SS-S-DLD-005-0 Wall and Floor Opening SS Building (SWGR & Control)

The document contains detailed construction notes and specifications for a building project, including dimensions, openings for HVAC systems, and fire safety requirements. It emphasizes that all dimensions are in millimeters and elevations in meters, with written dimensions taking precedence over scale discrepancies. Additionally, it outlines the tentative nature of certain openings and the need for client approval for any changes.

Uploaded by

zeeshan.talaow
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
89 views6 pages

SS-S-DLD-005-0 Wall and Floor Opening SS Building (SWGR & Control)

The document contains detailed construction notes and specifications for a building project, including dimensions, openings for HVAC systems, and fire safety requirements. It emphasizes that all dimensions are in millimeters and elevations in meters, with written dimensions taking precedence over scale discrepancies. Additionally, it outlines the tentative nature of certain openings and the need for client approval for any changes.

Uploaded by

zeeshan.talaow
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

NOTES

1. ALL DIMENSIONS ARE IN MILLIMETERS & ELEVATIONS IN METERS UNLESS


OTHERWISE NOTED.

A 2. ANY DISCREPANCY IN SCALE IN THIS DRAWING THE WRITTEN DIMENSIONS GOVERN. A


3. THE OPENING SHOWN FOR ALL AUX. PANELS AND HVAC ARE TENTATIVE AND THE SAME
20 18 16 15 14 13 12 11 8 6 5 4 3 2 1
N
WILL BE INCORPORATED AFTER APPROVAL OF FINAL VENDOR DRAWING.

84680
4. FUTURE OPENING SHALL BE SEALED WITH THREE (3) HOURS FIRE STOP.
7120 7440 4600 6000 6000 6100 520 5910 7020 7200 6400 5990 7240 7140
5. SIZE OF HVAC OPENING SHALL BE AS PER THE MECHANICAL APPROVED DESIGN

6. WALL AND FLOOR OPENINGS FOR HVAC SYSTEM ARE TENTATIVE,


AND SUBJECT TO CHANGE BASED ON THE FINAL HVAC DESIGN.

7. PROVIDE {110mm PVC SLEEVES IN SUITABLE LOCATIONS FOR STAIR CASE LIGHTING
AND CANOPY LIGHTING

8. AUXILIARY AC/DC PANEL DIMENSION/LOCATION SHOWN ARE TENTATIVE, THE EXACT


DIMESIONS WILL PROVIDE AFTER FINALIZING AUXILIARY AC/DC PANELS.
B 1.2M WIDE CANOPY B
9. ANY ADDITIONAL OPENING IS REQUIRED AS PER SITE REQUIREMENT THE SAME SHALL
BE PROVIEDE BY THE MAIN CONTRACTOR WITH CLIENT APPROVAL.

1500mm WIDE EL. +0.30 1500mm WIDE EL. +0.30 10. ALL ENTRY AND EXIT OF DUCT BANKS AND TRENCHES AT WALL OF CABLE BASEMENT
CL SC WALKWAY (WKL) CL SC WALKWAY (WKL) CL SC SHALL BE SEALED WITH FIRE PROOF MATERIAL AFTER CABLE PULLING TO PREVENT
FIRE PROGRESSION AS WELL AS TO PREVENT WATER INGRESS.
A A
GS GS GS 1050 1325 2175 1050 GS GS GS 625 1050 2025 1050 GS GS GS
EL. +0.30

1050 975 GS 1.0M HIGH 11. ANY MINOR CHANGES / ADJUSTMENT TO CLEAR ANY CLASHES WITH OTHER DISCIPLINES

EL. +2.40
CL SC CL SC CL SC GS
(TOL)

EL. +0.30

EL. +0.30
EL. +2.40

DN

(FFL)
GS DN GS EXTENDED CABLE HANDRAILING (TYP) D6 GS DN AS PER ACTUAL SITE CONDITIONS TO BE DISCUSSED WITH CLIENT AT SITE &

(TOL)

(TOL)
(FFL)

SF
3600

3600
D6

1050

1050

1050

1050

1050
EL. +2.40 EXTENDED CABLE BASEMENT CORRECTIONS TO BE REFLECTED IN THE MARKUP / AS BUILT DRAWINGS.
SF (TOC)
SF BASEMENT SF SF
3000 EL. +2.40 UP

1125

1125

1125

1125

1125
2387 1250 2646 600
1800 2525 600 1800
GS GS P1 P1 GS P1 (TOC) P1 GS
S4 S4 GS D6 GS S4

B B
S1

1100
SC SC SC
WALL OPENING
1265

C 1500 GS C
OPENING FOR 1250x1100 (BOO+5.70) WALL OPENING
600x500 (BOO+2.45) A

2820
HVAC DUCT RAD TO PACU-1A,1B 600x500 (BOO+2.45)
FOR PRD-1.01 FROM FFL P1 SHT-05

1000
1000

700

700
1850x1100mm B.O.O 5.70 FOR PRD-1.02 FROM FFL

700
1850

1000

800
800
700
700

800
5585

5585
700
800

800

800
BA04 A1 A2 A3 A4 A5 A6 A3 A7 A8 BA02 B1 B2 B3 B4 B5 B6 B3 B7 B8
33kV SWGR. ROOM
P1 3300 3500 3400 1400 1820 14000 980 1400 3210 3690
3680 3630 3270 1400 2270 11100 3430 1400 770 6130

1520
84620x14500
150 A9 A10 300(TYP) 150 B12 B9 300(TYP) LEGEND
1500

A9 B10 EL. +2.40


(FFL)
280

280

280
C C BOO BOTTOM OF OPENING
GS GS

280

280
EF EXHAUST FAN
D2 D2
FFL FINISHED FLOOR LEVEL
3390

3390
SC CL CL SC SF SUPPLY FAN
D SWGR. SWITCHGEAR
D
A10 B9

280

280
GS 150 A9 300(TYP) A9 150 B12 300(TYP) GS
B10 TYP TYPICAL
D D
280

280

280
TOL TOP OF LANDING
TOP TOP OF PARAPET

1520
3680 3630 3270 1400 2270 11100 3430 1400 770 6130 3300 3500 3400 1400 1820 14000 980 1400 3210 3690 TOC TOP OF CONCRETE

