Repost Produksi Ob & CG 14 Februari 2025

The document is a work report for PT. Sinar Jaya Sempurna at the job site of PT. Selamat Jaya Persada for the period of February 1-28, 2025, detailing daily operations, equipment usage, and fuel consumption. It includes data on the number of trips made by dump trucks and tonly trucks, the total volume of coal moved, and operational remarks for each day. The report highlights various shifts, activities, and challenges faced during the operations, including equipment issues and weather conditions.

Uploaded by

Erlis Saputra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
25 views1 page

Repost Produksi Ob & CG 14 Februari 2025

The document is a work report for PT. Sinar Jaya Sempurna at the job site of PT. Selamat Jaya Persada for the period of February 1-28, 2025, detailing daily operations, equipment usage, and fuel consumption. It includes data on the number of trips made by dump trucks and tonly trucks, the total volume of coal moved, and operational remarks for each day. The report highlights various shifts, activities, and challenges faced during the operations, including equipment issues and weather conditions.

Uploaded by

Erlis Saputra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

PT.

SINAR JAYA SEMPURNA


JOB SITE PT. SELAMAT JAYA PERSADA-KETAHUN-BENGKULU UTARA
PERIODE : 01 - 28 FEBRUARI 2025
24
PT. SINAR JAYA SEMPURNA
OB DUMP TRUCK SJS COAL GETTING DUMP TRUCK SJS TONLY COAL GETTING TONLY IVECO COAL GETTING IVECO FUEL
TGL CUMMULATIVE (BCM) (LITER)
FUEL RATIO REMARKS
RITASE TOTAL BCM RITASE TOTAL BCM RITASE TOTAL BCM RITASE TOTAL BCM RITASE TOTAL BCM RITASE TONASE
TOTAL TONASE TOTAL TOTAL TOTAL TOTAL
DAY NIGHT DAY NIGHT DAY NIGHT DAY NIGHT DAY NIGHT DAY NIGHT DAY NIGHT DAY NIGHT DAY NIGHT DAY NIGHT DAY NIGHT DAY NIGHT DAY NIGHT TOTAL

1-Feb-2025 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0 NO AKTIVITAS LIBUR OFF

2-Feb-2025 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0 NO AKTIVITAS LIBUR OFF

3-Feb-2025 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0 NO AKTIVITAS LIBUR OFF

LOADING OB 2 FLEET 3 UNIT DT DAN 3 TONLY JARAK 100m,600m,1500m (3 UNIT OB DT START DT IVECO 09:31-17:27;DT 15 START 09:28-17:28; DT 19 START 07:26-17:31) (3 UNIT TONLY START 08:22-17: 30)( (2 UNIT EXSA LOADING OB) ( 2 UNIT DOZER
4-Feb-2025 83 - 581 - 581 - - - - 101 - 1.818 - 1.818 - - - - - 37 - 333 - 333 - - - - - 2.732 - 2.732 1981 0,73
SLIPERY).
SHIFT SIANG LOADING OB 2 FLEET 7 UNIT DT JARAK 100m DAN 2 TONLY JARAK 100m (7 UNIT OB DT START DT IVECO 07:50-17:28;DT 11 START 07:55 - 17:29; DT 15 START 07:57-17:28; DT 16 START 07:54-17:35; DT 19 START 07:52-17:18; DT 17 START
08:44 - 46 ; DT 06 START 14:37-17:23) (2 UNIT TONLY START 08:06-17: 17:32, TONLY 13 DRIVER SAKIT)( (2 UNIT EXSA LOADING OB) ( 2 UNIT DOZER SLIPERY). SHIFT MALAM LOADING OB 2 FLEET 4 UNIT DT JARAK 100m DAN 2 TONLY JARAK 100m
5-Feb-2025 161 15 1.127 105 1.232 - - - - 109 12 1.962 216 2.178 - - - - - 16 - 144 - 144 - - - - - 3.233 321 3.554 2572 0,72
(4 UNIT OB DT 15 START 19:36-20:11; DT 16 START 19:39-20:13; DT 19 START 19:35- 20:17; DT 06 19:35- 20:10) (2 UNIT TONLY START 19:42-20:20), 1 UNIT TONLY 13 DRIVER SAKIT)( (2 UNIT EXSA LOADING OB) ( 2 UNIT DOZER SLIPERY ). PUKUL 20:17
STANDBY HUJAN
SHIFT SIANG LOADING OB 2 FLEET 8 UNIT DT JARAK 1500 -100 m DAN 3 TONLY JARAK 100m (8 UNIT OB DT START DT IVECO 13:38-17:33;DT 06 START 13:36 -17:25; DT 12 START 13:45-17:22; DT 13 START 13:40 -17:30 ;DT 15 START 07:43-17:27; DT 16
6-Feb-2025 132 - 924 - 924 - - - - 109 - 1.962 - 1.962 - - - - - 12 - 108 - 108 - - - - - 2.994 - 2.994 2373 0,79 START 13:32-17:31; DT 19 START 13:32-17:31; DT 18 START 14:04 -15:53) (2 UNIT TONLY START 10:07 - 17:31, TONLY 14 start 13:14-17:21)( (2 UNIT EXSA LOADING OB) ( 2 UNIT DOZER SLIPERY). IDDLE HOURS ( PUKUL 07:00- 09:00 STANDBY KARYAWAN
TUNGGU JEMPUTAN, PUKUL 09:04-12:00 SLIPERY , PUKUL 13:00-13:35 P2H EXSA DAN PERBAIKAN FRONT)

