SS-S-DLD-005-0 Wall and Floor Opening SS Building (SWGR & Control)
SS-S-DLD-005-0 Wall and Floor Opening SS Building (SWGR & Control)
NOTES
84680
4. FUTURE OPENING SHALL BE SEALED WITH THREE (3) HOURS FIRE STOP.
7120 7440 4600 6000 6000 6100 520 5910 7020 7200 6400 5990 7240 7140
5. SIZE OF HVAC OPENING SHALL BE AS PER THE MECHANICAL APPROVED DESIGN
7. PROVIDE {110mm PVC SLEEVES IN SUITABLE LOCATIONS FOR STAIR CASE LIGHTING
AND CANOPY LIGHTING
1500mm WIDE EL. +0.30 1500mm WIDE EL. +0.30 10. ALL ENTRY AND EXIT OF DUCT BANKS AND TRENCHES AT WALL OF CABLE BASEMENT
CL SC WALKWAY (WKL) CL SC WALKWAY (WKL) CL SC SHALL BE SEALED WITH FIRE PROOF MATERIAL AFTER CABLE PULLING TO PREVENT
FIRE PROGRESSION AS WELL AS TO PREVENT WATER INGRESS.
A A
GS GS GS 1050 1325 2175 1050 GS GS GS 625 1050 2025 1050 GS GS GS
EL. +0.30
1050 975 GS 1.0M HIGH 11. ANY MINOR CHANGES / ADJUSTMENT TO CLEAR ANY CLASHES WITH OTHER DISCIPLINES
EL. +2.40
CL SC CL SC CL SC GS
(TOL)
EL. +0.30
EL. +0.30
EL. +2.40
DN
(FFL)
GS DN GS EXTENDED CABLE HANDRAILING (TYP) D6 GS DN AS PER ACTUAL SITE CONDITIONS TO BE DISCUSSED WITH CLIENT AT SITE &
(TOL)
(TOL)
(FFL)
SF
3600
3600
D6
1050
1050
1050
1050
1050
EL. +2.40 EXTENDED CABLE BASEMENT CORRECTIONS TO BE REFLECTED IN THE MARKUP / AS BUILT DRAWINGS.
SF (TOC)
SF BASEMENT SF SF
3000 EL. +2.40 UP
1125
1125
1125
1125
1125
2387 1250 2646 600
1800 2525 600 1800
GS GS P1 P1 GS P1 (TOC) P1 GS
S4 S4 GS D6 GS S4
B B
S1
1100
SC SC SC
WALL OPENING
1265
C 1500 GS C
OPENING FOR 1250x1100 (BOO+5.70) WALL OPENING
600x500 (BOO+2.45) A
2820
HVAC DUCT RAD TO PACU-1A,1B 600x500 (BOO+2.45)
FOR PRD-1.01 FROM FFL P1 SHT-05
1000
1000
700
700
1850x1100mm B.O.O 5.70 FOR PRD-1.02 FROM FFL
700
1850
1000
800
800
700
700
800
5585
5585
700
800
800
800
BA04 A1 A2 A3 A4 A5 A6 A3 A7 A8 BA02 B1 B2 B3 B4 B5 B6 B3 B7 B8
33kV SWGR. ROOM
P1 3300 3500 3400 1400 1820 14000 980 1400 3210 3690
3680 3630 3270 1400 2270 11100 3430 1400 770 6130
1520
84620x14500
150 A9 A10 300(TYP) 150 B12 B9 300(TYP) LEGEND
1500
280
280
C C BOO BOTTOM OF OPENING
GS GS
280
280
EF EXHAUST FAN
D2 D2
FFL FINISHED FLOOR LEVEL
3390
3390
SC CL CL SC SF SUPPLY FAN
D SWGR. SWITCHGEAR
D
A10 B9
280
280
GS 150 A9 300(TYP) A9 150 B12 300(TYP) GS
B10 TYP TYPICAL
D D
280
280
280
TOL TOP OF LANDING
TOP TOP OF PARAPET
1520
3680 3630 3270 1400 2270 11100 3430 1400 770 6130 3300 3500 3400 1400 1820 14000 980 1400 3210 3690 TOC TOP OF CONCRETE
800
BA03 A1 A2 A3 A4 A5 A6 A3 A7 A8 BA01 B1 B2 B3 B4 B5 B6 B3 B7 B8 LOADING AND
5605
5605
UNLOADING FLOOR OPENING
PLATFORM PVC SLEEVE OPENING IN WALL
1.0x1.0m WIDE
2800
950 1000 OPENING FOR
PVC SLEEVE OPENING IN FLOOR
1250x1100 EMERGENCY EXIT P1
1500
BOO+5.70
1000
GS D7
E E E E
D7
1200
1350
1350
1115
800 C7 C7 GS
D1 EL. +2.40
P1 900x900mm OPENING
3400
3400
850x600mm OPENING (FFL) 900x500mm
3000 WIDE CORRIDOR CL SC
BA05
1050
1050
EL. +2.40 SC CL FOR HVAC DUCT
BA05
38040
2750
D3
GS D3 500 538 D3 S2 (FFL) S2 D3 GS
C1 C1
G F
575
1100
GS
1200
1200
GS GS GS GS GS GS S1 GS GS
E4 E5
BS PL
500
EL. +0.30 400
500
700 500x450mm 6100 2240 600 {90mm PVC PIPE
3050
6900
2000
3150
P1
200
(WKL) MECH.OPENING S3 600 D10 EL. +2.35 CL SC FOR WATER SUPPLY
1100 D4
(FFL) TO BATTERY ROOM
5390
4810 6900 300 6100 300 2950 2640
S3 S3
350
290
4150
4150
290 GS
6560
4190
(TYP) (TYP)
15 14 13 FIRE FIGHTING ROOM
600
GS
3390
C2 C2 E1 E2 E3 D1
D4 GS GS GS
2000
5630x10770 D10 1290 580 2080 580
F F
1000 EL. +2.40
H3
BS
2000
BS
X4
(FFL)
H2
C6 C6
X0 X1 X2
H1
300
500
G
1400
1400
C3 G
350 1000260
C3
H0
S2
1200
600
1500
E1 E2 E3 BATTERY ROOM
PS
1910
500x500mm D11 BS
610
610
D5
H C4 C4 H P1
SST-10BBT11 WALL OPENING 200
1200
1600
2000
2240 400
FOR EXHAUST FAN S2 400
350
800 EL. +2.40
BOO+5.85
5360
D12
5060
500
200 (TYP.)