WKL WALKWAY FINISHED LEVEL

800
BA03 A1 A2 A3 A4 A5 A6 A3 A7 A8 BA01 B1 B2 B3 B4 B5 B6 B3 B7 B8 LOADING AND
5605

5605
UNLOADING FLOOR OPENING
PLATFORM PVC SLEEVE OPENING IN WALL
1.0x1.0m WIDE

2800
950 1000 OPENING FOR
PVC SLEEVE OPENING IN FLOOR
1250x1100 EMERGENCY EXIT P1

1500
BOO+5.70

1000
GS D7

E E E E
D7
1200

1350

1350

S1 S1 925 1050 1050 625 GS


1115

1115
800 C7 C7 GS
D1 EL. +2.40
P1 900x900mm OPENING
3400

3400
850x600mm OPENING (FFL) 900x500mm
3000 WIDE CORRIDOR CL SC
BA05

1050

1050
EL. +2.40 SC CL FOR HVAC DUCT
BA05
38040

EF EF FOR HVAC DUCT OPENING FOR


(TOC) BOD+5.75 600 200 EL. +2.40 600 200
700 900 HVAC DUCT D1
2750

2750

D3
GS D3 500 538 D3 S2 (FFL) S2 D3 GS
C1 C1
G F

575
1100
GS
1200

1200
GS GS GS GS GS GS S1 GS GS
E4 E5
BS PL

500
EL. +0.30 400

500
700 500x450mm 6100 2240 600 {90mm PVC PIPE

3050
6900

2000
3150
P1

200
(WKL) MECH.OPENING S3 600 D10 EL. +2.35 CL SC FOR WATER SUPPLY
1100 D4
(FFL) TO BATTERY ROOM

5390
4810 6900 300 6100 300 2950 2640
S3 S3

350
290
4150

4150

290 GS
6560

4190
(TYP) (TYP)
15 14 13 FIRE FIGHTING ROOM

600
GS

3390
C2 C2 E1 E2 E3 D1
D4 GS GS GS

2000
5630x10770 D10 1290 580 2080 580
F F
1000 EL. +2.40
H3

BS

2000
BS
X4

(FFL)
H2

C6 C6
X0 X1 X2
H1

300

500
G
1400

1400

C3 G

350 1000260
C3
H0

S2

1200
600
1500
E1 E2 E3 BATTERY ROOM
PS

1910
500x500mm D11 BS
610

610

D5
H C4 C4 H P1
SST-10BBT11 WALL OPENING 200
1200

1600

2000
2240 400
FOR EXHAUST FAN S2 400

350
800 EL. +2.40
BOO+5.85

5360
D12

5060
500

200 (TYP.)
P1 (FFL)
FIRE WALL
D2

1550
1290 580 2080 580

600
D6

3150
E1 E2 E3

1600
550x500mm
4900

550
700x400mm
S2 600 BS
OPENING FOR 290 290 BS BS FOR EXHAUST FAN

2500
S3
6.0M WIDE ROAD

S3

900 350
700
(TYP) (TYP) BOO+6.05

2000
HVAC DUCT 1800 GS

1170

1050
D7 BOO+4.65

800
SST-10BBT12 BOO+6.05 GS GS GS
C5
7690

7690

BOO+3.25
G J J G
C5

596
600
E1 E2 E3
H3

K K 1500 D3 CL D5

250
300
D3 F1
X4
H2

CONTROL ROOM 360 3800

1530
X0 X1 X2

SC

EL. +0.25

1400
800x800mm OPENING
H1

3100

3100
2000
WWC D13 600x500mm

(FFL)
24000x16480
CABLE TRENCH

1000 FOR HVAC DUCT 600


F3
H0

MECH.OPENING
1700 EL. +2.40 AUX. ROOM

350
BOD+5.75 F2

600
1000

5710
1.0x1.0m WIDE 400x400mm (FFL) 1960 2200 2000
5000

600

1400
C7 C7 WALL OPENING E1 E2 E3

350
OPENING FOR EWC D13
FOR EXHAUST FAN 1300 400 2240 400
GS EMERGENCY EXIT 1.0x1.0m WIDE TELECOM.ROOM

1600
BOO+4.15 TOILET
950 1000 F4
CL CL 400 200
2540

P1 SHT-06 OPENING FOR SHT-06

2350

400
FIRE WALL 3300x5430 3000 640
1900

1900

EMERGENCY EXIT 550 3300 350 1600 D7


SC SC D8
GS D 3300 D9 C
1200

200

1000
S1 S1 S1 P1 F5
L L EG-01 L L
P1 P1 D8 D5 2100 400 1950 P1 400 2682 P1
D5 1100 400 1250 550 1500 REFERENCE DRAWINGS
1200 1500mm WIDE
1200 1550
H 700 4500 WALKWAY NO. DRAWING TITLE DRAWING No. REVISION H
{125mm SLEEVE WALL OPENING 1100x1000 1250x1000 WALL OPENING 600x600mm 1 SINGLE LINE DIAGRAM-OVERALL HV/MV SAAD2-SS-E-SLD-003 3
SC
C.O.S +4.65 400x400 BOO+2.45 BOO+5.75 BOO+5.75 400x400 BOO+2.45 OPENING FOR 2 OVERALL ELECTRICAL EQUIPMENT LAYOUT SAAD2-SS-E-DLD-002 2
CL
SHT-06

SHT-05
FROM FFL FROM FFL HVAC DUCT

B
E

FIRE WALL 3 SUBSTATION BUILDING (SWITCHGEAR AND CONTROL ROOM) EQUIPMENT LAYOUT SAAD2-SS-E-DLD-003 1

700x300mm WIDE 4 LAYOUT AND DETAILS OF DUCTBANKS , HANDHOLES, PULLPIT AND TRENCHES SAAD2-SS-C-DLD-018 0
OPENING IN PARAPET
FOR PACU CABLE ENTRY

GRAPHIC SCALE:
5585 3390 5585 4600 6000 6000 9030 2330 3580 4610 7200 6400 5990 7240 7140
I 0 0.5 1 2 3 4 5 6 7 8 9 10m I
84680
SCALE : 1 : 100

20 19 17 16 15 14 13 12 11 10 9 7 6 5 4 3 2 1

REVISIONS
REVISION DATE PARTICULARS DESIGNED APPROVED

33kV SWGR. OPENING DETAIL FOR BA03& BA04 0 14.01.2024 ISSUED FOR APPROVAL AJEC MAK

OPENING TYPE OF OPENING SIZEs IN mm OPENING / SLEEVES - WALL AND FLOOR OPENING -GROUND FLOOR
MARKED MOUNTING HEIGHT DESCRIPTIONS/ USAGE SCALE 1:100

A1 FLOOR 3630x800 SLAB THK.