SHIFT SIANG LOADING OB 3 FLEET 8 UNIT DT JARAK 1500 -100 m DAN 3 TONLY JARAK 100m (8 UNIT OB DT START DT IVECO 09:01-11:22;DT 06 START 08:55 -17:19; DT 12 START 08:28-17:08; DT 13 START 08:58 -17:16 ;DT 15 START 07:59-17:21; DT 16
START 08:56-17:22;DT 17 START 09:05 -14:59; DT 19 START 08:51-17:09 (2 UNIT TONLY START 08:02 - 17:18, TONLY 14 driver izin)( (2 UNIT EXSA LOADING OB) ( 2 UNIT DOZER SLIPERY). IDDLE HOURS ( PUKUL 07:00- 08:55 EXSA 09 BD TIDAK BISA
7-Feb-2025 178 33 1.246 231 1.477 - - - - 98 21 1.764 378 2.142 - - - - - 7 63 - 63 - - - - - 3.073 609 3.682 2295 0,62
START). SHIFT MALAM LOADING OB 2 FLEET 5 DT JARAK 1500M DAN TONLY 2 UNIT JARAK 100 M (5 UNIT DT 06 START 19:40 - 21:02; DT 13 START 19:42-08:26; DT 15 START 19:41-21:03, DT 16 START 19:38 - 20:57, DT 19 START 19:37 - 20:55) (2 UNIT
TONLY START 19:44 - 20:59, TONLY 14 driver izin)( (2 UNIT EXSA LOADING OB) ( 2 UNIT DOZER DOZING).
SHIFT SIANG LOADING OB 2 FLEET 7 UNIT DT JARAK 1500 DAN 3 TONLY JARAK 100m (7 UNIT OB DT 06 START 13:17 -17:08; DT 12 START 13:28-17:08; DT 13 START 13:58 -17:16 ;DT 11 START 13:29-17:19; DT 12 START 13:26-17:14, DT 13 START 13:13-17:16
8-Feb-2025 88 - 616 - 616 - - - - 55 - 990 - 990 - - - - - - - - - - - - - - - 1.606 - 1.606 1430 0,89 ;DT 15 START 13:12-17:01; DT 16 START 13:20-17:20;DT 19 STRAT 13:24-17:10) (2 UNIT TONLY START 13:27 - 17:28, TONLY 14 driver izin) ( (2 UNIT EXSA LOADING OB, EXSA 06 GENERAL) ( 2 UNIT DOZER DOZING, 1 UNIT D6G SUPPORT FRONT ).(IDDLE
HOURS PUKUL07:10 CUACA MENDUNG, 10:15-12:00 SLIPPERY )

SHIFT SIANG LOADING OB 2,3 FLEET 10 UNIT DT JARAK 1500 DAN LOADING CG 1 FLEEET TONLY JARAK 500m (9 UNIT OB DT 06 START 07:53-17:21; DT 11 START 07:49-08:09; DT 12 START 07:48-17:06; DT 13 START 07:58-17:54;DT 15 START 13:55-17:20 ;
9-Feb-2025 224 - 1.568 - 1.568 - - - - 13 - 234 - 234 81 - 1.782 - 1.782 8 - 72 - 72 - - - - - 1.874 - 1.874 2673 1,43 DT 16 START 17:52-17:23;DT 17 START 08:56-15:37; DT 18 START 07:45-13:32,DT 19 START 08:09-11:26 ) (3 UNIT TONLY START 08:28 - 17:36) ( (EXSA 09 LOADING OB, EXSA 06 LOADING CG, DOSSAN 08 GENERAL) ( 2 UNIT DOZER DOZING,).(IDDLE HOURS
PUKUL 07:00 - 08:28 ISI FEUL TONLY DAN CLEANING BB)