P1 (FFL)
FIRE WALL
D2
1550
1290 580 2080 580
600
D6
3150
E1 E2 E3
1600
550x500mm
4900
550
700x400mm
S2 600 BS
OPENING FOR 290 290 BS BS FOR EXHAUST FAN
2500
S3
6.0M WIDE ROAD
S3
900 350
700
(TYP) (TYP) BOO+6.05
2000
HVAC DUCT 1800 GS
1170
1050
D7 BOO+4.65
800
SST-10BBT12 BOO+6.05 GS GS GS
C5
7690
7690
BOO+3.25
G J J G
C5
596
600
E1 E2 E3
H3
K K 1500 D3 CL D5
250
300
D3 F1
X4
H2
1530
X0 X1 X2
SC
EL. +0.25
1400
800x800mm OPENING
H1
3100
3100
2000
WWC D13 600x500mm
(FFL)
24000x16480
CABLE TRENCH
MECH.OPENING
1700 EL. +2.40 AUX. ROOM
350
BOD+5.75 F2
600
1000
5710
1.0x1.0m WIDE 400x400mm (FFL) 1960 2200 2000
5000
600
1400
C7 C7 WALL OPENING E1 E2 E3
350
OPENING FOR EWC D13
FOR EXHAUST FAN 1300 400 2240 400
GS EMERGENCY EXIT 1.0x1.0m WIDE TELECOM.ROOM
1600
BOO+4.15 TOILET
950 1000 F4
CL CL 400 200
2540
2350
400
FIRE WALL 3300x5430 3000 640
1900
1900
200
1000
S1 S1 S1 P1 F5
L L EG-01 L L
P1 P1 D8 D5 2100 400 1950 P1 400 2682 P1
D5 1100 400 1250 550 1500 REFERENCE DRAWINGS
1200 1500mm WIDE
1200 1550
H 700 4500 WALKWAY NO. DRAWING TITLE DRAWING No. REVISION H
{125mm SLEEVE WALL OPENING 1100x1000 1250x1000 WALL OPENING 600x600mm 1 SINGLE LINE DIAGRAM-OVERALL HV/MV SAAD2-SS-E-SLD-003 3
SC
C.O.S +4.65 400x400 BOO+2.45 BOO+5.75 BOO+5.75 400x400 BOO+2.45 OPENING FOR 2 OVERALL ELECTRICAL EQUIPMENT LAYOUT SAAD2-SS-E-DLD-002 2
CL
SHT-06
SHT-05
FROM FFL FROM FFL HVAC DUCT
B
E
FIRE WALL 3 SUBSTATION BUILDING (SWITCHGEAR AND CONTROL ROOM) EQUIPMENT LAYOUT SAAD2-SS-E-DLD-003 1
700x300mm WIDE 4 LAYOUT AND DETAILS OF DUCTBANKS , HANDHOLES, PULLPIT AND TRENCHES SAAD2-SS-C-DLD-018 0
OPENING IN PARAPET
FOR PACU CABLE ENTRY
GRAPHIC SCALE:
5585 3390 5585 4600 6000 6000 9030 2330 3580 4610 7200 6400 5990 7240 7140
I 0 0.5 1 2 3 4 5 6 7 8 9 10m I
84680
SCALE : 1 : 100
20 19 17 16 15 14 13 12 11 10 9 7 6 5 4 3 2 1
REVISIONS
REVISION DATE PARTICULARS DESIGNED APPROVED
33kV SWGR. OPENING DETAIL FOR BA03& BA04 0 14.01.2024 ISSUED FOR APPROVAL AJEC MAK
OPENING TYPE OF OPENING SIZEs IN mm OPENING / SLEEVES - WALL AND FLOOR OPENING -GROUND FLOOR
MARKED MOUNTING HEIGHT DESCRIPTIONS/ USAGE SCALE 1:100
A2 FLOOR 3270x700 SLAB THK. 33kV SWGR.,CONTROL ROOM, AUX. ROOM AND COMM. ROOM 33kV SWGR.,CONTROL ROOM, AUX. ROOM AND COMM. ROOM SLEEVES OPENING DETAIL
J J
A3 FLOOR 1400x1000 SLAB THK. OPENING TYPE OF OPENING SIZEs IN mm OPENING / SLEEVES OPENING TYPE OF OPENING SIZEs IN mm OPENING / SLEEVES OPENING TYPE OF
OPENING / SLEEVES DESCRIPTIONS/ USAGE
MARKED MOUNTING HEIGHT DESCRIPTIONS/ USAGE MARKED MOUNTING HEIGHT DESCRIPTIONS/ USAGE MARKED MOUNTING
A4 FLOOR 2270x700 SLAB THK.
