455_-Oct-2023
455_-Oct-2023
आई एस 455:2015 के अनुसार
पोर्ट लैंड स्लैग सीमेंर् के ललए
भारतीय मानक ब्यूरो (अनुरूपता मूल्ांकन) लवलनयम की स्कीम-I के तहत यह उत्पाद मानुयल प्रमाणीकरण के
प्रचलन मे रीलत और पारदलशटता के सुसंगता सुलनलित करने के ललए सभी क्षेत्रीय/शाखा कायाटलयों एवं लाइसेन्स
धाररयों द्वारा संदभट सामग्री के रूप मे उपयोग लकया जाएगा। बीआईएस लाइसेन्स/प्रमाण पत्र प्राप्त करने के इच्छु क
भावी आवेदकों द्वारा भी इस दस्तावेज़ का उपयोग लकया जा सकता है।
This Product Manual shall be used as reference material by all Regional/Branch Offices &
licensees to ensure coherence of practice and transparency in operation of certification under
Scheme-I of Bureau of Indian Standards (Conformity Assessment) Regulations, 2018 for various
products. The document may also be used by prospective applicants desirous of obtaining BIS
certification licence/certificate
2. Sampling Guidelines:
1. Granulated Slag – IS 12089
a) Raw material : 2. Portland Cement Clinker – IS 16353
3. Ordinary Portland Cement – IS 269
4. Ground Granulated Blast Furnace Slag – IS 16714
b) Grouping guidelines : Not applicable
Physical Test - 8 kg
c) Sample Size :
Chemical Test – 1 kg
Scheme of Inspection
4. : Please refer Annex - B
and Testing
ANNEX A
Sl
Tests used in with Clause Reference Test equipment
No.
1 Fineness Clause 7 Table 2 Blaine’s apparatus variable flow type
Stop watch with start-stop mechanism
Mercury for calibration
Balance, Standard weights
Standard Cement
Manometer liquid (di-butyl phthalate or light
mineral oil.)
Mercury of reagent grade or better, Pyknometer
Circular discs of filter paper of medium porosity
(mean pore diameter 7 µ).
Le-Chatelier’s flask
Constant temperature water bath to maintain
temp. within ± 0.1 ° C
2 Soundness by Autoclave Auto clave machine with thermostatic control to
Clause 7 Table 2 maintain pressure of 2.1 MPa for 3 hrs, pressure
to be attained within 1-1 ¼ hrs;
Pressure gauge 0-42 kg/cm2 LC = 0.4 kg/cm2
Humidity chamber with temperature & RH
control 27 ± 2 °C, RH 90 to 100 %
Standard bar 308 mm, max
Bar moulds 25 x 25 x 282 mm
Length comparator with dial gauge
Mineral oil for covering moulds
3 Soundness by Le-chatelier Method Le-Chatelier’s water bath preferably with
Clause 7 Table 2 thermostatic control raising temperature from
27 ± 2 0 C to boiling in 27 ± 3 minutes
Le-Chatelier’s moulds with weights and cover
glasses minimum 8 nos.
Humidity chamber with temperature & RH
control 27 ± 2 0 C, RH 90 to 100 %
Steel scale 12" (304.8 mm)
2
PM/ IS 455/3/Oct 23
3
PM/ IS 455/3/Oct 23
4
PM/ IS 455/3/Oct 23
ANNEX B
1.1 The manufacturer shall prepare a calibration plan for the test equipments. The following
equipments shall be calibrated at a frequency shown against each and records kept.
2. TEST RECORDS – The manufacturer shall maintain test records in various formats, Form
1 to Form 18 for the tests carried out to establish conformity.
5
PM/ IS 455/3/Oct 23
3.2.2 All the information including BIS Standard Mark except Manufacturers Registered
Trade Mark shall be applied on each bag in ORANGE COLOUR.
3.2.3 Marking of variable parameters on cement bags which are changing with production
schedule and done online (such as Date of manufacturing/Week number/Batch number,MRP,
Percentage of addition of slag) is permitted in BLACK COLOUR. However, all such marking
shall be conspicuous.
Note :
1. For each calendar year the first week shall be counted as 7 days from 1st of January and
subsequent weeks numbered serially accordingly. The bags shall be marked asW
0l/MM/YY…… W 51/MM/YY……. etc.
