100KL 18M B138 LOTNA HILAULI UNNAO DWG
100KL 18M B138 LOTNA HILAULI UNNAO DWG
ANCHOR FASTENERS
10 60 10
TANK WALL 1. ALL DIMENSIONS ARE GIVEN IN MM.
℄
2. ALL WRITTEN DIMENSIONS SHOULD BE FOLLOWED.
1000 80X80X8 THK. 3. DRAWINGS SHOULD BE CHECKED AND VERIFIED AS PER SITE
CONDITION BEFORE EXECUTION OF THE WORK BY THE EXECUTIVE
20
880 120
INSERT ENGINEER CONCERNED.
SLAB PLATE(M.S) 4. ANY DISCREPANCY OR DOUBTS ARISING FROM THE STUDY OF ALL
WALKWAY RELEVANT DRAWING SHALL BE BROUGHT TO THE NOTICE OF THE
40
ENGINEER IN CHARGE FOR CLARIFICATION BEFORE COMMENCEMENT
4 4 OF CONCRETING.
125
02
5. THE CONTRACTOR SHALL FULLY SATISFY AND OBTAIN PRIOR
.
150
APPROVAL OF THE ENGINEER IN CHARGE REGARDING ALL ASPECTS
20
OF THE SPECIFICATION WORK MAIN SHIP AND ISI STANDARD BEFORE
COMMENCEMENT AND PLACEMENT OF ALL.
TANK DIA=6200 2NO8Ø LUG 6. THE CONTRACTOR SHOULD NOT BE PERMITTED TO INSTALL
CONDUITS PIPES ,DUCTS, SLEEVES OR ANY CUTTING WORK THAT
680 ARE NOT SHOWN ON THE PLANS OR NOT APPROVED BY THE
BEAM (RB1)
DETAIL OF HAND RAIL INSERT PLATE ENGINEER OR ARCHITECT.
7- GRADE OF CONCRETE SHALL BE M25 WITH MINIMUM CEMENT ON
300Kg/m CUB WITH NOMINAL AGGREGATE SIZE OF 20mm.
ISOMETRIC VIEW 8-ALL REINFORCEMENT BARS SHALL BE HYSD BARS OF GRADE Fe500
CONFORMING TO IS:1786.
9-CLEAR COVER TO MAIN REINFORCEMENT SHALL BE :
6 a) COLUMN =40mm
6d
b) BEAMS=30mm
80X80X8 THK. c) SLABS=30mm
b
(
.
8
INLET PIPE d) FOOTING =50mm
65
KEY PLAN
)
INSERT PLATE e) STAIRCASE=30mm
40
10- ALL LAPS SHALL BE 49 TIMES DIA OF BAR FOR M25 GARDE OF
COLUMN CONCRETE .
460
WATER INDICATOR:-
db-DIAMETER OF BAR AS PER APPROVED BY VENDER DRAWING.
+124.000m +122.200m
DETAIL OF TIE HOOK Lvl. Lvl. Well compacted 100mm 2- Brick edge protection
416 11x300=3300 416 subgrade with coarse sand
1 91
91 1
Plinth Protection (section 3-3)
1000
6
41
41
DRAIN PIPE OUTLET PIPE
6
B1
3-20Ø MM GI PIPE
B1
EL +136.600m
SS
1500
SS
150
(T.O.C.) M S ANGLE IRON POST
15
11
0
6
(50 X 50 X 6)
30
A
x3
=3
@ 1500 C/C
125
10
1000
00
680 00
00
=3
x3
30
650
11
0
00 EL+136.600m
10
3600
2789
RB1 GB1/ GB2
EL +133.000m
41
MAIN RING BEAM
41
6
(T.O.C.) +125.800m
SPOT DETAIL-D Lvl.
5577
+120.400m
911
911
SSB1
TB4 TB4 TB4 B SSB1
Lvl. COLUMN
1500
41
1
1
6
49
3600
53
2789
DETAIL OF M S POSTS AND PIPES FOR RAILING
00
10
11
0
30
EL +129.400m
x3
=3
00
(T.O.C.)