COMPANY SAAD TWO RENEWABLE
A5 FLOOR 11100x800 SLAB THK. 33kV SWGR. OPENING DETAIL FOR BA05 D9 FLOOR 1600x400 SLAB THK. P1 WALL 1x{110mm PVC SLEEVE FOR PARAPET LIGHTING
OWNER :
ENERGY COMPANY
33kV SWGR. POWER C1 FLOOR 2750x800 SLAB THK. D10 FLOOR 2000x400 SLAB THK. S1 WALL/FLOOR 1x{160mm PVC SLEEVE FOR SPARE USAGE
A6 FLOOR 3430x700 SLAB THK. AUX.PANEL OPENINGS
CABLE OPENING
C2 FLOOR 4150x700 SLAB THK. 33kV SWGR. POWER D11 FLOOR 1000x200 SLAB THK. S2 WALL/FLOOR 2x{160mm PVC SLEEVES FOR SAS TABLE
A7 FLOOR 770x700 SLAB THK.
CABLE OPENING
C3 FLOOR 1400x1000 SLAB THK. D12 FLOOR 3150x400 SLAB THK. S3 WALL/FLOOR 1x{160mm PVC SLEEVES FOR BATTERY CABLES OWNER
A8 FLOOR 6130x800 SLAB THK.
ENGINEER:
SgurrEnergy
C4 FLOOR 610x700 SLAB THK. D13 FLOOR 1400x400 SLAB THK. S4 WALL/FLOOR 1x{110mm PVC SLEEVE IN STAIRCASE MIDLANDING & FOR CRANE
A9 FLOOR 150x280 SLAB THK.
33kV SWGR. CONTROL
A10 FLOOR 300x280 SLAB THK. CABLE OPENING C5 FLOOR 7690x800 SLAB THK. CONTROL ROOM S5 WALL 2x{200mm PVC SLEEVES FOR SPARE
C6 FLOOR 300x280 SLAB THK. 33kV SWGR. POWER E1 FLOOR 6900x600 SLAB THK. S6 WALL 2x{110mm PVC SLEEVES FOR SPARE
K 33kV SWGR. OPENING DETAIL FOR BA01& BA02 SEPCOIII ELECTRIC POWER K
CABLE OPENING CONTROL/ PROTECTION CONTRACTOR:
C7 FLOOR 150x280 SLAB THK. E2 FLOOR 6100x600 SLAB THK. S7 WALL 1x{110mm & 1x{50mm PVC SLEEVES FOR STAIR CASE
B1 FLOOR 3500x800 SLAB THK. PANEL OPENINGS CONSTRUCTION CO. LTD BRANCH
B2 FLOOR 3400x700 SLAB THK. AUX. ROOM E3 FLOOR 2950x600 SLAB THK. L1 WALL 2x{110mm PVC SLEEVES FOR SPARE/ LIGHTING
D1 FLOOR 4190x600 SLAB THK. E4 FLOOR 6900x500 SLAB THK. OPENINGS FOR SPARE/ CL WALL/FLOOR 1x{110mm PVC SLEEVE FOR CANOPY LIGHTING
B3 FLOOR 1400x1000 SLAB THK.
33kV SWGR. POWER FUTURE PANELS DESIGN
D2 FLOOR 5060x600 SLAB THK. E5 FLOOR 6100x500 SLAB THK. SC WALL/FLOOR 1x{50mm PVC SLEEVE FOR SECURITY CAMERA
B4 FLOOR 1820x700 SLAB THK.
CABLE OPENING INSTITUTE:
AL-JAZIRAH ENGINEERS & CONSULTANTS
B5 FLOOR 14000x800 SLAB THK.
D3 FLOOR 3100x400 SLAB THK. TELECOM.ROOM GS WALL/FLOOR 1x{50mm PVC SLEEVE FOR GROUNDING
D4 FLOOR 3390x600 SLAB THK. F1 FLOOR 3800x300 SLAB THK. SP WALL 1x{90mm PVC SLEEVE FOR SUMP PUMP DRAINAGE
B6 FLOOR 980x700 SLAB THK. AUX.PANEL OPENINGS
SA’AD-2 SOLAR PV INDEPENDENT POWER PLANT
PROJECT
D5 FLOOR 1910x400 SLAB THK. F2 FLOOR 2200x300 SLAB THK. BS FLOOR 1x{110mm PVC SLEEVE FOR BATTERY ROOM FLOOR DRAINAGE TITLE:
B7 FLOOR 3210x700 SLAB THK.
