BJ087-00-05-1-800 Acw DMW
BJ087-00-05-1-800 Acw DMW
PG
CP 301
4
21PAD10
B TG 21PAD10
21PAD10 CT 301
AA 002
AA 001
FROM : AUXILIARY COOLING WATER INLET (DM WATER) PAD10-166.5-5.40-IS 1239
DWG NO. BJ087-00-02-1-900
NEAR BOILER COLUMN
3
FROM ONE POINT
F 141 A
PAD41-166.5-5.40-IS 1239
PAD53-34.2-4.06-IS 1239
PAD63-48.8-4.05-IS 1239
PG PG PG PG PG PG PG
PAD21-34.2-4.06-IS1239
PAD31-34.2-4.06-IS1239
PAD11-60.8-4.5-IS1239
PAD40-34.2-4.06-IS1239
PAD42-166.5-5.40-IS 1239
PAD52-34.2-4.06-IS 1239
PAD62-34.2-4.06-IS 1239
PAD63-48.8-4.05-IS 1239
21PAD20 21PAD30 21PAD40 21PAD42 21PAD52 21PAD62 21PAD72
PG PG PG PG PG PG PG
CP 301 CP 301 CP 301 CP 301 CP 301 CP 301 CP 301
21PAD20
AA 001
21PAD30
AA 001
21PAD40
AA 001
21PAD42
AA 001
21PAD52
AA 001
21PAD62
AA 001
21PAD72
AA 001 Tushar Misra
21PAD75
PG
TG TG TG TG TG TG TG
A
REVIEWED WITHOUT COMMENTS
Release distribution prints.
2016.02.18
12:55:35
CP 301 21PAD30
21PAD20 21PAD40 21PAD42 21PAD52 21PAD62 21PAD72
4 CT 301
21PAD75 CT 301 CT 301 CT 301 CT 301 CT 301
B TG 21PAD75 CT 301
CT 301
AA 001
+05'30'
TO : AUXILIARY COOLING WATER OUTET (DM WATER)
DWG NO. BJ087-00-02-1-900
NEAR BOILER COLUMN
PAD75-168.3-5.40-IS 1239
REVIEWED WITH COMMENTS
FROM ONE POINT
PCA39-89.5-4.85-IS 1239
DWG NO : BJ087-00-02-1-900
PCA40-60.8-4.5-IS 1239
PCA15-219.1-4.85-IS 3589
PCA11-219.1-4.85-IS 3589
Information furnished in the drawing is
PCA33-89.5-4.85-IS1239
PCA21-115.0-5.4-IS 1239
3 3 1 4 noted.
F 224 A B D D F 335
5 1
P 6 P 6 E
D
T 30 T 30
2
Ø48.8-4.05-IS1239
C
(TYP)
Ø34.2-4.06-IS 1239 Ø219.1-4.85-IS 3589
(TYP) (TYP) INFORMATION NOTED
H Information furnished in the drawing is
noted.
21PCA 21 21PCA 23 21PCA 25 21PCA 27 21PCA 29 21PCA 31 21PCA 39
21PCA 33 21PCA 34 21PCA 35 21PCA 36 21PCA 37 21PCA 38
AA 001 AA 001 AA 001 AA 001 AA 001 AA 001 AA 001
AA 001 AA 001 AA 001 AA 001 AA 001 AA 001
21PCA 15 21PCA 16 21PCA 17 21PCA 18 21PCA 19 21PCA 20 21PCA 11 21PCA 12 21PCA 13 21PCA 14
Ø21.8-3.25-IS 1239
AA 001 AA 001 AA 001 AA 001 AA 001 AA 001 AA 001 AA 001 AA 001 AA 001
Ø21.8-3.25-IS 1239
(TYP)
(COLD END)
(COLD END)
(HOT END)
(HOT END)
PYRITE HOPPER-C
PYRITE HOPPER-D
PYRITE HOPPER-A
PYRITE HOPPER-B
PYRITE HOPPER-E
PYRITE HOPPER-F
TO: WATER WASH PIT
FROM : DM WATER INLET GHC10-33.4-3.38-SA 312 TP304 TO HP DOSING SYSTEM
DWG NO. BJ087-00-02-1-901 DWG NO. BJ087-00-05-2-013
HP DOSING PREPARATION
21GHC10
AA 001
F 1.00 THIS DOCUMENT IS THE PROPERTY OF M/S CETHAR LIMITED. AND IT MUST NOT BE USED
DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO THE INTEREST OF THE COMPANY.
