ENERGY REGULATORY COMMISSION
Market Operations Service
Licensing Division
CERTIFICATE OF COMPLIANCE (COC) APPLICATION
CHECKLIST OF REQUIREMENTS FOR SELF-GENERATING FACILITIES (SGFs)
Name of Company
Lot/Block/Phase Street Name Barangay / Subdivision
Business Address
Municipality/City Province Zip Code
Name of SGF
Lot/Block/Phase Street Name Barangay / Subdivision
Particulars Remarks
A. GENERAL REQUIREMENTS
Name of Signatory:
1. SGF-COC Application
Position:
Form No. 1
Date:
B. TECHNICAL REQUIREMENTS
2. Distribution Utility (DU)
Acknowledgement that
the Entity informed the
DU of its SGF
C. OTHER REQUIREMENTS
3. Securities and
Exchange Commission
(SEC) issued
Certificate of
Registration (COR)
with Articles of
Incorporation /
Partnership and By-
Laws, and any
subsequent
amendments thereto,
or Business Name
Registration Certificate
(for Single
Proprietorship), Note: Applicable for SGF with aggregate installed
whichever is applicable capacity of 1 MW and above only
4. Latest General
Information Sheet
(GIS) of the Entity /
Company duly
stamped received by Note: Applicable for SGF with aggregate installed
the SEC capacity of 1 MW and above only
5. Environmental ECC
Compliance Certificate Reference No.:
Issued to:
(ECC) 4 duly issued by Date Issued:
the Department of Capacity:
Environment and
3 LEGEND:
Yes Submitted Document with Complete Entries/Data
No No submission
N/A Not Applicable
Inc Incomplete Document
4In accordance with the Memorandum Circular 005 July 2014 otherwise known as “Revised Guidelines for Coverage Screening
and Standardized Requirements under the Philippine EIS System,” and any amendments thereto.
Page 2 of 4
MOS-LD/Revised as of November 2023
Checklist of Requirements for COC Application – SGF
COMPLIANCE3
REQUIREMENT REMARKS
YES NO INC N/A
Natural Resources Note: Applicable for SGF with aggregate installed
(DENR) / Bangsamoro capacity of 1 MW and above only
Autonomous Region in
Muslim Mindanao
(BARMM)
6. Permit to Operate PTO
(PTO) 5 duly issued by Reference No.:
the Department of Issued to:
Environment and Date Issued:
Natural Resources Valid Until:
(DENR) / Bangsamoro
Autonomous Region in
Muslim Mindanao
(BARMM)
Evaluator’s Comment/Recommendation:
PARTICULARS REMARKS
Confirmation of
Date Issued:
Completeness Email (CCE)
SOA No.:
Date Issued:
☐ Date of Payment:
For Issuance of Statement
of Account (SOA) ☐ PhP 1,500.00 (100 kW and below)
☐PhP 5,000.00 (101 – 500 kW)
Amount Paid:
☐PhP 7,500.00 (501 – 999 kW)
☐PhP 10,000.00 (1000 kW and above)
Date Issued:
Deadline for
Notice of Incomplete Completion
☐ Pending Documents:
Submission Email (NISE)
1.
2.
3.
5In accordance with the Section 1, Rule XIX, Part VI of the IRR for RA 8749, otherwise known as “The Philippine Clean Air
Act of 1999,” and any amendments thereto; Applicable for oil-based, coal, biomass, geothermal, and natural gas Generation
Facilities except for standby stationary/portable/mobile/multi-purpose Generator set engines (1-15kW) used in small scale
operation (e.g., tower light, air compressors, pumps etc.)
Page 3 of 4
MOS-LD/Revised as of November 2023
Checklist of Requirements for COC Application – SGF
NOTE:
1. Ensure consistency of information across all documents (technical specifications, serial numbers,
name of applicants, etc.
2. In cases where the submitted document is issued to a different entity, other than the Applicant, a
written explanation must be submitted explaining the relationship of that entity to the Applicant,
accompanied with additional supporting documents that would substantiate the explanation
3. Only forms/documents with complete entries will be accepted; otherwise, it will be returned to the
applicant for re-submission of forms with complete entries
4. All documents must be submitted upon filing of the COC application
5. Within five (5) working days from sending the proof of payment, the Applicant shall submit to the
ERC’s Central Records Division one (1) set of original or certified true hard copies of its application
and supporting documents by personal service, registered or ordinary mail/private courier. (Section
8, Article XI of ERC Resolution No. 9, Series of 2020)
Page 4 of 4
MOS-LD/Revised as of November 2023
Checklist of Requirements for COC Application – SGF