Pump Head Calculation Guide

The document outlines the transfer pump head calculation for a roof tank with a storage capacity of 15 m3 and a filling time of 2 hours. It details the filling rate, pipe specifications, and friction losses, resulting in a total head loss of 42.85 ft of water gauge. The calculations include both formula-based and chart-based pipe sizing methods, confirming a selected pipe size of 40 mm.

Uploaded by

jhigs amfufu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
45 views8 pages

Pump Head Calculation Guide

The document outlines the transfer pump head calculation for a roof tank with a storage capacity of 15 m3 and a filling time of 2 hours. It details the filling rate, pipe specifications, and friction losses, resulting in a total head loss of 42.85 ft of water gauge. The calculations include both formula-based and chart-based pipe sizing methods, confirming a selected pipe size of 40 mm.

Uploaded by

jhigs amfufu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 8

TRANSFER PUMP HEAD CALCUALTION

Storage Capacity of Roof Tank in M3 = 15

Assuming a filling time in Hrs = 2

Rate of filling (M3/Hr) = 7.5

Rate of filling (GPM) = 33

Pipe Diameter (inch) = 1 1/2 40

SIZE (Dia) Flow STRAIGHT LENGTH FRICTION FACT. FRICTION FACT. FRICTION LOSS
VALVES & EQT. LENGTH OF TOTAL EQT. LENGTH TOTAL EQT.
LOCATION SECTION QTY
FITTINGS FITTING (Ft.) OF FITTING (Ft.) LENGTH (Ft.)
(INCH) GPM MT FT (PSI OF H20/100) (Ft. OF H20/100) IN Ft. OF H20.

A-B 1 1/2 33 13 42.64 IV 3 1 3

ST 1 10 10

GV 0 87.4 2.0 4.6 4.04

NRV 1 16.8 16.8

90 E 3 5 15

HEAD LOSS IN FT OF WG 4.04

SAFETY FACTOR 20% 0.81

STATIC HEAD (VERTICAL HEIGHT) - FT 36.00

RESIDUAL HEAD (DISCHARGE HEAD) -FT 2.00

TOTAL HEAD LOSS IN FT OF WG 42.85

TOTAL HEAD LOSS IN METER OF WG 13.06

0091 888 4437724 deltaT MEP Technical Academy Bengaluru,India.


1-Pipe Sizing Using Formulae
OHT CAPACITY(m3) 15
Filling Time(Hours) 2
Discharge Through piping (Q)m3/sec 0.0020833333
Velocity(V)m/sec 1.5
We Know Q=A x V , Then A=Q/V
A(m2) 0.0014
We Know A=3.14XD2/4
Diameter(mm) 42.062872094
Selected Pipe Size 40mm

2 -Pipe Sizing Using Chart (IPC STANDARD)


Storage Capacity of Roof Tank in M3 15
Filling Time(Hours) 2
Rate of filling (M3/Hr) 7.5
Rate of filling (GPM) 33
Pipe Diameter (inch) 40mm
Friction(PSI) 2
A
B