D6 FLOOR 1550x600 SLAB THK. F3 FLOOR 600x600 SLAB THK. COMMUNICATION PS WALL 1x{125mm PVC SLEEVE FOR PLUMBING
WALL AND FLOOR OPENING - SUBSTATION BUILDING (SWITCHGEAR AND CONTROL ROOM)
DRAWING
B8 FLOOR 3690x800 SLAB THK.
PANEL OPENINGS TITLE:
D7 FLOOR 900x700 SLAB THK. F4 FLOOR 1600x200 SLAB THK.
B9 FLOOR 300x280 SLAB THK. 33kV SWGR. POWER
L CABLE OPENING APPROVED BY: MAK DESIGNED BY: AJEC SHEET NO.: 01 of 06 PAPER SIZE: A0
L
D8 FLOOR 3300x400 SLAB THK. F5 FLOOR 3000x300 SLAB THK.
B10 FLOOR 150x280 SLAB THK.
REVIEWED BY: MH SCALE: None DRAWING NO. REVISION ISSUED FOR
841x1189 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
NOTES
N
A A
20 18 16 15 14 13 12 11 8 6 5 4 3 2 1
84680
7120 7340 4700 6000 6000 6100 520 5910 7020 7200 6400 5990 7240 7140
A A
UP
EL. +0.30
300 L1
EL. +0.30
EL. +0.30
UP UP
(TOL)
(TOL)
(TOL)
3600
3600
DN
DN
DN
B B
C C
A
SHT-05
5585
5585
300
LEGEND
1000
L1
FFL FINISHED FLOOR LEVEL
C C
900
TYP TYPICAL
0.5% SLOPE
0.5% SLOPE
0.5% SLOPE
0.5% SLOPE
0.5% SLOPE
0.5% SLOPE
0.5% SLOPE
TOL TOP OF LANDING
21660
3390
3390
L1 CABLE BASEMENT
TOC TOP OF CONCRETE
5605
SLEEVES OPENING DETAIL
OPENING TYPE OF
OPENING / SLEEVES DESCRIPTIONS/ USAGE
MARKED MOUNTING
3400
L1
38040
SHT-06
F
F F
300 1200
RIDGE LINE
S5
5390
6560
15 14 13
{125mm SLEEVE FOR
F F
BATTERY ROOM DRAINAGE
@ +1.54 (COS)
G G
H H
0.5% SLOPE
0.5% SLOPE
0.5% SLOPE
0.5% SLOPE
5360
CABLE BASEMENT
4900
300
L1
1000
G J J G
K K
300 1000
900
CABLE BASEMENT
L1
1050x1050mm OPENING
S5
5710
FOR EF. FROM BASEMENT
5000
SHT-05
B
E
GRAPHIC SCALE:
5585 3390 5585 4600 6000 6000 5162 938520 2410 2330 3580 4610 7200 6400 5990 7240 7140
I 0 0.5 1 2 3 4 5 6 7 8 9 10m I
84680
SCALE : 1 : 100
20 19 17 16 15 14 13 12 11 10 9 7 6 5 4 3 2 1
REVISIONS
REVISION DATE PARTICULARS DESIGNED APPROVED
J J
OWNER
ENGINEER:
SgurrEnergy
DESIGN
INSTITUTE:
AL-JAZIRAH ENGINEERS & CONSULTANTS
WALL AND FLOOR OPENING - SUBSTATION BUILDING (SWITCHGEAR AND CONTROL ROOM)
DRAWING
TITLE:
L APPROVED BY: MAK DESIGNED BY: AJEC SHEET NO.: 02 of 06 PAPER SIZE: A0
L
SAAD2-SS-S-DLD-005 IFA
0
841x1189 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
NOTES
A A
N
20 18 16 15 14 13 12 11 8 6 5 4 3 2 1
84680
7120 7440 4600 6000 6000 6100 520 5910 7020 7200 6400 5990 7240 7140
2.624m WIDE OPENING 6x{200mm PVC SLEEVES FOR 1.30m WIDE OPENING
2x{200mm PVC 3.0m WIDE OPENING 2x{200mm PVC
FOR 33kV POWER OUTDOOR CONTROL CABLES FOR 33kV POWER
SLEEVES FOR FOR 33kV POWER SLEEVES FOR
FOUNDATION RAFT CABLES FROM XFMR.
B GT POWER CABLES CABLES FROM XFMR. CABLES FROM XFMR. LV-DB-01 GT POWER CABLES B
PROJECTION (TYP.)
300 1800 1860 1x{200mm PVC SLEEVES
2202 1500 2150 240
300 1300 900 2050 240 1400 300
1500 300 300 1388 240 1860 3786 300 240
FOR GT POWER CABLES
1200 1076 1364 300 542 240 1810 1000 1254 300 240 2310 1265 300 1150 1050
SP S5 GS SP S6 S5 SP GS S5 SP SP GS SP S6 SP GS S5 SP
A A
GS 3140 2624 1776 900 GS 900 900 GS
1057 3000 1450 300
300 1300 400 1300
1910
3600
3600
2480 300
2850 240
550
GT POWER CABLES
CABLES
C C
300 1400
LV-DB-10
300 1400 1500 300
A
SHT-05
3000
3000
5585
5585
3.0m WIDE OPENING
FOR 33kV POWER
3.0m WIDE OPENING CABLES FROM XFMR.
