Checklist For Installation of CI Pipe

The document is a checklist for the installation of CI pipes in the Mumbai BKC Office Development Project. It includes pre-installation and post-installation checks, as well as testing requirements to ensure proper installation and compliance with approved drawings. The checklist is designed to ensure quality assurance and safety during the installation process.

Uploaded by

vikaspathakssa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
74 views1 page

Checklist For Installation of CI Pipe

The document is a checklist for the installation of CI pipes in the Mumbai BKC Office Development Project. It includes pre-installation and post-installation checks, as well as testing requirements to ensure proper installation and compliance with approved drawings. The checklist is designed to ensure quality assurance and safety during the installation process.

Uploaded by

vikaspathakssa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

PROJECT:

Mumbai BKC Office Development Project - Main


Package Works

CHECKLIST FOR INSTALLATION OF CI PIPE


(FORMAT No.: L&T/TAISEI/QAQC/MEP/CL-013-R0 )

WIR No. : Date:


Service : Level:
Location :
Grid :
Drawing References :
Method Statement Ref.: :

Sr. No. DESCRIPTION YES / NO / NA Remarks

Pre installation Checklist

1 Diameter of Pipe to be checked before laying.

2 Pipe is free from all visible deflects on physical inspection.

3 Verify the location of pipe to be laid as per approved layout drawing.

4 Check the slope before laying of pipe as per drawing

5 Routing of the pipes are as per the approved shop drawings.

6 Cut the pipe of required length and smooth clean the edge of pipe and fitting

7 Ensure that the Spun yarn placed around the spigot of the pipe as back filler &
compound into the gap of the pipe joint using a caulking tool

8 Ensure that the Drip slea is properly mixed as supplied ration and filled within all joints
with smooth finish.

Post installation Checklist

9 Ensure that sufficient time has provided to cured the joints 1 to 3 hours depends on
atmospheric termperature

10 Ensure that spacing between supports are provided as per GFC drawing.

11 Ensure that anchors and thrust blocks is provided (if required) as per the GFC drawing.
(If applicable) for external part only

12 The back filling layer should not be over 300 mm. (If applicable) for external part only

13 Water sprinkling required after every two or three layers of back filling.(If applicable) for
external part only

Testing

14 Installed Pipe line has to be tested with Pressure test method (2 Hrs)

Checked by (L&T):

Site Execution

Safety

QA/QC
Name: Signature: Date: Time:
Reviewed by (TAISEI) / Approved by (TAISEI)

Name: Signature: Date: Time: