Work Clearance (WC)
Project: Fereej Kulain 2 Buildings IR Ref.: PRJ 129/WC/MEP/xx
th
Date: 25 December 2024 Time: No. of Pages: 1 of 1
Subject:
Inspection Date: 25/12/2024 Inspection Time:
Description: Casting of Basement Ceiling Slab – Building A
Requested by: Mr. Mohamed Biomy – Project In-charge
Signature:
This is to secure clearance for:
Mechanical (FF/FA) Electrical HVAC CCTV
Reference Drawing (attached):
Location: Basement Ceiling – Building A
Grid
Level: Ground Floor Slab Room Ref: Other:
Line:
MEP Subcontractor Comments:
ALUSTAZ Representative:
Signature & Date:
Elec. Engr.
TARGET Representative Signature & Date:
Fire Alarm Engr.
A – Proceed / No Objection B – Not Possible / Not Ready
Document Ref: IDC-Work Clearance Revision: 0
Issue Date: August 2024
INTERNATIONAL DECORATION CONTRACTING CO – MAIN CONTRACTOR | P.O. BOX 4013
4TH FLOOR AL KUWARI BLDG | AL SADD, DOHA
TEL. T. 4444 0350 | F. 4442 1654 |
[email protected]