A2 FLOOR 3270x700 SLAB THK. 33kV SWGR.,CONTROL ROOM, AUX. ROOM AND COMM. ROOM 33kV SWGR.,CONTROL ROOM, AUX. ROOM AND COMM. ROOM SLEEVES OPENING DETAIL
J J
A3 FLOOR 1400x1000 SLAB THK. OPENING TYPE OF OPENING SIZEs IN mm OPENING / SLEEVES OPENING TYPE OF OPENING SIZEs IN mm OPENING / SLEEVES OPENING TYPE OF
OPENING / SLEEVES DESCRIPTIONS/ USAGE
MARKED MOUNTING HEIGHT DESCRIPTIONS/ USAGE MARKED MOUNTING HEIGHT DESCRIPTIONS/ USAGE MARKED MOUNTING
A4 FLOOR 2270x700 SLAB THK.
COMPANY SAAD TWO RENEWABLE
A5 FLOOR 11100x800 SLAB THK. 33kV SWGR. OPENING DETAIL FOR BA05 D9 FLOOR 1600x400 SLAB THK. P1 WALL 1x{110mm PVC SLEEVE FOR PARAPET LIGHTING
OWNER :
ENERGY COMPANY
33kV SWGR. POWER C1 FLOOR 2750x800 SLAB THK. D10 FLOOR 2000x400 SLAB THK. S1 WALL/FLOOR 1x{160mm PVC SLEEVE FOR SPARE USAGE
A6 FLOOR 3430x700 SLAB THK. AUX.PANEL OPENINGS
CABLE OPENING
C2 FLOOR 4150x700 SLAB THK. 33kV SWGR. POWER D11 FLOOR 1000x200 SLAB THK. S2 WALL/FLOOR 2x{160mm PVC SLEEVES FOR SAS TABLE
A7 FLOOR 770x700 SLAB THK.
CABLE OPENING
C3 FLOOR 1400x1000 SLAB THK. D12 FLOOR 3150x400 SLAB THK. S3 WALL/FLOOR 1x{160mm PVC SLEEVES FOR BATTERY CABLES OWNER
A8 FLOOR 6130x800 SLAB THK.
ENGINEER:
SgurrEnergy
C4 FLOOR 610x700 SLAB THK. D13 FLOOR 1400x400 SLAB THK. S4 WALL/FLOOR 1x{110mm PVC SLEEVE IN STAIRCASE MIDLANDING & FOR CRANE
A9 FLOOR 150x280 SLAB THK.
33kV SWGR. CONTROL
A10 FLOOR 300x280 SLAB THK. CABLE OPENING C5 FLOOR 7690x800 SLAB THK. CONTROL ROOM S5 WALL 2x{200mm PVC SLEEVES FOR SPARE

C6 FLOOR 300x280 SLAB THK. 33kV SWGR. POWER E1 FLOOR 6900x600 SLAB THK. S6 WALL 2x{110mm PVC SLEEVES FOR SPARE
K 33kV SWGR. OPENING DETAIL FOR BA01& BA02 SEPCOIII ELECTRIC POWER K
CABLE OPENING CONTROL/ PROTECTION CONTRACTOR:
C7 FLOOR 150x280 SLAB THK. E2 FLOOR 6100x600 SLAB THK. S7 WALL 1x{110mm & 1x{50mm PVC SLEEVES FOR STAIR CASE
B1 FLOOR 3500x800 SLAB THK. PANEL OPENINGS CONSTRUCTION CO. LTD BRANCH
B2 FLOOR 3400x700 SLAB THK. AUX. ROOM E3 FLOOR 2950x600 SLAB THK. L1 WALL 2x{110mm PVC SLEEVES FOR SPARE/ LIGHTING

D1 FLOOR 4190x600 SLAB THK. E4 FLOOR 6900x500 SLAB THK. OPENINGS FOR SPARE/ CL WALL/FLOOR 1x{110mm PVC SLEEVE FOR CANOPY LIGHTING
B3 FLOOR 1400x1000 SLAB THK.
33kV SWGR. POWER FUTURE PANELS DESIGN
D2 FLOOR 5060x600 SLAB THK. E5 FLOOR 6100x500 SLAB THK. SC WALL/FLOOR 1x{50mm PVC SLEEVE FOR SECURITY CAMERA
B4 FLOOR 1820x700 SLAB THK.
CABLE OPENING INSTITUTE:
AL-JAZIRAH ENGINEERS & CONSULTANTS
B5 FLOOR 14000x800 SLAB THK.
D3 FLOOR 3100x400 SLAB THK. TELECOM.ROOM GS WALL/FLOOR 1x{50mm PVC SLEEVE FOR GROUNDING

D4 FLOOR 3390x600 SLAB THK. F1 FLOOR 3800x300 SLAB THK. SP WALL 1x{90mm PVC SLEEVE FOR SUMP PUMP DRAINAGE
B6 FLOOR 980x700 SLAB THK. AUX.PANEL OPENINGS
SA’AD-2 SOLAR PV INDEPENDENT POWER PLANT
PROJECT
D5 FLOOR 1910x400 SLAB THK. F2 FLOOR 2200x300 SLAB THK. BS FLOOR 1x{110mm PVC SLEEVE FOR BATTERY ROOM FLOOR DRAINAGE TITLE:
B7 FLOOR 3210x700 SLAB THK.

D6 FLOOR 1550x600 SLAB THK. F3 FLOOR 600x600 SLAB THK. COMMUNICATION PS WALL 1x{125mm PVC SLEEVE FOR PLUMBING
WALL AND FLOOR OPENING - SUBSTATION BUILDING (SWITCHGEAR AND CONTROL ROOM)
DRAWING
B8 FLOOR 3690x800 SLAB THK.
PANEL OPENINGS TITLE:
D7 FLOOR 900x700 SLAB THK. F4 FLOOR 1600x200 SLAB THK.
B9 FLOOR 300x280 SLAB THK. 33kV SWGR. POWER
L CABLE OPENING APPROVED BY: MAK DESIGNED BY: AJEC SHEET NO.: 01 of 06 PAPER SIZE: A0
L
D8 FLOOR 3300x400 SLAB THK. F5 FLOOR 3000x300 SLAB THK.
B10 FLOOR 150x280 SLAB THK.
REVIEWED BY: MH SCALE: None DRAWING NO. REVISION ISSUED FOR

PREPARED BY: SKS DATE: 09.01.2024 SAAD2-SS-S-DLD-005 0 IFA

841x1189 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
NOTES

FOR NOTES, REFER SHEET-01 OF 06

N
A A

20 18 16 15 14 13 12 11 8 6 5 4 3 2 1
84680

7120 7340 4700 6000 6000 6100 520 5910 7020 7200 6400 5990 7240 7140

1.2M WIDE CANOPY


B 1.2M WIDE CANOPY B

EL. +0.30 300 1000 1000


L1 (WKL) 1000 300
D6 1000 L1 D6 L1 D6

A A
UP

EL. +0.30
300 L1
EL. +0.30

EL. +0.30
UP UP

(TOL)
(TOL)

(TOL)
3600

3600
DN
DN
DN

B B
C C
A
SHT-05
5585

5585
300
LEGEND

1000
L1
FFL FINISHED FLOOR LEVEL
C C
900

TYP TYPICAL
0.5% SLOPE

0.5% SLOPE

0.5% SLOPE

0.5% SLOPE

0.5% SLOPE

0.5% SLOPE

0.5% SLOPE
TOL TOP OF LANDING

21660
3390

3390
L1 CABLE BASEMENT
TOC TOP OF CONCRETE

D COS CENTRE OF SLEEVE D


FLOOR OPENING
D D PVC SLEEVE OPENING IN WALL

PVC SLEEVE OPENING IN FLOOR


5605

5605
SLEEVES OPENING DETAIL

OPENING TYPE OF
OPENING / SLEEVES DESCRIPTIONS/ USAGE
MARKED MOUNTING

S5 WALL 2x{200mm PVC SLEEVES FOR SPARE

E E E L1 WALL 2x{110mm PVC SLEEVES FOR SPARE/ LIGHTING E


1350
3400

3400
L1
38040

SHT-06

F
F F
300 1200

RIDGE LINE

S5

5390
6560

15 14 13
{125mm SLEEVE FOR
F F
BATTERY ROOM DRAINAGE
@ +1.54 (COS)

