0% found this document useful (0 votes)
55 views15 pages

455_-Oct-2023

This document serves as a Product Manual for Portland Slag Cement in accordance with IS 455:2015, providing guidelines for certification and testing procedures. It outlines the necessary equipment, sampling guidelines, and inspection schemes to ensure compliance with Bureau of Indian Standards regulations. Additionally, it includes labeling requirements and control measures for manufacturers and packers of the cement.

Uploaded by

Shaheen Mave
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
55 views15 pages

455_-Oct-2023

This document serves as a Product Manual for Portland Slag Cement in accordance with IS 455:2015, providing guidelines for certification and testing procedures. It outlines the necessary equipment, sampling guidelines, and inspection schemes to ensure compliance with Bureau of Indian Standards regulations. Additionally, it includes labeling requirements and control measures for manufacturers and packers of the cement.

Uploaded by

Shaheen Mave
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 15

उत्पाद मानुयल

आई एस 455:2015 के अनुसार
पोर्ट लैंड स्लैग सीमेंर् के ललए

दस्तावेज़ संख्या– पी एम/आई एस 455/3/अक्टू बर 2023

भारतीय मानक ब्यूरो (अनुरूपता मूल्ांकन) लवलनयम की स्कीम-I के तहत यह उत्पाद मानुयल प्रमाणीकरण के
प्रचलन मे रीलत और पारदलशटता के सुसंगता सुलनलित करने के ललए सभी क्षेत्रीय/शाखा कायाटलयों एवं लाइसेन्स
धाररयों द्वारा संदभट सामग्री के रूप मे उपयोग लकया जाएगा। बीआईएस लाइसेन्स/प्रमाण पत्र प्राप्त करने के इच्छु क
भावी आवेदकों द्वारा भी इस दस्तावेज़ का उपयोग लकया जा सकता है।

PRODUCT MANUAL FOR PORTLAND SLAG


CEMENT ACCORDING TO IS 455: 2015

Document No.- PM/ IS 455/3/Oct 2023

This Product Manual shall be used as reference material by all Regional/Branch Offices &
licensees to ensure coherence of practice and transparency in operation of certification under
Scheme-I of Bureau of Indian Standards (Conformity Assessment) Regulations, 2018 for various
products. The document may also be used by prospective applicants desirous of obtaining BIS
certification licence/certificate

भारतीय मानक ब्यू रो


BUREAU OF INDIAN STANDARDS
मानक भवन, ९, बहादु र शाह ज़फ़र मार्ग
Manak Bhawan, 9, Bahadur Shah Zafar Marg
नई ददल्ली – ११०००२
New Delhi – 110002
PM/ IS 455/3/Oct 23

PRODUCT MANUAL FOR PORTLAND SLAG


CEMENT ACCORDING TO IS 455: 2015
This Product Manual shall be used as reference material by all Regional/Branch Offices &
licensees to ensure coherence of practice and transparency in operation of certification under
Scheme-I of Bureau of Indian Standards (Conformity Assessment) Regulations, 2018 for
various products. The document may also be used by prospective applicants desirous of
obtaining BIS certification licence/certificate.

1. Product : IS 455 : 2015


Title : PORTLAND SLAG CEMENT
No. of Amendments : 2

2. Sampling Guidelines:
1. Granulated Slag – IS 12089
a) Raw material : 2. Portland Cement Clinker – IS 16353
3. Ordinary Portland Cement – IS 269
4. Ground Granulated Blast Furnace Slag – IS 16714
b) Grouping guidelines : Not applicable
Physical Test - 8 kg
c) Sample Size :
Chemical Test – 1 kg

3. List of Test Equipment : Please refer Annex - A

Scheme of Inspection
4. : Please refer Annex - B
and Testing

5. Possible tests in a day :


(i) Insoluble Residue
(ii) Loss of ignition
(iii) Fineness
(iv) Setting time
6. Scope of the Licence :
“Licence is granted to use Standard Mark on Portland Slag Cement as per IS 455: 2015”.
Any other aspect required Transverse strength test is optional test as per agreement
as per the Standard between purchaser and manufacturer.