SHIFT SIANG LOADING 2 FLEET OB DAN 1 FLEET CG 9 UNIT DT JARAK 1500 DAN 3 TONLY JARAK 100m (9 UNIT OB DT 06 START 14:50 -17:17; DT 12 START 14:58-17:09; DT 13 START 14:42 -17:21 ;DT 15 START 14:54-17:32; DT 16 START 14:52-17:28;DT 01
10-Feb-2025 70 - 490 - 490 - - - - - 18 - 324 - 324 35 - 770 - 770 8 - 72 - 72 - - - - - 886 - 886 1670 1,88 START 15:05-17:20,DT 11 START 14:11-17:15;DT 19 START 16:26-17:18, DT IVECO START 14:46-17:15) (3 UNIT TONLY 13 START 10:53-17:23, TONLY 14 START 11:03-17:28, TONLY 15 START 11:19-17:32) ( (2 UNIT EXSA LOADING OB, EXSA 06 CG) ( 2 UNIT
DOZER DOZING ).(IDDLE HOURS PUKUL 07:00 -08:00 NUNGGU KARY WAN MESS DI PIT 6 DATANG, PUKUL 08:15 -14:40 SLIPERY UNTUK FLEET DT). TIDAK LONGSHIFT KARNA JALAN DISPOSAL PIT 3 BONY OK.

SHIFT SIANG LOADING 3 FLEET OB DAN 1 FLEET CG, 11 UNIT DT JARAK 1500 DAN 3 TONLY JARAK 100m (11 UNIT DT START OB DT 01 START 08:25-17:20; DT 06 START 07:58 -11:06;DT 11 START 10:14-17:22; DT 12 START 08:11-17:21; DT 13 START
07:56-17:07 ;DT 15 START 15:4917:20; DT 16 START 08:04-17:18;DT 19 START 08:08-17:13;DT 21 START 09:54-17:20;DT 23 START 09:08-17:23;DT IVECO START 08:07-17:22) (2 UNIT TONLY 13 START 08:11-17:18, TONLY 14 START 08:05-16:23, TONLY 15 START
11-Feb-2025 226 52 1.582 364 1.946 - - - - - 88 26 1.584 338 1.922 9 - 198 - 198 25 - 225 - 225 - - - - - 3.391 702 4.093 2931 0,72
08:01-17:23) ( (3 UNIT EXSA LOADING OB) ( 2 UNIT DOZER DOZING,D6G SUPPORT). SHIFT MALAM LOADING OB 3 FLEET , 8 DT JARAK 1500 M DAN 2 TONLY JARAK 100M (5 UNIT DT START 19:40-09:08,3 UNIT DT START 07:39 -08:56)(2 UNIT TONLY 19:44-09:12,
TONLY 14 BD PECAH BAN),( 3 UNIT EX SA LOADING OB, 2 UNIT DOZER DOZING)

SHIFT SIANG LOADING 2 FLEET OB , 9 UNIT DT JARAK 1500 DAN 3 TONLY JARAK 500m (9 UNIT DT START OB DT 01 START 07:59-17:26; DT 12 START 08:11-17:21; DT 15 START 07:53-17:22; DT 16 START 07:52-17:06;DT 19 START 07:50-17:19;DT 21 START
12-Feb-2025 202 54 1.414 378 1.792 - - - - - 102 25 1.836 450 2.286 - - - - 25 - 225 - 225 - - - - - 3.475 828 4.303 3070 0,71 07:49-17:26;DT 23 START 07:51-17:23;DT 14 START 10:41-17:01,DT IVECO START 07:56-17:18) (2 UNIT TONLY START 08:00-17:30, TONLY 14 START 10:53-17:26) ( (2 UNIT EXSA LOADING OB, EXSA 06 GENERAL ) ( 2 UNIT DOZER DOZING,D6G
SUPPORT). SHIFT MALAM LOADING OB 2 FLEET , 7 DT JARAK 1500 M DAN 3 TONLY JARAK 500M (5 UNIT DT START 19:34-20:59,2 UNIT DT START 19:36-21:01)( 3 UNIT TONLY 19:38-21:05),( 2 UNIT EX SA LOADING OB, EX SA 06 GENERAL, 2 UNIT DOZER DOZING)