G G

H H

0.5% SLOPE

0.5% SLOPE

0.5% SLOPE

0.5% SLOPE

5360
CABLE BASEMENT
4900

300
L1

1000
G J J G
K K
300 1000
900

CABLE BASEMENT
L1
1050x1050mm OPENING
S5

5710
FOR EF. FROM BASEMENT
5000

1050x1050mm OPENING 1050x1050mm OPENING


FOR EF. FROM BASEMENT FOR EF. FROM BASEMENT

675 1050 SHT-06 SHT-06


1000 300 300 1000 300 1000 1000 300 300 1000 1200 3500 300 1050 670
D 300
C
L L L L
S5 1024 1050 S5 S5
L1 S5 S5 L1 L1 1200 REFERENCE DRAWINGS
H NO. DRAWING TITLE DRAWING No. REVISION H
1 SINGLE LINE DIAGRAM-OVERALL HV/MV SAAD2-SS-E-SLD-003 3

2 OVERALL ELECTRICAL EQUIPMENT LAYOUT SAAD2-SS-E-DLD-002 2


SHT-06

SHT-05
B
E

3 SUBSTATION BUILDING (SWITCHGEAR AND CONTROL ROOM) EQUIPMENT LAYOUT SAAD2-SS-E-DLD-003 1

4 LAYOUT AND DETAILS OF DUCTBANKS , HANDHOLES, PULLPIT AND TRENCHES SAAD2-SS-C-DLD-018 0

GRAPHIC SCALE:
5585 3390 5585 4600 6000 6000 5162 938520 2410 2330 3580 4610 7200 6400 5990 7240 7140
I 0 0.5 1 2 3 4 5 6 7 8 9 10m I
84680
SCALE : 1 : 100

20 19 17 16 15 14 13 12 11 10 9 7 6 5 4 3 2 1

REVISIONS
REVISION DATE PARTICULARS DESIGNED APPROVED

0 14.01.2024 ISSUED FOR APPROVAL AJEC MAK

- WALL AND FLOOR OPENING-CABLE BASEMENT LEVEL @+0.30m


SCALE 1:100

J J

COMPANY SAAD TWO RENEWABLE


OWNER :
ENERGY COMPANY

OWNER
ENGINEER:
SgurrEnergy

K SEPCOIII ELECTRIC POWER K


CONTRACTOR:
CONSTRUCTION CO. LTD BRANCH

DESIGN
INSTITUTE:
AL-JAZIRAH ENGINEERS & CONSULTANTS

SA’AD-2 SOLAR PV INDEPENDENT POWER PLANT


PROJECT
TITLE:

WALL AND FLOOR OPENING - SUBSTATION BUILDING (SWITCHGEAR AND CONTROL ROOM)
DRAWING
TITLE:

L APPROVED BY: MAK DESIGNED BY: AJEC SHEET NO.: 02 of 06 PAPER SIZE: A0
L

REVIEWED BY: MH SCALE: None DRAWING NO. REVISION ISSUED FOR

SAAD2-SS-S-DLD-005 IFA
0

PREPARED BY: SKS DATE: 09.01.2024

841x1189 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
NOTES

FOR NOTES, REFER SHEET-01 OF 06

A A

N
20 18 16 15 14 13 12 11 8 6 5 4 3 2 1
84680

7120 7440 4600 6000 6000 6100 520 5910 7020 7200 6400 5990 7240 7140

2.624m WIDE OPENING 6x{200mm PVC SLEEVES FOR 1.30m WIDE OPENING
2x{200mm PVC 3.0m WIDE OPENING 2x{200mm PVC
FOR 33kV POWER OUTDOOR CONTROL CABLES FOR 33kV POWER
SLEEVES FOR FOR 33kV POWER SLEEVES FOR
FOUNDATION RAFT CABLES FROM XFMR.
B GT POWER CABLES CABLES FROM XFMR. CABLES FROM XFMR. LV-DB-01 GT POWER CABLES B
PROJECTION (TYP.)
300 1800 1860 1x{200mm PVC SLEEVES
2202 1500 2150 240
300 1300 900 2050 240 1400 300
1500 300 300 1388 240 1860 3786 300 240
FOR GT POWER CABLES
1200 1076 1364 300 542 240 1810 1000 1254 300 240 2310 1265 300 1150 1050

SP S5 GS SP S6 S5 SP GS S5 SP SP GS SP S6 SP GS S5 SP

A A
GS 3140 2624 1776 900 GS 900 900 GS
1057 3000 1450 300
300 1300 400 1300
1910
3600

3600
2480 300
2850 240

2x{200mm PVC 2x{200mm PVC


S7 5x{200mm PVC S7 2x{200mm PVC 2x{200mm PVC S7
D6 D6 D6
SLEEVES FOR SLEEVES FOR
SLEEVES FOR SLEEVES FOR SLEEVES FOR
B GT POWER CABLES GT POWER CABLES B
OUTDOOR CONTROL GT POWER CABLES
550

550
GT POWER CABLES
CABLES
C C
300 1400
LV-DB-10
300 1400 1500 300
A
SHT-05
3000

3000
5585

5585
3.0m WIDE OPENING
FOR 33kV POWER
3.0m WIDE OPENING CABLES FROM XFMR.
GS FOR 33kV POWER LEGEND
GS

1200
CABLES FROM XFMR.
670 595

EL ELEVATION
C C
5x{200mm PVC SLEEVES FOR FFL FINISHED FLOOR LEVEL
INCOMING POWER CABLES
500(TYP.)