BUREAU OF INDIAN STANDARDS


Manak Bhawan, 9, Bahadur Shah Zafar
Marg, New Delhi – 110002
1
PM/ IS 455/3/Oct 23

ANNEX A

List of Test Equipment

Major test equipment required to test as per the Indian Standard

Sl
Tests used in with Clause Reference Test equipment
No.
1 Fineness Clause 7 Table 2 Blaine’s apparatus variable flow type
Stop watch with start-stop mechanism
Mercury for calibration
Balance, Standard weights
Standard Cement
Manometer liquid (di-butyl phthalate or light
mineral oil.)
Mercury of reagent grade or better, Pyknometer
Circular discs of filter paper of medium porosity
(mean pore diameter 7 µ).
Le-Chatelier’s flask
Constant temperature water bath to maintain
temp. within ± 0.1 ° C
2 Soundness by Autoclave Auto clave machine with thermostatic control to
Clause 7 Table 2 maintain pressure of 2.1 MPa for 3 hrs, pressure
to be attained within 1-1 ¼ hrs;
Pressure gauge 0-42 kg/cm2 LC = 0.4 kg/cm2
Humidity chamber with temperature & RH
control 27 ± 2 °C, RH 90 to 100 %
Standard bar 308 mm, max
Bar moulds 25 x 25 x 282 mm
Length comparator with dial gauge
Mineral oil for covering moulds
3 Soundness by Le-chatelier Method Le-Chatelier’s water bath preferably with
Clause 7 Table 2 thermostatic control raising temperature from
27 ± 2 0 C to boiling in 27 ± 3 minutes
Le-Chatelier’s moulds with weights and cover
glasses minimum 8 nos.
Humidity chamber with temperature & RH
control 27 ± 2 0 C, RH 90 to 100 %
Steel scale 12" (304.8 mm)

2
PM/ IS 455/3/Oct 23

4 Setting time Vicat apparatus


Clause 7 Table 2
Needle for Consistency, IST& FST testing
Moulds
Stop Watch
Balance – 1000 g ± 0.1 g and Standard Weights
1 mg to 500 gm
Gauging trowel of weight 210 ± 10 g
5 Compressive Strength Vibration machine with timer & cube mould
Clause 7 Table 2 fitting assembly 12000 ± 400 vibration per min.
Compressive Strength machine
Poking Rod , Petroleum Jelly
Proving ring with all accessories suitable for
calibration of CST machine
Tachometer
Cube Moulds 70.6 mm × 70.6 mm, Poking rod
Gauging trowel (210 ± 10 g)
gauging plate, stainless steel(non-perforated)
Standard sand grade 1, 2 and 3 (as per IS 650)
Curing tank of appropriate size with water
circulation arrangement
Graduated glass cylinders 150 to 200 ml
Humidity chamber with temperature & RH
Control 27 ± 2° C, RH 90 to 100 %
6 Transverse Strength Test Moulds
Clause 7, Table 2 Planetary Mixer, Standard Sand
Jolting Apparatus, Scraper, Demolding device as
per IS 4031 (Part 8)
7 IS 455 : 2015 General equipments for Cement testing
a) To control humidity & temperature 1. Humidity chamber with temperature & RH
in lab control 27 ± 2 °C, RH 90 to 100 %
2. Suitable arrangement to demonstrate
maintenance of temp. of 27 ± 2 ° C &
RH 65 ± 5% constantly
b) For cement Sampling Mixing trays –adequate size including trays of 24
partitions for keeping hourly samples
c) To control the residue of cement Sieves of size (300, 212, 150, 90, 75 & 45µ)
d) To measure temperature Thermometers
e) Lab ball mill (motorized) To grind the clinker, slag & gypsum sample in lab
ball mill for testing
f) To weigh the material 1. Platform type balance
2. Electrical balance
3 Weight box with weights (1 mg - 500 g)

3
PM/ IS 455/3/Oct 23

8 General test equipments for chemical testing


Clause 6 , Table 1 of IS 455 : 2015
Muffle Furnace with thermostatic control,
Range 0 – 1200° C
Oven with thermostatic control 0-300° C
Heater and hot plate
Distillation Assembly
Crucible: Platinum or Porcelain / silica
Filter paper (no 1,40,41,42)
Desiccators with cover & Desiccant
Water bath
pH meter/paper
Glasswares - volumetric flask -0-250 ml,
beaker 0-250 ml,
measuring cylinder 0-50,100,500, 1000 ml,
burette 0-25/50 ml,
conical flasks- 0-250 ml, pipette 0-5,10, 25, 50 ml
All chemicals required for complete chemical
analysis of cement
Tongs including platinum tipped tong
Wire gauge with asbestos sheet at the middle
Washing bottle
Mortar mixer- 4.75 l
Glass thermometer
All required chemicals as per IS 4032 for Portland
slag cement, Ordinary portland cement and
Portland clinker testing.
9 Granulated Slag a) Glass Content
Clause 4.1 and IS 12089 - Optical microscope min 100 X
- Bromoform
b) Chemical requirement
- As per IS 4032
10 Ground Granulated Blast Furnace Slag a) Glass Content
Clause 4.4 and IS 16714 - Optical microscope min 100 X
- Bromoform
b) Chemical requirement
- As per IS 4032
c) Mositure Content
- petri dish, Drying oven,
- weighing balance
The above list is indicative only and may not be treated as exhaustive.