SHIFT SIANG LOADING 3 FLEET OB , 11 UNIT DT JARAK 1500 DAN 3 TONLY JARAK 500m (11 UNIT DT START OB DT 01 START 08:10-17:24; DT 06 START 08:07-17:03;DT 11 START 08:04-17:14;DT 14 START 08:13-16:58; DT 15 START 08:09-17:24; DT 16
13-Feb-2025 263 - 1.841 - 1.841 - - - - - 135 - 2.430 - 2.430 - - - - - 21 - 189 - 189 - - - - - 4.460 - 4.460 3401 0,76 START 07:57-17:14;DT 19 START 08:41-17:12;DT 21 START 07:54-17:00;DT 23 START 07:53-17:15;DT 18 START 13:35-16:30,DT IVECO START 07:59-17:16) (2 UNIT TONLY START 08:02-17:29, TONLY 15 START 08:06-17:21) ( (3 UNIT EXSA LOADING OB) ( 2 UNIT
DOZER DOZING,D6G SUPPORT).

SHIFT SIANG LOADING 3 FLEET OB , 13 UNIT DT JARAK 1500 DAN 3 TONLY JARAK 500m (13 UNIT DT START OB DT 01 START 07:44-17:16; DT 06 START 07:48-17:07;DT 11 START 07:41-17:23;DT 14 START 07:56-16:57; DT 15 START 78:49-17:18; DT 16
START 07:51-16:44;DT 17 START 07:57-10:20;DT 18 START 09:51-11:22;DT 19 START 07:46-17:27;DT 21 START 07:55-17:16;DT 23 START 10:26-17:17;DT IVECO START 09:37-17:15,DT 12 START 07:49-17:19) (3 UNIT TONLY START 07:54-17:22,) ( (3 UNIT EXSA
14-Feb-2025 283 42 1.981 294 2.275 - - - - - 157 32 2.826 576 3.402 - - - - - 15 - 135 - 135 - - - - - 4.942 870 5.812 3834 0,66
LOADING OB) ( 2 UNIT DOZER DOZING).SHIFT MALAM LOADING OB 3 FLEET,7 UNIT DT JARAK 1500M DAN 3 UNIT TONLY JARAK 500m,1500m (DT 01 START 19:38-20:55;DT 06 START 19:45-20:52; DT 11 START 19:37-20:48;DT 12 START 19:40-17:50;DT 19
START 19:38-21:02; DT 21 START 19:35-21:04;DT 23 START 19:33-20:57) (3 UNIT TONLY 19:38-21:05)(3 UNIT EXSA LOADING OB)( 2 UNIT DOZING)

15-Feb-2025 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0
16-Feb-2025 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0
17-Feb-2025 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0
18-Feb-2025 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0

19-Feb-2025 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0
20-Feb-2025 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0
21-Feb-2025 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0

22-Feb-2025 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0

23-Feb-2025 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0

24-Feb-2025 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0

25-Feb-2025 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0

26-Feb-2025 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0

27-Feb-2025 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0

28-Feb-2025 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0

1-Mar-2025 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0

2-Mar-2025 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0

3-Mar-2025 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0

1.910 196 13.370 1.372 14.742 0 985 116 17.730 1.958 19.688 2750 174 - 1.566 - 1.566 0,00 32.666 3.330 35.996 28.230 0,78

TOTAL FUEL CONSUMPTION 6.948 FUEL CONSUMPTION 5.025 FUEL CONSUMPTION 623

FUEL RATIO 0,47 FUEL RATIO 0,26 - FUEL RATIO 0,40 FUEL RATIO

TOTAL OB ( BCM) TOTAL COAL GEETING SR TOTAL FUEL (LITER)


35.996 2.750 13 28.230
STRIPING
FUEL RATIO FUEL RATIO FUEL RATIO DI KURANGI BB
RATIO
0,78 0,00

OVERBURDEN
PIT 8 35.996 MTD ACH % PLAN
INJATAMA 35.996 29% 124.332

COAL GETTING

PIT 8 2.750 M/TON ACH % PLAN

INJATAMA 2.750 25% 10.902