TOC TOP OF CONCRETE


3390

3390
CABLE BASEMENT
2000

2000
MV-DB-11
TYP TYPICAL
D 6x{200mm PVC SLEEVES FOR D
INCOMING POWER CABLES FLOOR OPENING

696
MV-DB-06 PVC SLEEVE OPENING IN WALL
D D
455

PVC SLEEVE OPENING IN FLOOR

9x{200mm PVC SLEEVES FOR


8x{200mm PVC SLEEVES FOR
INCOMING POWER CABLES
4000

INCOMING POWER CABLES


5605

5605
MV-DB-05

3500
MV-DB-10

1500mm WIDE OPENING FOR


SST CONTROL CABLES

LV-CT-01

650 753
500

GS

E E E E
7x{200mm PVC SLEEVES 5x{200mm PVC SLEEVES FOR
3x{200mm PVC SLEEVES
FOR SVG POWER CABLES
3400

3400
FOR SST POWER CABLES INCOMING POWER CABLES

2000
2000

MV-DB-SG-10 SHT-06
38040

5x{200mm PVC SLEEVES FOR MV-DB-SST-01 MV-DB-09

INCOMING POWER CABLES 2400 650 F


2560 800
750

1500 2080
MV-DB-04
F EL. -1.20 F
860

(TOC) RIDGE LINE

9x{200mm PVC SLEEVES FOR

5390
INCOMING POWER CABLES

4000
11x{200mm PVC SLEEVES FOR
6560

MV-DB-08
5000

INCOMING POWER CABLES 15 14 13


240

F MV-DB-03 F
CABLE BASEMENT SP

700
2450

G G

500
2x3x{110mm PVC SLEEVES GS

H H FOR FIBRE OPTIC CABLES 8x{200mm PVC SLEEVES FOR

0.5% SLOPE

0.5% SLOPE
INCOMING POWER CABLES
2210

5360
MV-DB-07

3500
SP 3x{200mm PVC SLEEVES
4900

240
3500

FOR SVG CONTROL CABLES


8x{200mm PVC SLEEVES FOR
LV-DB-20 CABLE BASEMENT
INCOMING POWER CABLES

840
MV-DB-02
G J J G
700 700

760 600
K K 2x1x110mm DIA PVC SLEEVES
FOR FIBRE OPTIC CABLES
8x{200mm PVC SLEEVES FOR
2x{200mm PVC SLEEVES 7x{200mm PVC SLEEVES 2x3x110mm DIA PVC SLEEVES
INCOMING POWER CABLES 3x{110mm PVC SLEEVES
FOR FIBRE OPTIC CABLES

5710
FOR CONTROL CABLES FOR SVG POWER CABLES FOR SVG POWER CABLES 2x{200mm PVC SLEEVES
MV-DB-01
5000

3500

FOR SVG POWER CABLES


200

4x{200mm PVC SLEEVES 2x{200mm PVC SLEEVES MV-DB-SG-03 MV-DB-SG-09 9x{200mm PVC SLEEVES
FOR POWER CABLES MV-DB-SG-02
1629 400

FOR CONTROL CABLES FOR SVG CONTROL CABLES


LV-DB-17 MV-DB-SG-04 GS
SHT-06 240 1130 400 2080 3000 240 LV-DB-23 SHT-06
650 400 2562 2400 900 700 2400 1140 400 900 300 1050
3

1400
D C
0
0

GS
(T

GS S5 GS GS
Y

S5 GS GS
450

P
)

L L L L
900 SP 900 SP SP S5 SP S5
1050 676
REFERENCE DRAWINGS
424 (TYP.) 900 300 1000 300 1200 668 1050 400 2120 240 2060 1024 1050 240 3360
H 1284 1273 300 2600 NO. DRAWING TITLE DRAWING No. REVISION H
1 SINGLE LINE DIAGRAM-OVERALL HV/MV SAAD2-SS-E-SLD-003 0

FOUNDATION RAFT 2x{200mm PVC SLEEVES 2 OVERALL ELECTRICAL EQUIPMENT LAYOUT SAAD2-SS-E-DLD-002 0
SHT-06

PROJECTION (TYP.) FOR SVG POWER CABLES


E

3 SUBSTATION BUILDING (SWITCHGEAR AND CONTROL ROOM) EQUIPMENT LAYOUT SAAD2-SS-E-DLD-003 1


MV-DB-SG-01
4 LAYOUT AND DETAILS OF DUCTBANKS , HANDHOLES, PULLPIT AND TRENCHES SAAD2-SS-C-DLD-018 0

SHT-05
B
GRAPHIC SCALE:
5585 3390 5585 4600 6000 6000 5162 938 520 2410 2330 3580 4610 7200 6400 5990 7240 7140
I 0 0.5 1 2 3 4 5 6 7 8 9 10m I
84680
SCALE : 1 : 100

20 19 17 16 15 14 13 12 11 10 9 7 6 5 4 3 2 1

REVISIONS
REVISION DATE PARTICULARS DESIGNED APPROVED
SLEEVES OPENING DETAIL
0 14.01.2024 ISSUED FOR APPROVAL AJEC MAK

- WALL AND FLOOR OPENING-CABLE BASEMENTLEVEL @ -1.20m OPENING TYPE OF


OPENING / SLEEVES DESCRIPTIONS/ USAGE
SCALE 1:100 MARKED MOUNTING

S5 WALL 2x{200mm PVC SLEEVES FOR SPARE

S6 WALL 2x{110mm PVC SLEEVES FOR SPARE


J J
S7 WALL 1x{110mm & 1x{50mm PVC SLEEVES FOR STAIR CASE

GS WALL/FLOOR 1x{50mm PVC SLEEVE FOR GROUNDING

SP WALL COMPANY SAAD TWO RENEWABLE


2x{90mm PVC SLEEVE FOR SUMP PUMP DRAINAGE
OWNER :
ENERGY COMPANY

OWNER
ENGINEER:
SgurrEnergy

K SEPCOIII ELECTRIC POWER K


CONTRACTOR:
CONSTRUCTION CO. LTD BRANCH

DESIGN
INSTITUTE:
AL-JAZIRAH ENGINEERS & CONSULTANTS

SA’AD-2 SOLAR PV INDEPENDENT POWER PLANT


PROJECT
TITLE:

WALL AND FLOOR OPENING - SUBSTATION BUILDING (SWITCHGEAR AND CONTROL ROOM)
DRAWING
TITLE:

L APPROVED BY: MAK DESIGNED BY: AJEC SHEET NO.: 03 of 06 PAPER SIZE: A0
L

REVIEWED BY: MH SCALE: None DRAWING NO. REVISION ISSUED FOR

PREPARED BY: SKS DATE: 09.01.2024 SAAD2-SS-S-DLD-005 0 IFA

841x1189 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
NOTES

FOR NOTES, REFER SHEET-01 OF 06

N
A A

20 18 16 15 14 13 12 11 8 6 5 4 3 2 1
84680

7120 7340 4700 6000 6000 6100 520 5910 7020 7200 6400 5990 7240 7140

B EL. +3.171 B
TOCA

EL. +6.40 EL. +6.40


EL. +3.171 EL. +5.271 EL. +3.171 EL. +5.271
TOP TOP
TOCA TOCA TOCA TOCA

A A
RAILING WITH BASEMENT EL. +5.271
RAILING WITH BASEMENT
ROOF BELOW TOCA
SLOPE

SLOPE
ROOF BELOW
2%

2%

STAIR-1
EL. +6.40 {125mm PIPE
3600

3600
TOP HCS 150mm THK. PRECAST HCS 150mm THK. PRECAST
SLEEVE C.O.S +8.43 EL. +9.525 EL. +6.40
PARAPET WALL (TYP.) EL. +6.40 PARAPET WALL (TYP.)
1600 EL. +9.525
STAIR-3 TOP TOP STAIR-2 TOP
TOP DN

B DSD B
1.03
C O

C
A
C

SHT-05

4500
DSD O

C
1.01
5585

5585
400x400x40 PRECAST
M CONCRETE ROOF TILES
LOOSELY LAID (TYP.)