GS FOR 33kV POWER LEGEND
GS
1200
CABLES FROM XFMR.
670 595
EL ELEVATION
C C
5x{200mm PVC SLEEVES FOR FFL FINISHED FLOOR LEVEL
INCOMING POWER CABLES
500(TYP.)
3390
CABLE BASEMENT
2000
2000
MV-DB-11
TYP TYPICAL
D 6x{200mm PVC SLEEVES FOR D
INCOMING POWER CABLES FLOOR OPENING
696
MV-DB-06 PVC SLEEVE OPENING IN WALL
D D
455
5605
MV-DB-05
3500
MV-DB-10
LV-CT-01
650 753
500
GS
E E E E
7x{200mm PVC SLEEVES 5x{200mm PVC SLEEVES FOR
3x{200mm PVC SLEEVES
FOR SVG POWER CABLES
3400
3400
FOR SST POWER CABLES INCOMING POWER CABLES
2000
2000
MV-DB-SG-10 SHT-06
38040
1500 2080
MV-DB-04
F EL. -1.20 F
860
5390
INCOMING POWER CABLES
4000
11x{200mm PVC SLEEVES FOR
6560
MV-DB-08
5000
F MV-DB-03 F
CABLE BASEMENT SP
700
2450
G G
500
2x3x{110mm PVC SLEEVES GS
0.5% SLOPE
0.5% SLOPE
INCOMING POWER CABLES
2210
5360
MV-DB-07
3500
SP 3x{200mm PVC SLEEVES
4900
240
3500
840
MV-DB-02
G J J G
700 700
760 600
K K 2x1x110mm DIA PVC SLEEVES
FOR FIBRE OPTIC CABLES
8x{200mm PVC SLEEVES FOR
2x{200mm PVC SLEEVES 7x{200mm PVC SLEEVES 2x3x110mm DIA PVC SLEEVES
INCOMING POWER CABLES 3x{110mm PVC SLEEVES
FOR FIBRE OPTIC CABLES
5710
FOR CONTROL CABLES FOR SVG POWER CABLES FOR SVG POWER CABLES 2x{200mm PVC SLEEVES
MV-DB-01
5000
3500
4x{200mm PVC SLEEVES 2x{200mm PVC SLEEVES MV-DB-SG-03 MV-DB-SG-09 9x{200mm PVC SLEEVES
FOR POWER CABLES MV-DB-SG-02
1629 400
1400
D C
0
0
GS
(T
GS S5 GS GS
Y
S5 GS GS
450
P
)
L L L L
900 SP 900 SP SP S5 SP S5
1050 676
REFERENCE DRAWINGS
424 (TYP.) 900 300 1000 300 1200 668 1050 400 2120 240 2060 1024 1050 240 3360
H 1284 1273 300 2600 NO. DRAWING TITLE DRAWING No. REVISION H
1 SINGLE LINE DIAGRAM-OVERALL HV/MV SAAD2-SS-E-SLD-003 0
FOUNDATION RAFT 2x{200mm PVC SLEEVES 2 OVERALL ELECTRICAL EQUIPMENT LAYOUT SAAD2-SS-E-DLD-002 0
SHT-06
SHT-05
B
GRAPHIC SCALE:
5585 3390 5585 4600 6000 6000 5162 938 520 2410 2330 3580 4610 7200 6400 5990 7240 7140
I 0 0.5 1 2 3 4 5 6 7 8 9 10m I
84680
SCALE : 1 : 100
20 19 17 16 15 14 13 12 11 10 9 7 6 5 4 3 2 1
REVISIONS
REVISION DATE PARTICULARS DESIGNED APPROVED
SLEEVES OPENING DETAIL
0 14.01.2024 ISSUED FOR APPROVAL AJEC MAK
OWNER
ENGINEER:
SgurrEnergy
DESIGN
INSTITUTE:
AL-JAZIRAH ENGINEERS & CONSULTANTS
WALL AND FLOOR OPENING - SUBSTATION BUILDING (SWITCHGEAR AND CONTROL ROOM)
DRAWING
TITLE:
L APPROVED BY: MAK DESIGNED BY: AJEC SHEET NO.: 03 of 06 PAPER SIZE: A0
L
841x1189 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
NOTES
N
A A
20 18 16 15 14 13 12 11 8 6 5 4 3 2 1
84680
7120 7340 4700 6000 6000 6100 520 5910 7020 7200 6400 5990 7240 7140
B EL. +3.171 B
TOCA
A A
RAILING WITH BASEMENT EL. +5.271
RAILING WITH BASEMENT
ROOF BELOW TOCA
SLOPE
SLOPE
ROOF BELOW
2%
2%
STAIR-1
EL. +6.40 {125mm PIPE
3600
3600
TOP HCS 150mm THK. PRECAST HCS 150mm THK. PRECAST
SLEEVE C.O.S +8.43 EL. +9.525 EL. +6.40
PARAPET WALL (TYP.) EL. +6.40 PARAPET WALL (TYP.)
