Format No.
EOT CRANE INSPECTION CHECKLIST TRANSRAIL/CONST/HSE/EOT-CHKL/031
Transrail Lighting Ltd. Rev. No: 01
Date: 01.04.2021
Name of Project: Date of Inspection:
Project Loc:
Inspected By:
SN. Description Yes No Remarks
1. Machine should be physically good & should have valid TPI
certificate.
2. SWL should be visible on either side.
3. Wire sling should be free from damage/rust.
4. Ensure Hook latch is available with hook or not?
5. Power cable should be free from defect.
6. Remote should be in good condition.
7. Audible horn should be in working condition.
8. Operator have suitable license/experience certificate.
9. Deflection test should be carried out.
10. Safe access and egress should be provided.
Operator HSE Officer Section/P&M I/C