P 3.00
Owner:
TANK INLET
T 30
3
C
CVL
01. THE TERMINAL POINT OF SCOPE OF SUPPLY IS THUS MARKED
MEPL
Project Management
02. FOR LEGENDS & SYMBOLS REF. DRG. No.: BJ087-00-05-2-002, BJ087-00-05-2-003 & BJ087-00-05-2-004. & Engg. Consultant
03. "21" WILL BE REPLACED WITH "22" FOR UNIT 2. TEMPLE TOWER, NANDANAM, CHENNAI - 35 , TAMIL NADU, INDIA.
04. ' ' REFER P&ID FOR BLOWDOWN TANK & FLASH STEAM RECOVERY PIPING. DWG.NO. BJ087-00-05-2-014.
PROJECT
E D123 01.SERVICE WATER FOR WATER WASH AND FIRE FIGHTING SEPERATED BJK 12.08.15 05. ABBREVATION & DESCRIPTION Thamminapatnam
D11 02.PRESSURE GAUGE & TEMPERATURE GAUGE HAS BEEN ADDED ON FIRE FIGHTING LINE. F FLOW (TPH)
P WORKING PRESSURE (Kg/cm²(a))
E11&H11 03.AUXILARY COOLING WATER INLET AND OUTLET PRESSURE,TEMPERATURE REVISED.
T WORKING TEMPERATURE (°C)
D3&D12 04.SERVICE WATER SYSTEM WATER WASH INLET PRESSURE REVISED.
05.ESP WATER WASH HAS BEEN REMOVED.
D12 01.SEPERATE TERMINAL POINT SHOWN FOR FIRE FIGHTING AS PER CUSTOMER REQUIREMENT. R.MOHAN 24/11/14 D11 03. SERVICE WATER FLOW QUANTITY HAS BEEN REVISED. RAFI 29/08/11 G2 RAFI 02/07/11 UPP - PIPING P.MOHAMED RAFI 24/05/11
D B A
02.MILL REJECT QUENCHING LINE HAS BEEN REMOVED.
UPP - PIPING M.RAMESH KUMAR 24/05/11
D1 F11&H11 04. DRAWING HAS BEEN REVISED AS PER CONSULTANT COMMENTS. D1 02.SERVICE WATER FOR MILL REJECT QUENCHING LINE HAS BEEN ADDED.
UPP - PIPING A.SATHIYAMOORTHY 24/05/11
D11 03.VALVE 21PCA42 AA 001 HAS BEEN ADDED ON FIRE FIGHTING LINE. C 01. DRAWING HAS BEEN REVISED AS PER CONSULTANT COMMENTS. RAFI 03/10/11 D11&H11
D11 04.APH FIRE FIGHTING COMMON LINE SIZE HAS BEEN REVISED.. D2 02. HFO RETURN OIL COOLER LINE REVISED. B E11 RAFI 29/08/11 e e NTS
D5 to D7 05.FEEDER SPRAY WATER AND DELUGE WATER TERMINAL POINT HAS BEEN SHOWN SEPERATELY. B11 03. DRAWING HAS BEEN REVISED AS PER CONTRACT. D1 02.SERVICE WATER FOR ESP WATER WASH LINE HAS BEEN ADDED.
FINAL PRINT:1 M/B/J/087 BJ087 00-05