1600 EL. +9.525
STAIR-3 TOP TOP STAIR-2 TOP
TOP DN
B DSD B
1.03
C O
C
A
C
SHT-05
4500
DSD O
C
1.01
5585
5585
400x400x40 PRECAST
M CONCRETE ROOF TILES
LOOSELY LAID (TYP.)
M M
EL. +6.071
LEGEND
EL. +6.071 M M
TOCA
TOCA
2600
C C EL ELEVATION
TT SLAB
TT SLAB
3390
3390
TOCA TOP OF CONAPY
2% SLOPE
2% SLOPE
2% SLOPE
2% SLOPE
2% SLOPE
TOP TOP OF PARAPET
D ROOF D
TYP TYPICAL
D D
M
FLOOR OPENING
5605
O
C
EL. +6.071
DSD
1.02 TOCA
E E E E
EL. +9.525
150mm THK. PRECAST
3400
3400
TOP
PARAPET WALL (TYP.)
38040
EL. +6.071
TOCA
RAILING WITH BASEMENT
F ROOF BELOW F
{90mm PIPE SLEEVE
EL. +9.525
C.O.S +8.72
TOP M M M
5390
6560
2% SLOPE
15 14 13
2% SLOPE
F EL. +5.511 F
TOCA
3042
EL. +9.525
2% SLOPE
2% SLOPE
TT SLAB G TOP H
TT SLAB
M
H H
EL. +9.525
TOP
5360
M M
M
EL. +9.525
4900
TOP
EL. +9.525
TOP EL. +5.271
2% SLOPE
TOCA
K
M
G J G
K K {100mm PIPE
SLEEVE C.O.S +8.42
EL. +9.525
TOP
5710
5000
C
O
C SHT-06
SLEEVE C.O.S +6.14
D DSD
2.01
DSD
2.02
C
L L L M
EL. +6.10 700 4500 REFERENCE DRAWINGS
1500
H TOP H
NO. DRAWING TITLE DRAWING No. REVISION
150mm THK. PRECAST {125mm PIPE 1 SINGLE LINE DIAGRAM-OVERALL HV/MV SAAD2-SS-E-SLD-003 0
{90mm PIPE EL. +5.271 150mm THK. PRECAST
PARAPET WALL (TYP.) SLEEVE C.O.S +8.43 700x300mm WIDE 2 OVERALL ELECTRICAL EQUIPMENT LAYOUT SAAD2-SS-E-DLD-002 0
SLEEVE C.O.S +8.72 TOCA PARAPET WALL (TYP.)
SHT-06
OPENING IN PARAPET
E
SHT-05
B
GRAPHIC SCALE:
5585 3390 5585 4600 6000 6000 5262 838 520 2410 2330 3580 4610 7200 6400 5990 7240 7140
I 0 0.5 1 2 3 4 5 6 7 8 9 10m I
84680
SCALE : 1 : 100
20 19 17 16 15 14 13 12 11 10 9 7 6 5 4 3 2 1
REVISIONS
REVISION DATE PARTICULARS DESIGNED APPROVED
J J
OWNER
ENGINEER:
SgurrEnergy
DESIGN
INSTITUTE:
AL-JAZIRAH ENGINEERS & CONSULTANTS
WALL AND FLOOR OPENING - SUBSTATION BUILDING (SWITCHGEAR AND CONTROL ROOM)
DRAWING
TITLE:
L APPROVED BY: MAK DESIGNED BY: AJEC SHEET NO.: 04 of 06 PAPER SIZE: A0
L
841x1189 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
NOTES
A A
20 18 16 15 14 13 12 11 8 6 5 4 3 2 1
84680
7120 7440 4600 6000 6000 6100 520 5910 7020 7200 6400 5990 7240 7140
CANOPY
600
600
600
600
1250x1100 (BOO+5.70) 1.2M WIDE CANOPY
1100
1.2M WIDE CANOPY
1800 P1 RAD TO PACU-1A,1B 3000 P1 783 1800 P1 2646 600 P1 1500 817
783
500
500
2387 1250
500
500
500
SC SC SC
LOADING AND 2525 600 WALL OPENING WALL OPENING LOADING AND
3300
UNLOADING 600x500 (BOO+2.45) 600x500 (BOO+2.45) UNLOADING
2450
2450
PLATFORM 33kV SWGR. ROOM PLATFORM
HAND RAIL FOR PRD-1.01 FOR PRD-1.02 HAND RAIL
EL. +2.40
FFL
C EL. +2.40 C
FFL
800
800
(CLEAR HEIGHT)
800
800
L1 L1 L1
1950
L1
1950
1950
1950
1950
1950
1950
1950
1000 300 1000 300 300 1000 1000 300
3200
3200
3200
3200
3200
3200
3200
3200
2050 240 CABLE BASMENT EL.+0.00
EL.+0.00 SP SP 240 2310 2150 240 SP 240 1860
3000
SP 2474 1300 1300
2202 1500
(TOCR) 900 (TOCR)
240 1910 1254 300 SP
800
800
2850 900 SP 240 1810
S5 900 S6 240 1860 S5 SP 1150
300 1400 S5 SP
800
1300
1300
1300
240 S6 VARIES
150
S7
150
S5