4
PM/ IS 455/3/Oct 23

ANNEX B

SCHEME OF INSPECTION AND TESTING

1. LABORATORY - A laboratory shall be maintained which shall be suitably equipped


(as per the requirement given in column 2 of Table 1) and staffed, where different tests given
in the specification shall be carried out in accordance with the methods given in the
specification.

1.1 The manufacturer shall prepare a calibration plan for the test equipments. The following
equipments shall be calibrated at a frequency shown against each and records kept.

Sl. No. TEST EQUIPMENT FREQUENCY OF CALIBRATION


1. Blaine’s apparatus Daily with licensee’s own Standard cement sample and
monthly with standard cement samples supplied by
NCCBM.
2. Compressive Once in a month with Licensee’s own Proving Ring and
strength Testing the Proving Ring shall be Calibrated once in two years
machine from a NPL/NABL Accredited Calibrating body or NPL
or NPL accredited Proving Ring manufacturer.
3. Autoclave pressure Once in a month by licensee’s own dead weight pressure
gauge gauge tester OR once in six months from accredited
calibrating body or NPL/NABL accredited manufacturer
of such gauges.
4. Vibration machine Once in a month by licensee’s own Tachometer. The
tachometer shall be calibrated once in a year from
NPL/NABL accredited outside agency.
5. Dead weight Once in four years from NABL accredited Tester (if
pressure gauge available) Lab or OEM (original Equipment
Tester (if available) manufacturer) having NPL/NABL accredited calibrator.

2. TEST RECORDS – The manufacturer shall maintain test records in various formats, Form
1 to Form 18 for the tests carried out to establish conformity.

3. LABELLING AND MARKING – Labeling and marking shall be as given below:


3.1 STANDARD MARK - The Standard Mark, as specified by BIS, shall be printed or
stenciled on each bag or drum of Portland Slag Cement or on the label applied to it, provided
the material in each bag or package to which the mark thus applied conforms to the
specification. The size of the Standard Mark shall be either 160 x 120 mm or
80 x 60 mm for packing in quantity of 50 kg and above. For other packing of lower quantity,
a photographic reduction is permitted.

3.2 MARKING - As per the requirements of IS 455 : 2015.


3.2.1 In addition to above, following marking shall also be marked:
a) Name of original manufacturer of cement with BIS licence number in case of
repacking unit.
b) Licence no. CM/L-__________and details of BIS website, i.e. “For details of BIS
certification please visit www.bis.gov.in”.
c) Any other marking required under provisions of Legal Metrology Act, 2009 and
Legal Metrology (Packaged Commodities) Rules, 2011 framed thereunder.

5
PM/ IS 455/3/Oct 23

3.2.2 All the information including BIS Standard Mark except Manufacturers Registered
Trade Mark shall be applied on each bag in ORANGE COLOUR.

3.2.3 Marking of variable parameters on cement bags which are changing with production
schedule and done online (such as Date of manufacturing/Week number/Batch number,MRP,
Percentage of addition of slag) is permitted in BLACK COLOUR. However, all such marking
shall be conspicuous.

Note :
1. For each calendar year the first week shall be counted as 7 days from 1st of January and
subsequent weeks numbered serially accordingly. The bags shall be marked asW
0l/MM/YY…… W 51/MM/YY……. etc.
2. Label mentioned at 3.1 and 3.2 above shall be attached to the seal of the container. The
seal shall be of such a design that it shall automatically get destroyed on opening.
3. The colour of the bag and background colours should be in contrast to the colour of the
Standard Mark and the details so that the markings are conspicuous.

4. CONTROL UNIT –

4.1 For manufacturing units of Portland Slag Cement: The tests, as indicated in Table 1
attached and at the levels of control specified therein, shall be carried out on the whole
production of the factory which is covered by this scheme and appropriate records
maintained in accordance with clause 2 above.

4.2 For packing of Portland Slag Cement at bulk cement terminal: The tests, as indicated
in Table 2 attached and at the levels of control specified therein, shall be carried out on the
whole packing of Portland Slag Cement and appropriate records maintained in accordance with
clause 2 above.

