BOQ 1 Unit KBS Kapasitas 500 Ton - 01 10 2024

This document is a Bill of Quantity for the construction of a 500 m³ Kernel Bulking Silo at PKS Lubuk Raja, detailing various civil works and construction tasks. It includes specifications for materials, quantities, and pricing for each component involved in the project. Additionally, it outlines project location, duration of work, and payment terms.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
40 views2 pages

BOQ 1 Unit KBS Kapasitas 500 Ton - 01 10 2024

This document is a Bill of Quantity for the construction of a 500 m³ Kernel Bulking Silo at PKS Lubuk Raja, detailing various civil works and construction tasks. It includes specifications for materials, quantities, and pricing for each component involved in the project. Additionally, it outlines project location, duration of work, and payment terms.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

BILL of QUANTITY

KERNEL BULKING SILO KAP. 500 M³


PKS LUBUK RAJA

CP : ALDI : 0813 6295 7242 / RAHMAN : 0812 6383 7187


NO URAIAN SATUAN VOLUME HARGA SATUAN TOTAL HARGA
I PEKERJAAN SIPIL
1 Galian tanah m³ 27.87 Rp - Rp -
2 Cerucuk gelam Ø 12 - 15 cm , Panjang 4 meter c/c 300 mm titik 256.00 Rp - Rp -
3 Urugan tanah kembali m³ 15.39 Rp - Rp -
4 Lantai kerja beton Ad. 1 : 3 : 5, tebal 50 mm m³ 12.28 Rp - Rp -
5 Pondasi setempat beton bertulang K-225, Uk. 1000 x 1000 x
350 mm, pembesian D 13 - 150 mm dan Pedestal Uk. 550 x m³ 9.96 Rp - Rp -
550 x 900 mm, pembesian 10 D 13 dan Ø 8 - 125 mm
6 Anchor Bolt Ø 7/8" panjang 500 mm pcs 64.00 Rp - Rp -
7 Sloof beton bertulang K-225, Uk. 200 x 400 mm, pembesian 10
Ø 12 mm danbertulang
Ø 8 - 125K-225
mm c/w Wiremesh M-6 2 layer, tebal m³ 2.53 Rp - Rp -
Lantai beton
8 200 mm m³ 44.00 Rp - Rp -
9 Pondasi setempat Aerasi Fan, beton bertulang K-225, Uk. 1.200
m³ 1.30 Rp - Rp -
x 1.800 x 600 mm, pembesian Ø 10 - 150 mm
SUB-TOTAL I Rp -
II PEKERJAAN KONSTRUKSI BULK SILO
A STRUKTUR DAN TIANG
1 MS Plate 12mm Thk (Baseplate Tiang) kg 482.22 Rp - Rp -
2 Colum WF 450 X 200 X 9 x 14 mm kg 2,411.33 Rp - Rp -
3 Colum WF 400 X 200 X 8 x 13 mm kg 6,282.14 Rp - Rp -
4 MS Plate 15mm Thk (Baseplate tiang ke body) kg 899.31 Rp - Rp -
5 H Beam 150x150x7x10 kg 995.97 Rp - Rp -
6 Siku 50x50x5 (Bracing) kg 454.96 Rp - Rp -
7 MS Plate 12mm Thk (Stiff. plate bracing) kg 190.56 Rp - Rp -
B BODY BULKING
1 MS Plate 8mm Thk (Chute) kg 5,715.42 Rp - Rp -
2 MS Plate 8mm Thk (Body bagian bawah) kg 1,977.65 Rp - Rp -
3 MS Plate 6mm Thk (Body) kg 11,844.78 Rp - Rp -
4 MS Plate 5mm Thk (Atap silo) kg 969.35 Rp - Rp -
5 UNP 100x50 (Rangka top silo) kg 697.82 Rp - Rp -
6 Siku 65x65x6 (Rangka top silo) kg 284.00 Rp - Rp -
7 Siku 50x50x5 (Rangka top silo) kg 127.26 Rp - Rp -
8 UNP 150x75 (Penguat ring body) kg 568.55 Rp - Rp -
9 Siku 100x100 x10 (Penguat ring Atas) kg 453.82 Rp - Rp -
10 MS Plate 3mm Thk (Ducting dan payung bagian dalam) kg 849.84 Rp - Rp -
11 Siku 75x75x7 (Support ducting bagian dalam) kg 531.60 Rp - Rp -
12 Ladder bagian dalam tangki Round Bar Ø 16 mm kg 29.86 Rp - Rp -
13 Pipa 12" sch 40 (Ventilasi samping) kg 1,004.03 Rp - Rp -
14 MS Plate 5mm Thk (Ventilasi atas) kg 156.39 Rp - Rp -
C MAN HOLE 1
1 MS Plate 6mm Thk kg 19.50 Rp - Rp -
2 Round Bar 19mm kg 2.23 Rp - Rp -
3 MS Plate 9 mm Thk (Engsel) kg 0.49 Rp - Rp -
4 Siku 50x50x5 kg 6.48 Rp - Rp -
D MAN HOLE 2
1 MS Plate 8mm Thk kg 23.91 Rp - Rp -
2 Round Bar 12mm kg 0.53 Rp - Rp -
3 Baut dan Mur M18 pcs 12.00 Rp - Rp -
E RAILING TOP
1 Siku 60x60x6 kg 164.98 Rp - Rp -
2 Flatbar 4x38 kg 36.30 Rp - Rp -
3 Pipa Black Steel Ø25 kg 74.32 Rp - Rp -
4 Pipa Black Steel Ø32 kg 192.98 Rp - Rp -
BILL of QUANTITY
KERNEL BULKING SILO KAP. 500 M³
PKS LUBUK RAJA