00
=3
C
x3
30
18M STAGING
FLEXIBLE STEEL
11
0
TB3 TB3 TB3 SS
B TWISTED FLOAT WIRE
0.5
+1 1
SS
18
FG .60 M S ANGLE FRAME
B1
L. 0m 1.0
41
3600
35 X 35 X 4 MM
6
91
1
1.5
416
+127.600m 6∅ MM RING WELDED BRACING AT
LEVEL INDICATOR EL +125.800m Lvl. FOR FLOAT WIRE 2.0
3220 1610 EVERY
(T.O.C.) 1610
6440 ∅6 MM RING FOR 900 MM APART
GUIDE WIRE BE WELDED 2.5
TB2 TB2 TB2
1 2 3 4
SPOT DETAIL -C 3.0
8 GAUGE GUIDE WIRE
3600
1000
41
(T.O.C.)
6
41
6
B1
B1
SS
SS
TB1 TB1 TB1
11
0
A
30
x3
3600
=3
0
0=
PLINTH PROTECTION
00
33
x3
ALL AROUND
00
11
1000 00
10
2789
41
6
6
3 PB1 PB1 PB1 PRADESH NAMAMI GANGE AND RURAL WATER SUPPLY
300
911
+131.200m
B SSB1
Lvl. PROJECT :IMPLEMENTATION OF VARIOUS RURAL WATER
SUPPLY PROJECTS IN THE STATE OF UTTAR PRADESH UNDER
+136.600m THE JAL JEEVAN MISSION.
6
2600
Lvl.
41
TANK THIS DRAWING IS UNDER COPYRIGHT OF
CONSULTING & RESEARCH PRIVATE LIMITED
2789
650
10
=3
00
00
OUTLET PIPE
x3
C
100
11
M15 GRADE
SS
B1
8800
1000
B1
PUDDLE COLLER
6
41
41
550
CONDITION BEFORE EXECUTION OF THE WORK BY THE EXECUTIVE
>H/4
4-No. #16Ø 4-No. #16Ø ENGINEER CONCERNED.
COLUMN 4. ANY DISCREPANCY OR DOUBTS ARISING FROM THE STUDY OF ALL
4-No. #10Ø 4-No. #10Ø EL(+116.450M) RELEVANT DRAWING SHALL BE BROUGHT TO THE NOTICE OF THE
650
650
2-10Ø ON FB1 #10Ø@95C/C #10Ø@150C/C ENGINEER IN CHARGE FOR CLARIFICATION BEFORE COMMENCEMENT
550
EITHER FACE OF CONCRETING.
4-No. #16Ø CONT. #10Ø@150C/C #10Ø@95C/C 5. THE CONTRACTOR SHALL FULLY SATISFY AND OBTAIN PRIOR
R 2-No. #16Ø #10Ø@95C/C
45 #8Ø@150C/C 4-No. #16Ø 4-No. #16Ø #10Ø@150C/C
APPROVAL OF THE ENGINEER IN CHARGE REGARDING ALL ASPECTS
OF THE SPECIFICATION WORK MAIN SHIP AND ISI STANDARD BEFORE
00 . . . . . . . . . . . . . . . . . . . . . . . . . . . .
H
. . . .
2-No. #16Ø+ 2-No. #16Ø+ CONDUITS PIPES ,DUCTS, SLEEVES OR ANY CUTTING WORK THAT
2-No. #12Ø 2-No. #12Ø ARE NOT SHOWN ON THE PLANS OR NOT APPROVED BY THE
EL(+136.600m) ENGINEER OR ARCHITECT.
2-No. #16Ø 850 2-No. #16Ø
650
650
850 4-No. #16Ø CONT. #8Ø@95C/C #8Ø@175C/C 7- GRADE OF CONCRETE SHALL BE M25 WITH MINIMUM CEMENT ON
RB1 300Kg/m CUB WITH NOMINAL AGGREGATE SIZE OF 20mm.
1200 1200 4-No. #10Ø 4-No. #10Ø
R1550 8-ALL REINFORCEMENT BARS SHALL BE HYSD BARS OF GRADE Fe500
>H/4
#8Ø@80C/C #8Ø@95C/C CONFORMING TO IS:1786.
550
LONGITUDINAL SECTION OF FOUNDATION BEAM 2-No. #16Ø+ 2-No. #16Ø+
CONFINEMENT
#8Ø@175C/C 9-CLEAR COVER TO MAIN REINFORCEMENT SHALL BE :
TB4 2-No. #12Ø 2-No. #12Ø a) COLUMN =40mm
b) BEAMS=30mm
400 400
ZONE
c) SLABS=30mm
2-No. #16Ø+ 2-10Ø ON EITHER d) FOOTING =50mm
4-No. #16Ø 4-No. #16Ø e) STAIRCASE=30mm
1200 2-No. #12Ø CONT. 1200 FACE 2-No. #16Ø 10- ALL LAPS SHALL BE 49 TIMES DIA OF BAR FOR M25 GARDE OF
550
650
650
EL(+136.600m) CONCRETE .