S7 GS GS GS (TOC) GS S7 LEGEND
300 1300 300 1388 300 1400 1450 300 1500 300
1076 1364 300 542 1400 300 900 1500 300 1057 3000 1265 300 2480 300 BOB BOTTOM OF BEAM
300 3140 300 1800 3786 300
2.624m WIDE OPENING 3.0m WIDE OPENING
EL ELEVATION
2x{200mm PVC FOR 33kV POWER 6x{200mm PVC SLEEVES FOR 1.30m WIDE OPENING FOR 33kV 1x{200mm PVC SLEEVES
FOR 33kV POWER 2x{200mm PVC
CABLES FROM XFMR. OUTDOOR CONTROL CABLES POWER CABLES FROM XFMR. FOR GT POWER CABLES FFL FINISHED FLOOR LEVEL
5x{200mm PVC SLEEVES 2x{200mm PVC SLEEVES CABLES FROM XFMR. SLEEVES FOR
SLEEVES FOR
D FOR OUTDOOR CONTROL FOR GT POWER CABLES
GT POWER CABLES GT POWER CABLES 2x{200mm PVC SLEEVES 2x{200mm PVC SLEEVES 2x{200mm PVC SLEEVES TOC TOP OF CONCRETE D
CABLES FOR GT POWER CABLES FOR GT POWER CABLES FOR GT POWER CABLES
TOCR TOP OF CROWN LEVEL
TOP TOP OF PARAPET
TYP TYPICAL
A SECTION
WKL WALKWAY FINISHED LEVEL
1/2/3/4 SCALE 1:100
C.O.S CENTRE OF SLEEVES
SWGR. SWITCHGEAR
XFMR TRANSFORMER
FLOOR OPENING
E E
A B C D E F G J L
PARAPET
WALL
38040
F EL. +12.40 F
SCUPPER TOCA
DRAIN (TYP.) EL. +11.168
STAIR-1
PARAPET
WALL
TOP
EL. +9.525
SCUPPER
DOWN SPOUT DRAIN (TYP.)
(TYP.)
200
1200 550 1050
1500 {90mm PVC PIPE
600
600
600
1100
1600 200 FOR WATER SUPPLY
970 PL
500
1545 200
BOO+6.05, BOO+4.65,BOO+3.25
P1 SC P1 SC P1
1550 200
33kV SWGR. ROOM
500
500
CL CL
900
REFERENCE DRAWINGS
SC 850 200
H TOCA H
NO. DRAWING TITLE DRAWING No. REVISION
EL. +5.168 CL SC
500
1 SINGLE LINE DIAGRAM-OVERALL HV/MV SAAD2-SS-E-SLD-003 3
CL 260mm THK. INSULATED
260mm THK. INSULATED
PRECAST WALL (TYP.) 2 OVERALL ELECTRICAL EQUIPMENT LAYOUT SAAD2-SS-E-DLD-002 2
PRECAST WALL (TYP.) BATTERY ROOM 3 SUBSTATION BUILDING (SWITCHGEAR AND CONTROL ROOM) EQUIPMENT LAYOUT SAAD2-SS-E-DLD-003 1
TELECOM.ROOM
900
4 LAYOUT AND DETAILS OF DUCTBANKS , HANDHOLES, PULLPIT AND TRENCHES SAAD2-SS-C-DLD-018 0
D2 D1 D4
500
TOCA
EL. +3.068
850
FFL FFL GRAPHIC SCALE:
EL. +2.40 EL. +2.40 0 0.5 1 2 3 4 5 6 7 8 9 10m
800
800
SCALE : 1 : 100
STAIR-1
I I
GRAPHIC SCALE:
L1 L1
0 0.5 1 2 3 4 5m
(CLEAR HEIGHT)
3040
3040
SCALE : 1 : 50
SIDEWALK
3300
SIDEWALK
550 3000 REVISIONS
CABLE BASEMENT
3000
900
900
1200 2000 696 4000 700 500 3500 840 1652 400 1992
900
3500 753 650 2000 TOS
1300
200
200
GS TOS
500 TOS GS GS
EL. -1.30 500
EL. -1.30
J J
OWNER
ENGINEER:
SgurrEnergy
B SECTION
1/2/3/4 SCALE 1:50
DESIGN
INSTITUTE:
AL-JAZIRAH ENGINEERS & CONSULTANTS
WALL AND FLOOR OPENING - SUBSTATION BUILDING (SWITCHGEAR AND CONTROL ROOM)
DRAWING
TITLE:
L APPROVED BY: MAK DESIGNED BY: AJEC SHEET NO.: 05 of 06 PAPER SIZE: A0
L
841x1189 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
NOTES
A A
16 17 19 20
14560
700x300mm WIDE
OPENING IN PARAPET
PARAPET WALL (TYP)
FOR PACU CABLE ENTRY EL. +9.525 TOP
300
700 1045
B TT SLAB
2% SLOPE
B
600
600
600
1000
1650 P1 2682 400 1500 1950 400 2100
700 1045 P1 WALL OPENING P1 1008
550 1250 400 1100 1100x1000 400x400 BOO+2.45 (FFL)
500
400
400
TELECOM.ROOM CL