M M
EL. +6.071
LEGEND
EL. +6.071 M M
TOCA
TOCA

2600
C C EL ELEVATION

FFL FINISHED FLOOR LEVEL

TT SLAB

TT SLAB
3390

3390
TOCA TOP OF CONAPY
2% SLOPE

2% SLOPE

2% SLOPE

2% SLOPE

2% SLOPE
TOP TOP OF PARAPET
D ROOF D
TYP TYPICAL

D D
M
FLOOR OPENING

PVC SLEEVE OPENING IN WALL


EL. +9.525
TOP
5605

5605
O

C
EL. +6.071
DSD
1.02 TOCA

E E E E
EL. +9.525
150mm THK. PRECAST
3400

3400
TOP
PARAPET WALL (TYP.)
38040

EL. +6.071
TOCA
RAILING WITH BASEMENT

F ROOF BELOW F
{90mm PIPE SLEEVE
EL. +9.525
C.O.S +8.72
TOP M M M

5390
6560

2% SLOPE
15 14 13

2% SLOPE
F EL. +5.511 F
TOCA

3042
EL. +9.525

2% SLOPE
2% SLOPE
TT SLAB G TOP H

TT SLAB
M

H H
EL. +9.525
TOP

5360
M M

M
EL. +9.525
4900

TOP
EL. +9.525
TOP EL. +5.271
2% SLOPE
TOCA
K

M
G J G
K K {100mm PIPE
SLEEVE C.O.S +8.42
EL. +9.525
TOP

5710
5000

EL. +6.10 {75mm PIPE


TOP SLEEVE C.O.S +8.42
SHT-06 {90mm PIPE O

C
O

C SHT-06
SLEEVE C.O.S +6.14
D DSD
2.01
DSD
2.02
C
L L L M
EL. +6.10 700 4500 REFERENCE DRAWINGS
1500
H TOP H
NO. DRAWING TITLE DRAWING No. REVISION

150mm THK. PRECAST {125mm PIPE 1 SINGLE LINE DIAGRAM-OVERALL HV/MV SAAD2-SS-E-SLD-003 0
{90mm PIPE EL. +5.271 150mm THK. PRECAST
PARAPET WALL (TYP.) SLEEVE C.O.S +8.43 700x300mm WIDE 2 OVERALL ELECTRICAL EQUIPMENT LAYOUT SAAD2-SS-E-DLD-002 0
SLEEVE C.O.S +8.72 TOCA PARAPET WALL (TYP.)
SHT-06

OPENING IN PARAPET
E

3 SUBSTATION BUILDING (SWITCHGEAR AND CONTROL ROOM) EQUIPMENT LAYOUT SAAD2-SS-E-DLD-003 1


FOR PACU CABLE ENTRY
4 LAYOUT AND DETAILS OF DUCTBANKS , HANDHOLES, PULLPIT AND TRENCHES SAAD2-SS-C-DLD-018 0

SHT-05
B
GRAPHIC SCALE:
5585 3390 5585 4600 6000 6000 5262 838 520 2410 2330 3580 4610 7200 6400 5990 7240 7140
I 0 0.5 1 2 3 4 5 6 7 8 9 10m I
84680
SCALE : 1 : 100

20 19 17 16 15 14 13 12 11 10 9 7 6 5 4 3 2 1

REVISIONS
REVISION DATE PARTICULARS DESIGNED APPROVED

0 14.01.2024 ISSUED FOR APPROVAL AJEC MAK

- WALL AND FLOOR OPENING -ROOF PLAN


SCALE 1:100

J J

COMPANY SAAD TWO RENEWABLE


OWNER :
ENERGY COMPANY

OWNER
ENGINEER:
SgurrEnergy

K SEPCOIII ELECTRIC POWER K


CONTRACTOR:
CONSTRUCTION CO. LTD BRANCH

DESIGN
INSTITUTE:
AL-JAZIRAH ENGINEERS & CONSULTANTS

SA’AD-2 SOLAR PV INDEPENDENT POWER PLANT


PROJECT
TITLE:

WALL AND FLOOR OPENING - SUBSTATION BUILDING (SWITCHGEAR AND CONTROL ROOM)
DRAWING
TITLE:

L APPROVED BY: MAK DESIGNED BY: AJEC SHEET NO.: 04 of 06 PAPER SIZE: A0
L

REVIEWED BY: MH SCALE: None DRAWING NO. REVISION ISSUED FOR

PREPARED BY: SKS DATE: 09.01.2024 SAAD2-SS-S-DLD-005 0 IFA

841x1189 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
NOTES

FOR NOTES, REFER SHEET-01 OF 06

A A

20 18 16 15 14 13 12 11 8 6 5 4 3 2 1

84680

7120 7440 4600 6000 6000 6100 520 5910 7020 7200 6400 5990 7240 7140

EL. +12.40 TOP

CANOPY

PARAPET WALL (TYP)


PARAPET WALL (TYP) STAIRCASE-1
B EL. +9.525 TOP B
TT SLAB

EL. +6.90 BOB

600

600

600

600
1250x1100 (BOO+5.70) 1.2M WIDE CANOPY

1100
1.2M WIDE CANOPY
1800 P1 RAD TO PACU-1A,1B 3000 P1 783 1800 P1 2646 600 P1 1500 817
783

500

500
2387 1250
500

500

500
SC SC SC
LOADING AND 2525 600 WALL OPENING WALL OPENING LOADING AND

3300
UNLOADING 600x500 (BOO+2.45) 600x500 (BOO+2.45) UNLOADING

2450

2450
PLATFORM 33kV SWGR. ROOM PLATFORM
HAND RAIL FOR PRD-1.01 FOR PRD-1.02 HAND RAIL
EL. +2.40
FFL
C EL. +2.40 C
FFL

800
800

(CLEAR HEIGHT)
800

800
L1 L1 L1
1950

L1

1950

1950

1950

1950

1950

1950

1950
1000 300 1000 300 300 1000 1000 300
3200

3200

3200

3200

3200

3200

3200

3200
2050 240 CABLE BASMENT EL.+0.00
EL.+0.00 SP SP 240 2310 2150 240 SP 240 1860

3000
SP 2474 1300 1300
2202 1500
(TOCR) 900 (TOCR)
240 1910 1254 300 SP

800

800
2850 900 SP 240 1810
S5 900 S6 240 1860 S5 SP 1150
300 1400 S5 SP

800
1300

1300

1300
240 S6 VARIES

150
S7

150
S5
S7 GS GS GS (TOC) GS S7 LEGEND

300 1300 300 1388 300 1400 1450 300 1500 300
1076 1364 300 542 1400 300 900 1500 300 1057 3000 1265 300 2480 300 BOB BOTTOM OF BEAM
300 3140 300 1800 3786 300
2.624m WIDE OPENING 3.0m WIDE OPENING
EL ELEVATION
2x{200mm PVC FOR 33kV POWER 6x{200mm PVC SLEEVES FOR 1.30m WIDE OPENING FOR 33kV 1x{200mm PVC SLEEVES
FOR 33kV POWER 2x{200mm PVC
CABLES FROM XFMR. OUTDOOR CONTROL CABLES POWER CABLES FROM XFMR. FOR GT POWER CABLES FFL FINISHED FLOOR LEVEL
5x{200mm PVC SLEEVES 2x{200mm PVC SLEEVES CABLES FROM XFMR. SLEEVES FOR
SLEEVES FOR
D FOR OUTDOOR CONTROL FOR GT POWER CABLES
GT POWER CABLES GT POWER CABLES 2x{200mm PVC SLEEVES 2x{200mm PVC SLEEVES 2x{200mm PVC SLEEVES TOC TOP OF CONCRETE D
CABLES FOR GT POWER CABLES FOR GT POWER CABLES FOR GT POWER CABLES
TOCR TOP OF CROWN LEVEL
TOP TOP OF PARAPET