4.2.1 For bulk packing units as per clause 4.2, all cement of one consignment received shall
constitute one batch.

4.2.2 Batch mixing may be permitted for packing units, which are extended packing terminals
of the same cement manufacturer (licensee) subject to packing units obtaining test certificates
from the manufacturer and keeping proper records. If the cement is received from different
units of the same manufacturer (different licensees) batch mixing of cement is not permitted.
The Batch integrity shall be ensured at all stages of packing and the packer shall maintain
appropriate controls and checks to ensure that there is no chance of mix up of different batches.
Adequate care shall be taken to avoid spoilage during handling, packing andstorage.

4.2.3 If bulk packing unit is instructed by BIS for suspension of licence due to the failure of
the samples, such instruction will automatically apply to the original manufacturer of the
cement, as per relevant suspension of licence guidelines. An undertaking to this effect shall be
obtained from the bulk packers and the original cement manufacturer.

4.2.4 Test Certificate of each original batch of cement shall be obtained from the supplier and
test results recorded. On the basis of tests and inspection, the decision regarding conformity
or otherwise of the consignment/batch to a given requirement shall be taken.

6
PM/ IS 455/3/Oct 23

4.3 WEIGHMENT – One filled bag from each nozzle shall be taken at random twice in each
shift of operation and weight checked in case of electronic packers with recorders. In all other
cases one filled bag from each nozzle shall be checked once in two hours. The records shall
be maintained in Form 1. The bag shall be so chosen for weighment such that bags from each
nozzle are taken for weighment. The weighing and packing machines shall be adjusted as and
when necessary in such a way that net quantity of each bag shall be in accordance with the
tolerances given in Annex B and clause 10 of IS 455 : 2015. Such adjustments for each nozzle
shall be recorded in Form 1 under remarks column.

4.3.1 For packing of Portland slag cement in bulk cement terminal weighment of hourly check
of mass of drums also shall be done in addition to weighment of bags mentioned in para 4.3
above. The records of weighments shall be maintained in Forms 12 and 14.

4.4 RAW MATERIALS

4.4.1 Routine analysis of various raw materials used in the manufacture of Portland slag
cement shall be made at intervals of a month or whenever there is a change in the
source/mine area stratification whichever is earlier and appropriate records of the analysis
and of the Physical composition of the mixtures shall be maintained in Form 2. This
analysis is not applicable for Packing Units of Portland slag cement at bulk cement
terminal.

4.5 HOMOGENEITY - Homogeneity of the mixture in a consignment shall be ensured


within the stipulated percent of slag addition. Percentage of slag addition shall be declared
every time and marked on the bags/package.

4.6. PACKING - The Cement shall be packed in bags as specified in clause 10 of


IS 455 : 2015. A test certificate either from the manufacturer or from any recognized
testing laboratory shall be received along with each consignment of bags. Alternatively the
samples of bags from each consignment shall be tested by the cement manufacturer either
in his own laboratory or any other BIS recognized laboratory before they are used for
packing cement. No testing would be necessary if the bags carry BIS Certification Mark.
The bag shall be in good condition at the time of packing.

5. LEVELS OF CONTROL - The tests as indicated in column 1 of Table 1 and the levels of
control in column 3 of Table 1, shall be carried out on the whole production of the factory
which is covered by this plan and appropriate records maintained in accordance with clause 2
above.

5.1. PRODUCTION DATA - The licensee shall send to BIS a statement of quantity produced,
marked and exported by him and the value thereof at the end of each quarter of the operative
period as per the enclosed proforma and shall also submit these details to BIS at the end of
the operative year duly authenticated by a Chartered Accountant.

6. REJECTIONS – Disposal of non-conforming product shall be done in such a way so as to


ensure that there is no violation of provisions of BIS Act, 2016.