GRID BEAM #10Ø@100C/C #10Ø@175C/C 11- PIPE DETAILS SHOWN ARE TENTATIVE. PIPE DETAILS REFER
4-No. #10Ø 4-No. #10Ø MECHANICAL G.A DRAWINGS
#10Ø@100C/C 12- NET SBC CONSIDERED SHALL BE 80KN/SQ M.
4-No. #16Ø 4-No. #16Ø
. . . .
450
450
SCHEMATIC LAP TB2, TB3 #8Ø@100C/C #8Ø@175C/C EL(+125.800m) GB-GRID BEAM
TB4 EL(+129.400m) EL- ELEVATION
2-No. #16Ø #8Ø@100C/C SSB- STAIRCASE SUPPORTING BEAM
EL(+133.000m) PB- PLINTH BEAM
2-No. #16Ø 2-No. #16Ø #8Ø@175C/C TB- TIE BEAM
LONGITUDINAL SECTION OF RING BEAM (RB1) RB- RING BEAM
FGL(+118.600m) BOF-BOTTOM OF FOOTING
#8Ø@150C/C EL(+120.400m) TOL-TOP OF LANDING
230 230 EL(+122.200m) COC- CENTER OF CONCRETE
EL(+124.000m)
3-No. #16Ø
>H/4
#8Ø@80C/C 3-No. #16Ø EL(+125.800m)
550
2600
400
SSB1
400
8Ø@100C/C EL(+127.600m)
CONFINEMENT
8Ø@100C/C EL(+129.400m)
TB1 EL(+131.200m )
COLUMN 3-No. #12Ø 3-No. #12Ø EL(+133.000m ) 8Ø@100C/C
ZONE
COLUMN EL(+134.800m )
EL(+136.600m )
1550 2950
550
550
4500 SCHEDULE OF COLUMN
>H/4
2-No. #16Ø 2-No. #16Ø 800 2-No. #16Ø
800 COLUMN MARKED C1
EXCAVATION PLAN
TOP OF COLUMN EL+18M FROM F.G.L.
. . . . . . . .
#8Ø@150C/C
. . . . . . . . . .
6 No. #16Ø
. . . . . . . . .
VERTICAL REINF.
#8Ø@80C/C
H
#8Ø@175C/C #8Ø@100C/C TIES
2-No. #16Ø 2-No. #16Ø 2-No. #16Ø #8Ø@150C/C
550
#8Ø@80C/C
550
COLUMN (8+6+8)-#8ØSTIRRUPS FGL
CROSS SECTION
400
PB1 PB1 OF COLUMN
LONGITUDINAL SECTION OF TIE BEAM (TB) COLUMN
#8Ø@80C/C
CONFINEMENT ZONE
#8Ø@150C/C
COLUMN SIZE 400Dia.
0 0 COLUMN STARTING
15 15 #8Ø@80C/C LEVEL TOP OF THE FOOTING
1150
230
300 300
1200
15 1
NOTE:-Provide #8Ø@80 links in confinement zone for C1 2
#8Ø@150 links outside confinement zone for C1 column
BEAM SSB1 #8Ø@ 80 links in lap zone 2
2
.
230X400 Provide lapping of main reinforcement in lap zone
REINFORCEMENT DETAIL OF and staggered lapping of alternate bars as shown
TYPICAL FLIGHTS OF STAIR CASE
230
TOP VIEW OF VALVE CHAMBER
200
3445
.
4400 A
2750
1360
R.C. DETAIL OF FOUNDATION PLAN
400 PLAN OF R.C. DETAIL OF PRECAST SLAB
FGL CL of Tank MEGHA ENGINEERING &
2789
INFRASTRUCTURE Ltd.
300
32
354.2810
440
PRADESH NAMAMI GANGE AND RURAL WATER SUPPLY
354.2810
300
354.2810
252.6516
900
550
2600
252.6516
252.6516
CORE CORE
175- No.#12Φ C
PIPE PIPE
500
P.C.C. A2
SCALE- REVISION- R0 DATE OF ISSUE-
100 P.C.C M15 GRADE GENERAL SECTION(2-2) OF VALVE CHAMBER
1610 3220 1610 NTS 07-05-2024
100
125
125
OF THE SPECIFICATION WORK MAIN SHIP AND ISI STANDARD BEFORE
680 680 COMMENCEMENT AND PLACEMENT OF ALL.