BOO+5.75
WALL OPENING
300
600
600
1200 1200
400x400 BOO+2.45 (FFL) 1250x1000 TOILET
700x300mm WIDE CONTROL ROOM
2500
BOO+5.75
2450
2450
OPENING IN PARAPET AUX. ROOM 1740
500
P1 P1
FOR PACU CABLE ENTRY
CL
EL. +2.40
650 200
FFL
800
800
800
800
800
C C
(CLEAR HEIGHT)
L1 L1 SC
800
CABLE BASMENT
1950
1950
1950
1950
1050
1050
S5 300 3500 S5 S5 CL
3200
3300
1200 300 1000 300 300 1000
EL.+0.00 SP 1200 300 SP EL.+0.00
3000
3360 1050x1050mm OPENING
(TOCR) (TOCR)
670 1050 FOR EF. FROM BASEMENT 2400 2562
900
900
1050 300 900 SP 240 400 1140 240 3000 SP 1050 1024 400650
2400 700 900 2080 400
300 900 2060 240
2600
S5 GS S5 VARIES (TOC) 240 2550
GS GS
LEGEND
1050x1050mm OPENING
2x{200mm PVC SLEEVES 9x{200mm PVC SLEEVES FOR EF. FROM BASEMENT
2x{200mm PVC SLEEVES 1050x1050mm OPENING
FOR SVG POWER CABLES FOR SVG CONTROL CABLES 7x{200mm PVC SLEEVES BOB BOTTOM OF BEAM
2x{200mm PVC SLEEVES FOR EF. FROM BASEMENT
FOR SVG POWER CABLES
MV-DB-SG-01 LV-DB-23 FOR SVG POWER CABLES
FOR SVG POWER CABLES EL ELEVATION
MV-DB-SG-09 MV-DB-SG-03
MV-DB-SG-02
FFL FINISHED FLOOR LEVEL
775
800
800
D L1 D
TOC TOP OF CONCRETE
1050
1.5Mtr. WIDE S5 1000 300 S5 1.5Mtr. WIDE
SCALE 1:100 1000 300 TOP TOP OF PARAPET
SHT-01
3200
SIDEWALK SIDEWALK
TYP TYPICAL
2400
TOA WKL WALKWAY FINISHED LEVEL
4x{200mm PVC SLEEVES TOA
EL.+0.00
FOR CONTROL CABLES FLOOR OPENING
1100
EL.+0.00
900
900
1050 675 LV-DB-17 PVC SLEEVE OPENING IN WALL
2120 400 1200 300 424 424 424 1284
900
2x{200mm PVC SLEEVES
1000 300 PVC SLEEVE OPENING IN FLOOR
10 11 13 14 15 16 900 GS FOR POWER CABLES S5
S5 GS
MV-DB-SG-04
2410 6620 6000 6000 4600
E E
FFL
EL. +2.40 D SECTION
SHT-01 SCALE 1:50
CABLE BASEMENT
(CLEAR HEIGHT)
3300
2080 1500 TORW EL. +0.30
3000
F F
1500mm WIDE OPENING FOR 3x{200mm PVC SLEEVES 7x{200mm PVC SLEEVES
SST CONTROL CABLES FOR SST POWER CABLES FOR SVG POWER CABLES
G F
G
SECTION
SHT-03 SCALE 1:50
L K H F E D C B A
38040
150mm THK.
2% SLOPE 2% SLOPE
PARAPET WALL
SCUPPER
DRAIN (TYP.)
GRAPHIC SCALE:
0 0.5 1 2 3 4 5 6 7 8 9 10m
SCALE : 1 : 100
I TOP
I
600
600
600
1200 1200 200 1600 1500 260mm THK. INSULATED GRAPHIC SCALE:
EL. +6.40
1100
PRECAST WALL (TYP.) 0 0.5 1 2 3 4 5m
P1 P1
P1 SC
SCALE : 1 : 50
500
CL OPENING FOR
HVAC DUCT REVISIONS
1850x1100mm 1850 1265
REVISION DATE PARTICULARS DESIGNED APPROVED
B.O.O 5.70
260mm THK. INSULATED 0 14.01.2024 ISSUED FOR APPROVAL AJEC MAK
PRECAST WALL (TYP.)
3300
D2
J J
FFL FFL
EL. +2.40 EL. +2.40 SAAD TWO RENEWABLE
COMPANY
OWNER :
800
800
L1 L1 L1
(CLEAR HEIGHT)
1.5Mtr. WIDE 300 900 300 1350 300 900 1.5Mtr. WIDE OWNER
SIDEWALK SgurrEnergy
3300
SIDEWALK ENGINEER:
3000 550
CABLE BASEMENT
3000
900
K 5000 860 750 2000 500 4000 455 SEPCOIII ELECTRIC POWER K
450 3500 700 700 3500 CONTRACTOR:
900
DESIGN
INSTITUTE:
AL-JAZIRAH ENGINEERS & CONSULTANTS
L E SECTION L
APPROVED BY: MAK DESIGNED BY: AJEC SHEET NO.: 06 of 06 PAPER SIZE: A0
SHT-01 SCALE 1:50
841x1189 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24