the
variables. And the covariance is observed to be about          covariance is observed to be about 2.395, on the
1.402, while for the (An insufficient electronic               other hand, for the (AutoCAD 3D contains less
standard, protocols, and coding system of BIM) with            realistic approach in structural designing than BIM)
the demographic variables, it is observed that it has a        with the demographic variables, it is observed that it
negative correlation with all the demographic                  has a negative correlation with all demographic
variables and the covariance is observed to be about           variables. And the covariance is observed to be about
1.131.                                                         1.430.
According to the results of the correlations for the           Fig. 9 responses based on Engineer’s Specification
(Adopting alternative standards like New      Rules of         for BIM Q1, as according to the results of the
Measurement         (NRM) can solve the lack of BIM            question regarding BIM implementation that could
standard) with the demographic variables, it is                reduce the human error during designs, most civil
observed that it has a strong correlation with the size        engineers based on specialization about 16.67% of
of a company based on human resource variable, And             the total respondents agreed on it. According to the
the covariance is observed to be about 1.128, while            results of the question regarding the adoption of BIM
for the (Multi software of BIM    lead to decrease the         that that can help detect errors and design mistakes
efficiency)with the demographic variables, it is               within the drawings and provide a user friendly and
observed that it has a significant positive correlation        easy variation in the specific part of the flawed
with years of experience of BIM technology variable,           design, on the other hand, as AutoCAD does not
And the covariance is observed to be about 1.197,              provide such easiness to the users, in AutoCAD the
and on the other hand, for the (Few data/information           design mistakes are to be observed manually and also
could be lost while transforming between          BIM          to be altered to change under the correct design
software) with the demographic variables, it is                standards all over again. Fig. 10 shows the responses
observed that it has a positive correlation with the           that the drawing error could be greatly adjusted
size of a company based on human resources variable            through the use of BIM technology under the year of
                                                          40
Junaid, M. et al.
experience of the respondents. For both of the               respondents have scored 23 percent of the positive
categories of the respondents, either less than five         agreed responses.
years or the experience of more than a year, all the
                               Fig. 9. Responses based on Company Size for BIM Q2
                    Fig. 10. Responses based on Experience of BIM technology for BIM Q3
4. Conclusions                                                     drawing than that AutoCAD. BIM provides an
                                                                   improved      and   efficient   environment   for
a)   From the observed results, it can be concluded
                                                                   architectural designing and plans as well.
     that   BIM     provides    more   advanced-level
                                                        41
Junaid, M. et al.
b) From the result, it can also be concluded that                    References
     BIM involves 3D solid components designed                       AutoCAD. (2020). Retrieved from EDUCBA:
     in   the       well-mannered     Revit       modelling              https://www.educba.com/introduction-to-
     environment due to which very little time is                        autocad/.
     required to produce drawings, while in
                                                                     Building     SMART.       (2010).   Retrieved   from
     AutoCAD every feature is to be designed
                                                                         http://www.buildingsmart-tech.org/.
     manually which takes a lot of time.
c)   According to the quantitative results, it can be                Dunston, P., & Wang, X. (2005). Mixed Reality-
     concluded that implementing BIM could                               based Visualization Interfaces for the AEC
     reduce human error due to incomplete,                               Industry. Journal of Construction Engineering
     incorrect, and rework during design. As more                        and Management, 131((12)), 1301-1309.
     than 50 of the respondents agreed to this
                                                                     Eastman C, Teicholz P, Sacks R, & K, L. (2011).
     statement.
                                                                         BIM      handbook:     a   guide    to   building
d) From the quantitative results, it can also be
                                                                         information modeling for owners, managers,
     concluded        that      BIM      could     enhance
                                                                         designers, engineers, and contractors. New
     communication between design teams, as more
                                                                         Jersey: John Wiley & Sons.
     than 50 of the respondents agreed with this
     statement.                                                      Eastman, C., Teicholz, P., Sacks, R., & Liston, K.
e)   From the quantitative results, it can also be                       (2008). BIM Handbook: A Guide to Building
     concluded that drawings errors are to be                            Information Modeling for Owners, Managers,
     greatly adjusted through BIM implementation,                        Designers, Engineers, and Contractors. New
     as more than 50% of the respondents agreed to                       Jersey: John Wiley & Sons, Inc.
     this statement.
                                                                     Hietanen, J. D. (2008). Approaches to university-
f)   It can also be concluded that there is a lack of
                                                                         level BIM education.
     awareness of the capabilities of BIM tools in
     the industry, as more than 60% of the                           Ireneusz Czmoch, & Pekala, A. (2014). Traditional
     respondents agreed to the statement.                                Design versus BIM Based Design. Procedia
g) It can also be concluded that multi-software of                       Engineering.
     BIM does not lead to a decrease the efficiency.                 Li, J., Wang, Y., Wang, X., Luo, H., Kang, S.-C.,
h) It can also be concluded that BIM can be                              Wang Jun, Yi, J. (2014). Benefits of Building
     considered more suitable for the project                            Information Modelling in the Project Lifecycle:
     planning       according    to   the    design      than            Construction Projects in Asia. International
     AutoCAD         as   more    than      53%     of    the            Journal of Advanced Robotic Systems.
     respondents agree to the statement.
                                                                     Mark, B., & Mervyn, R. (2013). The Structural
                                                                         Engineer (Vol. 91).
                                                                42