7
PM/ IS 455/3/Oct 23

Table 1 – Levels of Control (Grinding/Packing Unit)

(1) (2) (3)


TEST DETAILS Test equipment RECOMMENDED LEVELS OF CONTROL
Clause Requirement Test Methods requirement Number Frequency Remark
Clause Reference R: required (or) of sample Cement Grinding Cement Packing
S: Sub-
contracting
permitted
4.1 Granulated Slag 4.1 IS 455 S One One sample shall be tested from each supplier once in a
IS 12089 month.
4.4 Ground Granulated 4.4 IS 455 S One One sample shall be tested from each supplier once in a
Blast Furnace Slag IS 16714 month.
4.2 Clinker 4.2 IS 455 R One Daily composite sample shall be tested for complete
IS 16353 requirement as per IS 16353. No further testing required if
accompanied with test certificate or ISI marked.
4.3 Ordinary Portland 4.3 IS 455 - - OPC shall be ISI marked and shall be accompanied with
Cement IS 269 manufacturer certificate. If OPC is produced in the same
factory, records as per relevant SIT shall be maintained.
6 Table 1 Chemical Requirement
i) Insoluble residue 6 IS 455 R One Daily Composite Weekly -
IS 4032 sample composite sample
ii) Magnesia 6 IS 455 R One Daily Composite Weekly -
IS 4032 sample composite sample

iii) Total Sulphur content 6 IS 455 R One Daily Composite Weekly -


calculated as sulphuric IS 4032 sample composite sample
anhydride (SO3)
iv) Sulphide Sulphur (S) 6 IS 455 R One Daily Composite Weekly -
IS 4032 sample composite sample
v) Loss on ignition 6 IS 455 R One Daily Composite Weekly -
IS 4032 sample composite sample

8
PM/ IS 455/3/Oct 23

vi) Chloride Content 6 IS 455 R One - Weekly This test shall


IS 4032 composite sample also be carried
out whenever
there is any
change in source
of any raw
material.
vii) Alkali Content 6 - S One - - Pl see note under
Table 1 of IS 455:
2015.
7, Table 2 Physical Requirement
i) Fineness 7 IS 455 R One 1. Every alternate Daily Composite -
IS 4031 (Part 2) hourly from each mill sample
separately.
2. Daily Composite
sample
ii) Soundness 7 IS 455 R One Daily Composite Daily Composite -
(Le-Chatelier method IS 4031(Part 3) sample sample
and Autoclave
method)
iii) Setting Time 7 IS 455 R One One sample per shift Daily Composite -
IS 4031 (Part 5) (Composite sample) sample
iv) Compressive strength 7 IS 455 R One Daily Composite Daily Composite -
IS 4031 (Part 6) sample sample
v) Transverse strength 7 IS 455 S One Weekly composite Weekly -
(Optional) IS 4031(Part 8) sample composite sample
NOTES –
1. Composite sample shall be made out of hourly samples for the required period (Pl see IS 3535 Methods of sampling hydraulic cements).
If cement is manufactured using same proportion of raw materials from more than one cement mill, sample from each mill shall be tested for fineness as per the
above table. For all other parameters composite samples from all the mills shall be tested.
If cement is manufactured using different proportion of raw materials from more than one cement mill, sample from each mill shall be tested for all requirements
as per the above table.
2. For manufacturing units where there is no packing silo and cement is packed directly from cement grinding, the frequency of tests specified for cement grinding
stage would apply for the various tests to be carried out on samples taken from cement mill spouts along with weekly chloride content test.

9
PM/ IS 455/3/Oct 23

Table 2 Level of Control (Bulk Packing Unit)

(1) (2) (3)


TEST DETAILS Test equipment RECOMMENDED LEVELS OF CONTROL
Clause Requirement Test Methods requirement Number of Frequency Remarks
Clause Reference R: required (or) S: samples
Sub-contracting
permitted
6 , Table 1 (i) Insoluble 6 IS 455 R One Each batch To be tested in laboratory at bulk
Residue IS 4032 terminal packing unit.
6, Table 1 (v) Loss on 6 IS 455 R One Each batch
Ignition IS 4032
7, Table 2 (i) Fineness 7 IS 455 S One Each batch -
IS 4031(Part 2)
7, Table 2 (ii) Soundness 7 IS 455 S One Each batch
IS 4031(Part 3)
7, Table 2 (iii) Setting Time 7 IS 455 S One Each batch
IS 4031(Part 5)
7, Table 2 (iv) Compressive 7 IS 455 S One Each batch
strength IS 4031(Part 6)

10
PM/ IS 455/3/Oct 23

Form No. 1
FORMAT FOR MAINTENANCE OF TEST RECORDS WEIGHMENT CONTROL AT PACKING STAGE

Date Shift Time (Hourly) No. of Bags Net mass of bags from nozzles Remark.

Form No. 2
RAW MATERIAL TESTING

Date of receipt of Date of Name of Material Source of supply and consignment Details of analysis for specified requirements
material testing No.