TYP TYPICAL
A SECTION
WKL WALKWAY FINISHED LEVEL
1/2/3/4 SCALE 1:100
C.O.S CENTRE OF SLEEVES
SWGR. SWITCHGEAR
XFMR TRANSFORMER

FLOOR OPENING

PVC SLEEVE OPENING IN WALL

PVC SLEEVE OPENING IN FLOOR

E E

A B C D E F G J L
PARAPET
WALL
38040

TOP 3600 5585 3390 5605 3400 5390 5360 5710

F EL. +12.40 F

SCUPPER TOCA
DRAIN (TYP.) EL. +11.168

STAIR-1
PARAPET
WALL
TOP
EL. +9.525

{90mm PIPE SLEEVE


970 {100mm PIPE
G C.O.S +8.72 {75mm PIPE G
SLEEVE C.O.S +8.42 150mm THK.
2% SLOPE SLEEVE C.O.S +8.42
2% SLOPE PARAPET WALL

SCUPPER
DOWN SPOUT DRAIN (TYP.)
(TYP.)

200
1200 550 1050
1500 {90mm PVC PIPE
600

600

600
1100
1600 200 FOR WATER SUPPLY
970 PL

500
1545 200

550x500mm FOR EXHAUST FAN


TO BATTERY ROOM

BOO+6.05, BOO+4.65,BOO+3.25
P1 SC P1 SC P1
1550 200
33kV SWGR. ROOM
500

500
CL CL

900
REFERENCE DRAWINGS
SC 850 200
H TOCA H
NO. DRAWING TITLE DRAWING No. REVISION
EL. +5.168 CL SC

500
1 SINGLE LINE DIAGRAM-OVERALL HV/MV SAAD2-SS-E-SLD-003 3
CL 260mm THK. INSULATED
260mm THK. INSULATED
PRECAST WALL (TYP.) 2 OVERALL ELECTRICAL EQUIPMENT LAYOUT SAAD2-SS-E-DLD-002 2
PRECAST WALL (TYP.) BATTERY ROOM 3 SUBSTATION BUILDING (SWITCHGEAR AND CONTROL ROOM) EQUIPMENT LAYOUT SAAD2-SS-E-DLD-003 1
TELECOM.ROOM

900
4 LAYOUT AND DETAILS OF DUCTBANKS , HANDHOLES, PULLPIT AND TRENCHES SAAD2-SS-C-DLD-018 0

D2 D1 D4

500
TOCA
EL. +3.068

850
FFL FFL GRAPHIC SCALE:
EL. +2.40 EL. +2.40 0 0.5 1 2 3 4 5 6 7 8 9 10m
800

800
SCALE : 1 : 100
STAIR-1
I I
GRAPHIC SCALE:
L1 L1
0 0.5 1 2 3 4 5m
(CLEAR HEIGHT)

1.5Mtr. WIDE 300 1000 300 1000 1.5Mtr. WIDE

3040

3040
SCALE : 1 : 50
SIDEWALK

3300
SIDEWALK
550 3000 REVISIONS
CABLE BASEMENT
3000

TOA TORW EL. +0.30 TOA


TOA REVISION DATE PARTICULARS DESIGNED APPROVED
EL.+0.00 EL.+0.00 1400 EL.+0.00
0 14.01.2024 ISSUED FOR APPROVAL AJEC MAK
900

900

900
1200 2000 696 4000 700 500 3500 840 1652 400 1992

900
3500 753 650 2000 TOS
1300

500 (TYP) 500 (TYP)


EL. -1.20

200

200
GS TOS
500 TOS GS GS
EL. -1.30 500
EL. -1.30

J J

5x{200mm PVC SLEEVES FOR 9x{200mm PVC SLEEVES FOR


5x{200mm PVC SLEEVES FOR 2x1x110mm DIA PVC SLEEVES SAAD TWO RENEWABLE
3.0m WIDE OPENING INCOMING POWER CABLES 8x{200mm PVC SLEEVES FOR INCOMING POWER CABLES 8x{200mm PVC SLEEVES FOR 2x3x110mm DIA PVC SLEEVES COMPANY
INCOMING POWER CABLES FOR FIBRE OPTIC CABLES
FOR 33kV POWER INCOMING POWER CABLES INCOMING POWER CABLES FOR FIBRE OPTIC CABLES OWNER :
MV-DB-11 MV-DB-08 ENERGY COMPANY
CABLES FROM XFMR. MV-DB-09 MV-DB-07
MV-DB-10

OWNER
ENGINEER:
SgurrEnergy
B SECTION
1/2/3/4 SCALE 1:50

K SEPCOIII ELECTRIC POWER K


CONTRACTOR:
CONSTRUCTION CO. LTD BRANCH

DESIGN
INSTITUTE:
AL-JAZIRAH ENGINEERS & CONSULTANTS

SA’AD-2 SOLAR PV INDEPENDENT POWER PLANT


PROJECT
TITLE:

WALL AND FLOOR OPENING - SUBSTATION BUILDING (SWITCHGEAR AND CONTROL ROOM)
DRAWING
TITLE:

L APPROVED BY: MAK DESIGNED BY: AJEC SHEET NO.: 05 of 06 PAPER SIZE: A0
L

REVIEWED BY: MH SCALE: None DRAWING NO. REVISION ISSUED FOR

PREPARED BY: SKS DATE: 09.01.2024 SAAD2-SS-S-DLD-005 0 IFA

841x1189 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
NOTES

FOR NOTES, REFER SHEET-01 OF 5

A A

16 17 19 20

14560

1 2 3 4 5 6 7 9 5585 3390 5585


42160
PARAPET
7140 7240 5990 6400 7200 4610
WALL

700x300mm WIDE
OPENING IN PARAPET
PARAPET WALL (TYP)
FOR PACU CABLE ENTRY EL. +9.525 TOP

300
700 1045
B TT SLAB
2% SLOPE
B
600

600

600
1000
1650 P1 2682 400 1500 1950 400 2100
700 1045 P1 WALL OPENING P1 1008
550 1250 400 1100 1100x1000 400x400 BOO+2.45 (FFL)

