The document outlines the contract details for the construction of a two-storey regional office building for DOLE XII in Koronadal City, including various cost items and quantities for engineering facilities, general requirements, civil works, electrical, and mechanical systems. The total bid amount is Fifty Nine Million Five Hundred Sixty Nine Thousand Three Hundred Fifty Seven and 20/100 Pesos. The bid was submitted by Pepito V. Lagamayo of Plus Construction Industries Corp. on November 20, 2024.

Uploaded by

Jay Blaza
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
41 views9 pages

24m00287 - Dole Boq (Scope of Works)

The document outlines the contract details for the construction of a two-storey regional office building for DOLE XII in Koronadal City, including various cost items and quantities for engineering facilities, general requirements, civil works, electrical, and mechanical systems. The total bid amount is Fifty Nine Million Five Hundred Sixty Nine Thousand Three Hundred Fifty Seven and 20/100 Pesos. The bid was submitted by Pepito V. Lagamayo of Plus Construction Industries Corp. on November 20, 2024.

Uploaded by

Jay Blaza
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 9

Department of Public Works and Highways XII (DPWH)

Contract ID : 24M00287
Contract Name/ Location : CONSTRUCTION OF THE TWO STOREY REGIONAL
OFFICE BUILDING OF DOLE XII, KORONADAL CITY

PAY UNIT PRICE (PESOS) TOTAL COST (PESOS)


DESCRIPTION UNIT QUANTITY
ITEM NO. (IN WORDS & IN FIGURES) (IN WORDS & IN FIGURES)

(1) (2) (3) (4) (5) (6)

PART A: FACILITIES FOR THE ENGINEER

Provision of Field
Office for the
A.1.1(8) month/s 12.00
Engineer (Rental
Basis)

Provision of 4x4 Pick


Up Type Service
vehicle-
A.1.2(2) Vehicle for the 12.00
month/s
Engineer on Bare
Rental Basis

PART B: OTHER GENERAL REQUIREMENTS

Permits and lump


B.3 (1) 1.00
Clearances sum

Project Billboard /
B.5 (1) each 2.00
Signboard

Occupational Safety lump


B.7 (1) 1.00
and Health sum

Mobilization/ lump
B.9 (1) 1.00
Demobilization sum

Geotechnical
B.19 (1) lm 60.00
Investigation (Soil)
Geotechnical
B.19 (1) lm 60.00
Investigation (Soil)

PART III: CIVIL, MECHANICAL, ELECTRICAL, SANITARY/PLUMBING WORKS


PART A: EARTHWORKS

Structure Excavation cubic


803(1)a 1,353.00
(Common Soil) meter

Embankment From
Structure cubic
804(1)a 1,500.00
Excavation, meter
Common Soil

cubic
804(7) Gravel Fill 373.20
meter

PART B: PLAIN AND REINFORCED CONCRETE WORKS

Structural Concrete,
cubic
900(1)d 4000 psi, Class A, 804.73
meter
28 days

Reinforcing Steel
902(1)a1 (Deformed), Grade kg 92,627.50
40

Reinforcing Steel
(Deformed), Grade
902(1)a2 kg 37,477.00
60

Formworks and square


903(2) 5,367.52
Falseworks meter

PART C: FINISHING AND OTHER CIVILWORKS

1000(1) Soil Poisoning L 265.00


1000(1) Soil Poisoning L 265.00

1001(5)b Catch Basin (CHB) each 13.00

lump
1001(8) Sewer Lines Work 1.00
sum

Storm Drainage and lump


1001(9) 1.00
Downspout sum

lump
1002(4) Plumbing Fixtures 1.00
sum

lump
1002(24) Cold Water Lines 1.00
sum

Ceiling (4.5 mm,


square
1003(1)a1 Metal Frame, Fiber 336.00
meter
Cement Board)

Ceiling (Metal
square
1003(1)d Frame, Gypsum 1,325.00
meter
Board)

square
1003(3) Cabinets 71.90
meter
square
1003(14) Phenolic Board 28.80
meter

lump
1003(23) Modular Partition 1.00
sum

lump
1004(2) Finishing Hardware 1.00
sum

square
1006(2) Flush Door 36.96
meter

square
1006(4) Steel Louver Door 10.50
meter

Aluminum Framed
square
1007(1)b Glass Door (Swing 155.50
meter
Type)