2. Label mentioned at 3.1 and 3.2 above shall be attached to the seal of the container. The
seal shall be of such a design that it shall automatically get destroyed on opening.
3. The colour of the bag and background colours should be in contrast to the colour of the
Standard Mark and the details so that the markings are conspicuous.
4. CONTROL UNIT –
4.1 For manufacturing units of Portland Slag Cement: The tests, as indicated in Table 1
attached and at the levels of control specified therein, shall be carried out on the whole
production of the factory which is covered by this scheme and appropriate records
maintained in accordance with clause 2 above.
4.2 For packing of Portland Slag Cement at bulk cement terminal: The tests, as indicated
in Table 2 attached and at the levels of control specified therein, shall be carried out on the
whole packing of Portland Slag Cement and appropriate records maintained in accordance with
clause 2 above.
4.2.1 For bulk packing units as per clause 4.2, all cement of one consignment received shall
constitute one batch.
4.2.2 Batch mixing may be permitted for packing units, which are extended packing terminals
of the same cement manufacturer (licensee) subject to packing units obtaining test certificates
from the manufacturer and keeping proper records. If the cement is received from different
units of the same manufacturer (different licensees) batch mixing of cement is not permitted.
The Batch integrity shall be ensured at all stages of packing and the packer shall maintain
appropriate controls and checks to ensure that there is no chance of mix up of different batches.
Adequate care shall be taken to avoid spoilage during handling, packing andstorage.
4.2.3 If bulk packing unit is instructed by BIS for suspension of licence due to the failure of
the samples, such instruction will automatically apply to the original manufacturer of the
cement, as per relevant suspension of licence guidelines. An undertaking to this effect shall be
obtained from the bulk packers and the original cement manufacturer.
4.2.4 Test Certificate of each original batch of cement shall be obtained from the supplier and
test results recorded. On the basis of tests and inspection, the decision regarding conformity
or otherwise of the consignment/batch to a given requirement shall be taken.
6
PM/ IS 455/3/Oct 23
4.3 WEIGHMENT – One filled bag from each nozzle shall be taken at random twice in each
shift of operation and weight checked in case of electronic packers with recorders. In all other
cases one filled bag from each nozzle shall be checked once in two hours. The records shall
be maintained in Form 1. The bag shall be so chosen for weighment such that bags from each
nozzle are taken for weighment. The weighing and packing machines shall be adjusted as and
when necessary in such a way that net quantity of each bag shall be in accordance with the
tolerances given in Annex B and clause 10 of IS 455 : 2015. Such adjustments for each nozzle
shall be recorded in Form 1 under remarks column.
4.3.1 For packing of Portland slag cement in bulk cement terminal weighment of hourly check
of mass of drums also shall be done in addition to weighment of bags mentioned in para 4.3
above. The records of weighments shall be maintained in Forms 12 and 14.
4.4.1 Routine analysis of various raw materials used in the manufacture of Portland slag
cement shall be made at intervals of a month or whenever there is a change in the
source/mine area stratification whichever is earlier and appropriate records of the analysis
and of the Physical composition of the mixtures shall be maintained in Form 2. This
analysis is not applicable for Packing Units of Portland slag cement at bulk cement
terminal.
5. LEVELS OF CONTROL - The tests as indicated in column 1 of Table 1 and the levels of
control in column 3 of Table 1, shall be carried out on the whole production of the factory
which is covered by this plan and appropriate records maintained in accordance with clause 2
above.
5.1. PRODUCTION DATA - The licensee shall send to BIS a statement of quantity produced,
marked and exported by him and the value thereof at the end of each quarter of the operative
period as per the enclosed proforma and shall also submit these details to BIS at the end of
the operative year duly authenticated by a Chartered Accountant.
7
PM/ IS 455/3/Oct 23
8
PM/ IS 455/3/Oct 23
9
PM/ IS 455/3/Oct 23
10
PM/ IS 455/3/Oct 23
Form No. 1
FORMAT FOR MAINTENANCE OF TEST RECORDS WEIGHMENT CONTROL AT PACKING STAGE
Date Shift Time (Hourly) No. of Bags Net mass of bags from nozzles Remark.
Form No. 2
RAW MATERIAL TESTING
Date of receipt of Date of Name of Material Source of supply and consignment Details of analysis for specified requirements
material testing No.