CP : ALDI : 0813 6295 7242 / RAHMAN : 0812 6383 7187


NO URAIAN SATUAN VOLUME HARGA SATUAN TOTAL HARGA
F LADDER
1 Pipa Black Steel Ø25 kg 73.20 Rp - Rp -
2 Pipa Black Steel Ø32 kg 163.28 Rp - Rp -
3 UNP 120x55x7 kg 255.00 Rp - Rp -
4 MS Check. Plate 4,5 mm Thk kg 387.57 Rp - Rp -
5 MS Plate 4mm Thk kg 94.77 Rp - Rp -
G OUTLET SILO
1 MS Plate 8mm Thk (corong outlet) kg 71.36 Rp - Rp -
2 Shaft Ø25mm x 556mm (10 pcs) kg 21.41 Rp - Rp -
3 Round Bar 19mm panjang 0,1m (10 pcs) kg 2.23 Rp - Rp -
4 MS Plate 12mm Thk (Flange plate) kg 12.40 Rp - Rp -
5 MS Plate 10mm Thk (Stiff. Flange Plate) kg 4.55 Rp - Rp -
6 Siku 75x75x8 (Flange sliding door) kg 12.64 Rp - Rp -
7 MS Plate 10mm Thk (Dudukan Flange Bearing) kg 25.48 Rp - Rp -
8 Pinion Rake pc 2.00 Rp - Rp -
9 Flange Bearing FY 30 SKF pc 2.00 Rp - Rp -
10 Round Bar 30mm (shaft pinion rake) kg 3.88 Rp - Rp -
11 Square Bar 20x20 panjang 500mm (Rel sliding door) kg 6.28 Rp - Rp -
12 MS Plate 12mm Thk uk. 342x500mm kg 16.62 Rp - Rp -
H PIPA INLET KERNEL DARI KERNEL SILO TO BULK SILO
1 Pipa Galvanis medium 6" kg 806.40 Rp - Rp -
2 UNP 150x75x6.5 (Suport Pipa) kg 1,176.00 Rp - Rp -
3 Siku 60x60x6 (Stifener Suport Pipa) kg 292.50 Rp - Rp -
4 Clamp Pipa 6" pcs 20.00 Rp - Rp -
5 Elbow 45 Galvanis medium 6" pcs 3.00 Rp - Rp -
6 Flange 6" pcs 12.00 Rp - Rp -
7 Fan Dry Kernel Transport Phoenix PHX B4 -760/100-100, CW
Elmot 45 KW/2P, Material Fan : M.s casing, M.s Impeller, MS
Inlet Cover Wiremesh M.s Channel Base, Belting & tapper lock Unit 1.00 Rp - Rp -
pully, FAG/Timken Bearing
SUB-TOTAL II Rp -
III LAIN-LAIN
Fan Aerasi Silo Fan Merk Phoenix Type Centrifugal, motor listrik
1 22 kW, 1.470 rpm Incld Electrical Instalation unit 1 Rp - Rp -
2 Cyclone : - One (1) unit cyclone of 800 mm dia.
- Fabricated from 6 mm thick m.s plate of welded conctruction.
- Top whirling chamber, flange in connection. unit 1
- Fitted with 4 mm thick m.s liner plate at cylindrical section.
Rp - Rp -
SUB-TOTAL III Rp -
IV CONSUMABLES
1 Baut dan Mur, Kawat Las, Gas Elpiji dan Oksigen dll. ls 1 Rp - Rp -
2 Pengujian Kubus Beton K-225 pcs 5 Rp - Rp -
SUB-TOTAL IV Rp -
V FINISHING
1 Cat Zinc Chromate kg 100 Rp - Rp -
2 Cat Finish Beebrand 1000 kg 200 Rp - Rp -
3 Thinner liter 75 Rp - Rp -
SUB-TOTAL V Rp -
TOTAL MATERIAL (I s/d V) Rp -

1 Mob - Demob Worker, Supervisor & Tools lot 1 Rp - Rp -

2 Transport Material lot 1 Rp - Rp -


3 Pabrikasi lot 1 Rp - Rp -
4 Jasa Bongkar lot 1 Rp - Rp -
5 Jasa Pasang dan Commissioning lot 1 Rp - Rp -
6 Finishing and Cleaning lot 1 Rp - Rp -
TOTAL JASA Rp -
TOTAL Rp -
PEMBULATAN Rp -
Lokasi pekerjaan Franco PKS Lubuk Raja
Jangka waktu pekerjaan Lama Pengerjaan 150 Hari
sistem pembayaran 95% Setelah BAST1 dan 5% Retensi 3 Bulan

NOTE : COR BETON MENGGUNAKAN MOBIL MIXER (MIXER TRUCK)