Gui
Gui
MICRO PROJECT
Academic Year: 2023-24
Group Details:-
3
Maharashtra State Board of Technical Education, Mumbai
CERTIFICATE
the curriculum.
CERTIFICATE
the curriculum.
CERTIFICATE
the curriculum.
Marks
obtained
Marks for
Roll No by the Total
Sr. No. Group
individual Marks
Work
based on
viva
1. 2213
2. 2214
3. 2249
Signature: __________________________
Annexure –I
Part – A Micro-Project Proposal
o Title of the Project: Implement a Program For auto changing
Traffic Signals.
o Aims/Benefits of the Micro-Project (minimum 30-50 words):
In this micro project, there is a VB.Net Windows form
Application program for auto changing Traffic Signals.
Improved traffic flow: By using a VB.NET program to control
traffic signals, the timing of the signals can be optimized to
reduce congestion and improve traffic flow.
Increased safety: The program can be designed to prioritize safety
by adjusting the timing of the signals based on factors such as
traffic volume, speed, and pedestrian and cyclist traffic.
Collect information
from the internet,
2 01/03/24 12/03/24
textbook and reference
book
Implemented the
3 program of that 13/03/24 18/03/24
particular topic
Arrange screenshot of
code & output and
some details needed for
4 micro project (i.e.: E 18/03/24 24/03/24
valuation Sheet,
annexures, etc.) in MS
Word
https://aratideshmukh.wordpress.com/gadgraphical-
1. Website application-development/
2. Website https://www.perplexity.ai/library
Windows Form Application Program :
Output of code: