6.PLT Spinner
6.PLT Spinner
Part II -SPINNER
Prepared By
Mustafa Jaber Ali
PLT
Outline
• Introduction
• Objectives
• Operation methods
• Drift Run
• Types & the Main measurement
• Flow rate
• Temperature
• Pressure
• Capacitance
• Density
• Horizontal well
• Log quality
PLT
CTF
GR
FDR
PRC
PRT
FCB CFS
XTU
PLT
راح اتناول بالساليد الجاي حالة وحدة من تخص حالة بئر منتج بيه 3اماكن مثقبة A, B, and C .2
ويتضمن كل لوغات الفحص ( 3باصات) وراح يكون اله ردة فعل راح نتناولها على حدى حتى نفسر التالي:
C
PLT
Flow Spinner
• A spinner flowmeter tool contains an impeller, or spinner, for measuring wellbore
fluid velocity.
•During the processing, the RPS are converted into fluid velocity (ft/s) and the velocity
is converted into flow rate (b/d).
PLT
• If possible according with the minimum ID a larger spinner than the diameter
of the tool could be used.
1000 BPD
1500 BPD
Multipasses Method
QA+QB+Qc
Stationary Readings A QA
QB+Qc
Calibration Plot B QB
Qc
C QC
Apparent Fluid Velocity
Rates
Multipasses Method
Flowmeter (rps) Cable Speed
-15 60 120 (ft/min) -120
C2
4.- CALIBRATION PLOT
50
B 40
C3 30
Angular Velocity
Rps
Vs 20
Cable Speed
(ft/min)
C 10
-10
Calibration plot
شلون الزم يكون الكيرف
Spinner Response
RPS 70 - ! شلون هو راح يصير
60 -
50 -
40 -
30 -
20 -
Threshold value
It is speed
10 - Cable Speed
ft/min
-
-
-
-
-
-
-
restricted because
of fluid density 30 60 90 120 150 180 210
and viscosity
Calibration Plot
Flowmeter Cable Speed
-15 60 120 (ft/min) -120
(rps)
C1 Angular Velocity
Rps 50 C1
40 C2
A
30 C3
C2 20
C4
B 10
C3 5
VC1 VC2
Cable Speed
(ft/min)
C x x x x
-120 -90 -60 -30 30 60 90
VC3 VC4
-5
C4 -10
Rate Calculation
Flowmeter Apparent Velocity Flow rate Total Flow Rate
-15 (rps) 60 -10 (ft/min) 90 0 5000 0 (stb/d) 5000
(stb/d)
A QA QA = QC1 –QC2
Q=1.4* Vapp*ID²
B QB QB = QC2 –QC3
C QC Qc = QC3 –QC4
m = ∆y / ∆x
(x , y) =(0 , b)
X=0
Y=b