Aluminum Glass
square
1008 (1) a Windows (Sliding 144.71
meter
Type)

Aluminum Glass
square
1008(1)c Windows (Awning 4.20
meter
Type)

Aluminum Glass
square
1008(1)d Windows (Fixed 95.34
meter
Type)
Aluminum Glass
square
1008(1)d Windows (Fixed 95.34
meter
Type)

Frames (Jambs,
Sills, Head,
1010(1) set 14.00
Transoms and
Mullions)

square
1010(2)b Doors (Wood Panel) 18.90
meter

Fabricated Metal
Roofing Accessory,
1013(2)a lm 63.44
Gauge 26 (Ridge
Roll)

Fabricated Metal
1013(2)c Roofing Accessory, lm 43.92
Gauge 24 (Gutters)

Prepainted Metal
Sheets, above 0.427 square
1014(1)b2 793.00
mm, Rib Type, Long meter
Span

Waterproofing square
1016(1)a 109.20
(Cement-base) meter

Glazed Tiles and square


1018(1) 1,610.68
Trims meter

square
1018(2) Unglazed Tiles 266.00
meter
Cement Plaster square
1027(1) 5,642.42
Finish meter

Painting Works square


1032(1)a 3,687.00
(Masonry/Concrete) meter

Painting Works square


1032(1)b 1,687.80
(Wood) meter

Painting Works square


1032(1)c 740.00
(Steel) meter

square
1038(1) Reflective Insulation 793.00
meter

PVC Doors and square


1043(1) 9.87
Framers meter

Perforated Ceiling square


1045(1) 116.00
Panels meter

CHB Non Load


Bearing (Including square
1046(2)a1 267.01
Reinforcing Steel, meter
100 mm)

CHB Non Load


Bearing (Including square
1046(2)a2 169.76
Reinforcing Steel, meter
150 mm)
CHB Non Load
Bearing (Including square
1046(2)a2 169.76
Reinforcing Steel, meter
150 mm)

Metal Structure
1047(4)b Accessories each 20.00
(Turnbuckle)

lump
1047(7) Structural Steel 1.00
sum

Structural Steel
1047(8)a kg 1,921.88
(Trusses)

Structural Steel
1047(8)b kg 2,199.36
(Purlins)

lump
1051(1)a Railing 1.00
sum

PART D: ELECTRICAL

Conduits, Boxes and


Fittings (Conduit lump
1100(10) 1.00
Works/Conduit sum
Rough in)

Wires and Wiring lump


1101(33) 1.00
Devices sum

Panelboard with
lump
1102(1) Main and Branch 1.00
sum
Breakers
Panelboard with
lump
1102(1) Main and Branch 1.00
sum
Breakers

Pole Mounted Power


Transformer (OISC)
with Complete
lump
1102(11) Accessories, Single 1.00
sum
or Three Phase,
Pole Type or
Flatform

Generator (Single or
lump
1102(16)a1 Three Phase, Stand- 1.00
sum
by)

Lighting Fixtures and lump


1103(1) 1.00
Lamps sum

lump
1104(1) Auxiliary System 1.00
sum

PART E: MECHANICAL

Air Conditioning
lump
1200(13)a System 1.00
sum
(Package/Split Type)

lump
1200(14) Ventilating System 1.00
sum

Water Pumping lump


1201(1) 1.00
System sum

Automatic Fire
lump
1202(1) Sprinkler System 1.00
sum
(AFSS)
Automatic Fire
lump
1202(1) Sprinkler System 1.00
sum
(AFSS)

lump
1208(1) Fire Alarm System 1.00
sum

TOTAL: -

TOTAL BID AMOUNT IN WORDS AND IN FIGURES


FIFTY NINE MILLION FIVE HUNDRED SIXTY NINE THOUSAND THREE HUNDRED FIFTY SEVEN AND
20/100 PESOS ONLY

SUBMITTED BY:
PEPITO V. LAGAMAYO DATE: NOVEMBER 20, 2024
Name of BiddePLUS CONSTRUCTION INDUSTRIES CORP.
Position: AUTHORIZED MANAGING OFFICER