Form 3
PRODUCTION DATA
(POST GRINDING DETAILS OF PRODUCTION ACCEPTED AND REJECTED FOR STANDARD MARK)
Shift Quantity Passed for Standard mark Rejected Remark
Form No. 4
CLINKER CHEMICAL COMPOSITION (DAILY COMPOSITE SAMPLE)
Date of Total loss on Insoluble Alkali C3S C3 A C3S+ SO3 MgO Chloride Free LSF Alumina Sample Remarks
manufacture ignition residue content C2 S lime factor Pass/Fail
as
Na2O
@
11
PM/ IS 455/3/Oct 23
Form No. 5
CLINKER GROUND WITH GYPSUM (DAILY COMPOSITE SAMPLE)
Date of Fineness Soundness Setting time Compressive strength Sample Remark
grinding Le-Chatelier Autoclave Initial Final 3 days 7 days 28 days Pass/Fail
Form 6
PORTLAND SLAG CEMENT (GRINDING) (Daily/Weekly Composite sample)
Date of Name of IR MgO Total Sulphide LOI Chloride Alkali Fineness Soundness Setting Compressive Transverse Sample Action
grinding Raw Sulphur Sulphur Content content (Le- Time strength Strength Pass/Fail taken if
Material calculated S @ chatelier & Initial & sample
as SO3 Autoclave) Final fails
Date of Time Fineness Setting Time Sample Mode of disposal or action taken if sample fails
grinding Initial & Final Pass/Fail
Form No 8
PORTLAND SLAG CEMENT PACKING STAGE (Daily/Weekly Composite Sample)
Date of Name of IR MgO Total Sulphide LOI Chloride Alkali Fineness Soundness Setting Compressive Transverse Sample Mode of
Packing Raw Sulphur Sulphur Content content (Le- Time strength Strength Pass/ disposal or
Material calculated S @ chatelier & Initial & Fail action taken
as SO3 Autoclave) Final if sample
fails
12
PM/ IS 455/3/Oct 23
Form No 9
CALIBRATION
Sl. Date of Result of Calibration (Test records indicating details of standard values and Name of equipment Sl.No.
No calibration observed values for each equipment to be kept in proforma for which Action taken if equipment (If any) &
various columns be devised; as required) found defective Remarks
Note : The above records are to be kept separately for each equipment.
Form No. 10
FORMAT FOR MAINTENANCE OF TEST RECORDS WEIGHMENT CONTROL AT PACKING STAGE
HOURLY CHECK OF MASS OF DRUMS
Date Time (Hourly) Condition of Drums Net quantity of cement Record of calibration of weighing scale and Date of calibration.
Form No. 11
FORMAT FOR MAINTENANCE OF RECORDS FOR THE CONDITIONS OF THE EMPTY DRUMS/BULKERS
FOR PACKING CEMENT
Date No. of empty drums/Bulkers checked No. of empty drums/Bulkers rejected Reasons/Remarks Sign of firms inspector
13
PM/ IS 455/3/Oct 23
Form No. 12
FORMAT FOR MAINTENANCE OF TEST RECORDS WEIGHMENT CONTROL AT PACKING STAGE
HOURLY CHECK OF MASS OF BAGS
Date Shift Time(Hourly) No of Bags Net quantity of Bags from Nozzles Records of calibration/date of calibration of nozzles
Form No. 13
RECEIPT OF CEMENTS
Form No. 14
CEMENT DISPATCH DATA FROM PACKING
Date Quantity Passed for Standard Mark Rejected (if any) Reasons for not marking/Method of disposal
Form No 15 & 16
TEST DONE AT FACTORY (At receipt stage and at bulk packing terminal)
Date Batch No. LOI IR Fineness Setting Time Remarks
Form No 17 & 18
PORTLAND SLAG CEMENT (PHYSICAL TEST REPORT) (At receipt stage and at bulk packing terminal)
Date Batch No. Test Report Soundness Compressive Strength Remarks
LC AC 3 days 7 days 28 days
Note-1: Sub-contracting is permitted to a laboratory recognized by the Bureau or Government laboratories empaneled by the Bureau.
Note-2: The control unit and levels of control as decided by the Bureau are obligatory to which the licensee shall comply with.
14