600 6. THE CONTRACTOR SHOULD NOT BE PERMITTED TO INSTALL
650
650
650
600 #10/10Ø @ 280C/C CONDUITS PIPES ,DUCTS, SLEEVES OR ANY CUTTING WORK THAT
ARE NOT SHOWN ON THE PLANS OR NOT APPROVED BY THE
650
#10Ø@300C/C #10Ø@300C/C
150
ENGINEER OR ARCHITECT.
RING BEAM #10/10Ø @ 280C/C #10Ø@200C/C(circumferential) 7- GRADE OF CONCRETE SHALL BE M25 WITH MINIMUM CEMENT ON
#10Ø@200C/C(circumferential) GRID BEAM GRID BEAM 300Kg/m CUB WITH NOMINAL AGGREGATE SIZE OF 20mm.
8-ALL REINFORCEMENT BARS SHALL BE HYSD BARS OF GRADE Fe500
RING BEAM CONFORMING TO IS:1786.
9-CLEAR COVER TO MAIN REINFORCEMENT SHALL BE :
a) COLUMN =40mm
b) BEAMS=30mm
400 400 c) SLABS=30mm
d) FOOTING =50mm
400 SECTION 1-1 400 e) STAIRCASE=30mm
10- ALL LAPS SHALL BE 49 TIMES DIA OF BAR FOR M25 GARDE OF
CONCRETE .
11- PIPE DETAILS SHOWN ARE TENTATIVE. PIPE DETAILS REFER
MECHANICAL G.A DRAWINGS
12- NET SBC CONSIDERED SHALL BE 80KN/SQ M.
13- OVER EXCAVATION SHALL BE FILLED WITH PCC 100mm
#10Ø@150C/C(circumferential) #10Ø@150C/C(circumferential) 100MM EXTRA PCC SHOULD BE PROVIDED AT ID & OD OF RAFT.
#10Ø@150C/C(circumferential) #10Ø@150C/C(circumferential) 14- THE DRAWING SHOULD BE READ IN CONJUNCTION WITH RELEVANT
#10/10Ø @ 280C/C
1300 #10/10Ø @ 280C/C
1300 #10/10Ø @ 280C/C MECHANICAL DRAWING.ANY DISCREPANCY MECHANICAL DRAWING AND
#10/10Ø @ 280C/C 700
STRUCTURAL DRAWING RECONCILED BEFORE EXECUTION OR AS PER
700 YOUR DRAWING
600 1400 1400 600 LEGENDS:
FGL- FINISHED GROUND LEVEL
FFL- FINISHED FLOOR LEVEL
BOC- BOTTOM OF CONCRETE
TOC- TOP OF CONCRETE
GB-GRID BEAM
125
125
EL- ELEVATION
SSB- STAIRCASE SUPPORTING BEAM
680 680 PB- PLINTH BEAM
600
150
650
650
650
TB- TIE BEAM
600 #10/10Ø @ 280C/C
RB- RING BEAM
BOF-BOTTOM OF FOOTING
#10Ø@300C/C #10Ø@300C/C TOL-TOP OF LANDING
RING BEAM #10/10Ø @ 280C/C #10Ø@200C/C(circumferential) COC- CENTER OF CONCRETE
#10Ø@200C/C(circumferential) GRID BEAM
RING BEAM
400
400 400
2
2 SECTION 2-2
600
#10Ø@150C/C(circumferential)
#10Ø@300C/C
from outer face of beam
70
00
0
33
600
00
00
2300
13
33
13
00
1400
.
3343
3343
GB1 #10Ø@280C/C
GB1
#10Ø@280C/C
600 888
2820 3790
600 888
3805
5523
1 1
500
SSB1 500 #10Ø@280C/C 500
600 #10Ø@280C/C 600
500
3790
1400
600
600 #10Ø@280C/C
2300
#10Ø@280C/C #10Ø@280C/C
WALKWAY SLAB
3316
3343
0
68
#10Ø@150C/C(circumferential)
600
MEGHA ENGINEERING &
INFRASTRUCTURE Ltd.
CLIENT :
STATE WATER AND SANITATION MISSION (SWSM), UTTAR
PRADESH NAMAMI GANGE AND RURAL WATER SUPPLY
#10Ø@ 200C/C 2 DEPARTMENT GOVERNMENT OF UTTAR PRADESH
680
. . . . . . . . . .
. . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . .
#10Ø@100C/C
550