500
400

400
TELECOM.ROOM CL
BOO+5.75
WALL OPENING
300

600

600
1200 1200
400x400 BOO+2.45 (FFL) 1250x1000 TOILET
700x300mm WIDE CONTROL ROOM
2500

BOO+5.75

2450

2450
OPENING IN PARAPET AUX. ROOM 1740

500
P1 P1
FOR PACU CABLE ENTRY
CL
EL. +2.40
650 200
FFL
800

800

800

800

800
C C

(CLEAR HEIGHT)
L1 L1 SC

800
CABLE BASMENT
1950

1950

1950

1950
1050

1050
S5 300 3500 S5 S5 CL

3200
3300
1200 300 1000 300 300 1000
EL.+0.00 SP 1200 300 SP EL.+0.00

3000
3360 1050x1050mm OPENING
(TOCR) (TOCR)
670 1050 FOR EF. FROM BASEMENT 2400 2562

900

900
1050 300 900 SP 240 400 1140 240 3000 SP 1050 1024 400650
2400 700 900 2080 400
300 900 2060 240
2600
S5 GS S5 VARIES (TOC) 240 2550
GS GS

LEGEND
1050x1050mm OPENING
2x{200mm PVC SLEEVES 9x{200mm PVC SLEEVES FOR EF. FROM BASEMENT
2x{200mm PVC SLEEVES 1050x1050mm OPENING
FOR SVG POWER CABLES FOR SVG CONTROL CABLES 7x{200mm PVC SLEEVES BOB BOTTOM OF BEAM
2x{200mm PVC SLEEVES FOR EF. FROM BASEMENT
FOR SVG POWER CABLES
MV-DB-SG-01 LV-DB-23 FOR SVG POWER CABLES
FOR SVG POWER CABLES EL ELEVATION
MV-DB-SG-09 MV-DB-SG-03
MV-DB-SG-02
FFL FINISHED FLOOR LEVEL

775

800

800
D L1 D
TOC TOP OF CONCRETE

TOCR TOP OF CROWN LEVEL


C SECTION

1050
1.5Mtr. WIDE S5 1000 300 S5 1.5Mtr. WIDE
SCALE 1:100 1000 300 TOP TOP OF PARAPET
SHT-01

3200
SIDEWALK SIDEWALK
TYP TYPICAL

2400
TOA WKL WALKWAY FINISHED LEVEL
4x{200mm PVC SLEEVES TOA
EL.+0.00
FOR CONTROL CABLES FLOOR OPENING

1100
EL.+0.00

900

900
1050 675 LV-DB-17 PVC SLEEVE OPENING IN WALL
2120 400 1200 300 424 424 424 1284
900
2x{200mm PVC SLEEVES
1000 300 PVC SLEEVE OPENING IN FLOOR
10 11 13 14 15 16 900 GS FOR POWER CABLES S5
S5 GS
MV-DB-SG-04
2410 6620 6000 6000 4600

E E

FFL
EL. +2.40 D SECTION
SHT-01 SCALE 1:50

CABLE BASEMENT
(CLEAR HEIGHT)

3300
2080 1500 TORW EL. +0.30
3000

F F

800 2560 650 2400


1200

1500mm WIDE OPENING FOR 3x{200mm PVC SLEEVES 7x{200mm PVC SLEEVES
SST CONTROL CABLES FOR SST POWER CABLES FOR SVG POWER CABLES

LV-CT-01 MV-DB-SST-01 MV-DB-SG-10

G F
G
SECTION
SHT-03 SCALE 1:50

L K H F E D C B A

38040

5000 4900 6560 3400 5605 3390 5585 3600


REFERENCE DRAWINGS
H PARAPET NO. DRAWING TITLE DRAWING No. REVISION H
WALL 1 SINGLE LINE DIAGRAM-OVERALL HV/MV SAAD2-SS-E-SLD-003 0
TOP
EL. +9.525 2 OVERALL ELECTRICAL EQUIPMENT LAYOUT SAAD2-SS-E-DLD-002 0

150mm THK.
2% SLOPE 2% SLOPE
PARAPET WALL

SCUPPER
DRAIN (TYP.)
GRAPHIC SCALE:
0 0.5 1 2 3 4 5 6 7 8 9 10m

SCALE : 1 : 100

I TOP
I
600

600

600
1200 1200 200 1600 1500 260mm THK. INSULATED GRAPHIC SCALE:
EL. +6.40

1100
PRECAST WALL (TYP.) 0 0.5 1 2 3 4 5m
P1 P1
P1 SC
SCALE : 1 : 50

500
CL OPENING FOR
HVAC DUCT REVISIONS
1850x1100mm 1850 1265
REVISION DATE PARTICULARS DESIGNED APPROVED
B.O.O 5.70
260mm THK. INSULATED 0 14.01.2024 ISSUED FOR APPROVAL AJEC MAK
PRECAST WALL (TYP.)

3300
D2

J J

FFL FFL
EL. +2.40 EL. +2.40 SAAD TWO RENEWABLE
COMPANY
OWNER :
800

800

STAIR-3 ENERGY COMPANY

L1 L1 L1
(CLEAR HEIGHT)

1.5Mtr. WIDE 300 900 300 1350 300 900 1.5Mtr. WIDE OWNER
SIDEWALK SgurrEnergy
3300

SIDEWALK ENGINEER:
3000 550
CABLE BASEMENT
3000

TOA TORW EL. +0.30


TOA TOA
EL.+0.00 EL.+0.00 EL.+0.00
900

900
K 5000 860 750 2000 500 4000 455 SEPCOIII ELECTRIC POWER K
450 3500 700 700 3500 CONTRACTOR:
900

TOS 2000 670 595


EL. -1.20 1300 CONSTRUCTION CO. LTD BRANCH
GS TOS 500
GS
GS
EL. -1.30

DESIGN
INSTITUTE:
AL-JAZIRAH ENGINEERS & CONSULTANTS

6x{200mm PVC SLEEVES FOR 3.0m WIDE OPENING


SA’AD-2 SOLAR PV INDEPENDENT POWER PLANT
9x{200mm PVC SLEEVES FOR PROJECT
8x{200mm PVC SLEEVES FOR 11x{200mm PVC SLEEVES FOR 5x{200mm PVC SLEEVES FOR
8x{200mm PVC SLEEVES FOR
INCOMING POWER CABLES INCOMING POWER CABLES INCOMING POWER CABLES FOR 33kV POWER TITLE:
INCOMING POWER CABLES INCOMING POWER CABLES INCOMING POWER CABLES
MV-DB-06 CABLES FROM XFMR.
MV-DB-01 MV-DB-04 MV-DB-05
WALL AND FLOOR OPENING - SUBSTATION BUILDING (SWITCHGEAR AND CONTROL ROOM)
DRAWING
MV-DB-02 MV-DB-03
TITLE:

L E SECTION L
APPROVED BY: MAK DESIGNED BY: AJEC SHEET NO.: 06 of 06 PAPER SIZE: A0
SHT-01 SCALE 1:50

REVIEWED BY: MH SCALE: None DRAWING NO. REVISION ISSUED FOR

PREPARED BY: SKS DATE: 09.01.2024 SAAD2-SS-S-DLD-005 0 IFA