Form 3
PRODUCTION DATA
(POST GRINDING DETAILS OF PRODUCTION ACCEPTED AND REJECTED FOR STANDARD MARK)
Shift Quantity Passed for Standard mark Rejected Remark

Form No. 4
CLINKER CHEMICAL COMPOSITION (DAILY COMPOSITE SAMPLE)

Date of Total loss on Insoluble Alkali C3S C3 A C3S+ SO3 MgO Chloride Free LSF Alumina Sample Remarks
manufacture ignition residue content C2 S lime factor Pass/Fail
as
Na2O
@

@ Alkali content test may be conducted as and when required by purchaser

11
PM/ IS 455/3/Oct 23

Form No. 5
CLINKER GROUND WITH GYPSUM (DAILY COMPOSITE SAMPLE)
Date of Fineness Soundness Setting time Compressive strength Sample Remark
grinding Le-Chatelier Autoclave Initial Final 3 days 7 days 28 days Pass/Fail

Form 6
PORTLAND SLAG CEMENT (GRINDING) (Daily/Weekly Composite sample)
Date of Name of IR MgO Total Sulphide LOI Chloride Alkali Fineness Soundness Setting Compressive Transverse Sample Action
grinding Raw Sulphur Sulphur Content content (Le- Time strength Strength Pass/Fail taken if
Material calculated S @ chatelier & Initial & sample
as SO3 Autoclave) Final fails

@ Alkali content test may be conducted as and when required by purchaser


Form No 7
PORTLAND SLAG CEMENT GRINDING (For Alternate Hourly Sample)

Date of Time Fineness Setting Time Sample Mode of disposal or action taken if sample fails
grinding Initial & Final Pass/Fail

Form No 8
PORTLAND SLAG CEMENT PACKING STAGE (Daily/Weekly Composite Sample)
Date of Name of IR MgO Total Sulphide LOI Chloride Alkali Fineness Soundness Setting Compressive Transverse Sample Mode of
Packing Raw Sulphur Sulphur Content content (Le- Time strength Strength Pass/ disposal or
Material calculated S @ chatelier & Initial & Fail action taken
as SO3 Autoclave) Final if sample
fails

@ Alkali content test may be conducted as and when required by purchaser

12
PM/ IS 455/3/Oct 23

Form No 9
CALIBRATION

Sl. Date of Result of Calibration (Test records indicating details of standard values and Name of equipment Sl.No.
No calibration observed values for each equipment to be kept in proforma for which Action taken if equipment (If any) &
various columns be devised; as required) found defective Remarks

Note : The above records are to be kept separately for each equipment.

RECORDS TO BE MAINTAINED AS PER TABLE-2 OF SIT (BY BULK PACKING UNIT)

Form No. 10
FORMAT FOR MAINTENANCE OF TEST RECORDS WEIGHMENT CONTROL AT PACKING STAGE
HOURLY CHECK OF MASS OF DRUMS
Date Time (Hourly) Condition of Drums Net quantity of cement Record of calibration of weighing scale and Date of calibration.

Form No. 11
FORMAT FOR MAINTENANCE OF RECORDS FOR THE CONDITIONS OF THE EMPTY DRUMS/BULKERS
FOR PACKING CEMENT
Date No. of empty drums/Bulkers checked No. of empty drums/Bulkers rejected Reasons/Remarks Sign of firms inspector

13
PM/ IS 455/3/Oct 23

Form No. 12
FORMAT FOR MAINTENANCE OF TEST RECORDS WEIGHMENT CONTROL AT PACKING STAGE
HOURLY CHECK OF MASS OF BAGS
Date Shift Time(Hourly) No of Bags Net quantity of Bags from Nozzles Records of calibration/date of calibration of nozzles

Form No. 13
RECEIPT OF CEMENTS

Date of receipt Batch No. Supply received from Test Certificate No

Form No. 14
CEMENT DISPATCH DATA FROM PACKING

Date Quantity Passed for Standard Mark Rejected (if any) Reasons for not marking/Method of disposal

Form No 15 & 16
TEST DONE AT FACTORY (At receipt stage and at bulk packing terminal)
Date Batch No. LOI IR Fineness Setting Time Remarks

Form No 17 & 18
PORTLAND SLAG CEMENT (PHYSICAL TEST REPORT) (At receipt stage and at bulk packing terminal)
Date Batch No. Test Report Soundness Compressive Strength Remarks
LC AC 3 days 7 days 28 days

Note-1: Sub-contracting is permitted to a laboratory recognized by the Bureau or Government laboratories empaneled by the Bureau.
Note-2: The control unit and levels of control as decided by the Bureau are obligatory to which the licensee shall comply with.

14

You might also like