ULUBERIA PLANT INSPECTION REPORT
□ HM1 □ HM2 □ HM3 □ GP1 □ GP4 □ TM □ TM □ FACTORY □ EXTERNAL □ STAGE □ FINAL
REPORT DATE PO NO-NA JOB NO- NA
07.03.2025
SUPPLIER □ INHOUSE □ DRG NO- NA QTY-32.19 MT
Dated-NA
ITEM- INSPECTION SCHEDULE DATES
I II III IV V
3.5 X 1500 mm COIL(Cast-A288259, Batch ID-K512850731)
REPORTING SEQUENCE 1. MATERIAL AVAILABLITY □ 5. RECTIFICATIONS □ 9. REINSPECTION □
AS PER APPLICABLE 2. PROGRESS □ 6. WORKMANSHIP □ 10. GALVANIZING □
3. DIMENSIONS □ 7. TESTING AND CERTIFICATES □ 11. ACCEPTANCE □
4. CLARIFICATION AND DEVIATIONS □ 8. FINISHING /PAINTING/MARKING □ 12. OTHER DETAIL □
Visual and Dimensional Inspection
Reference:
EN 10025-2: 2019 S355 JR
TC No: TATA/24/02/2025/S355JR/01 Dated 24 Feb 2025
3.5 X 1500 mm COIL (Cast-A288259, Batch-K512850731), Coil is Leveled after DE coiling and shearing of coil done
for 9150 mm length.
1. From Starting of DE-coiling, Approx. 25 Ton Coil, edge waviness observed up to 5 mm. Hence after leveling it is
found within limits, hence Acceptable.
Approx. 7 Ton of Coil, DE coiled hence after, edge waviness observed 10-24 mm and after leveling found 6 to 18 mm.
Hence we can utilize only max 50 percent of total coil weight and rest will be treated as Scrap and not usable.
2. Rolling condition missing as per Clause 3 of EN 10025-2:2019
3. Deoxidation methods as per Clause 6.2 Missing
4. CE value missing as per Clause 7.2.3
5. Sample orientation for tensile, bend, impact missing in TC
6. Test methods as per clause Clause 10.1 missing in TC
7. Percentage elongation reference gauge length missing in TC.
INSPECTION DATE TONNAGE/QTY AS PER TONNAGE/QTY TONNAGE/QTY TO BE TONNAGE/QTY REJECTED
07.03.2025 PO / JOB NO- ACCEPTED- 25 MT RECTIFIED-7 MT
32.19 MT
SUPPLIER SIGNATURE & STAMP CUSTOMER/TPI NAME & INSPECTOR NAME & SIGNATURE
SIGNATURE
Doc no -SL/SOP/HMS/QCD/01/F-09 Issue Number-01 Issued on-01.04.2023
ULUBERIA PLANT INSPECTION REPORT
Reference Picture
Decoiling, Before Leveling
Doc no -SL/SOP/HMS/QCD/01/F-09 Issue Number-01 Issued on-01.04.2023
ULUBERIA PLANT INSPECTION REPORT
Doc no -SL/SOP/HMS/QCD/01/F-09 Issue Number-01 Issued on-01.04.2023
ULUBERIA PLANT INSPECTION REPORT
Reference Picture
After Leveling
Doc no -SL/SOP/HMS/QCD/01/F-09 Issue Number-01 Issued on-01.04.2023
ULUBERIA PLANT INSPECTION REPORT
---------------End Report------------