0% found this document useful (0 votes)
21 views1 page

RCB - Eng.00191 C La 7001 01

The document outlines construction and earthworks specifications, including valve settings, benchmarks, and watermain reticulation details. It emphasizes compliance with relevant standards and notes the importance of inspecting the site before commencing work. Additionally, it includes guidelines for materials and workmanship, as well as requirements for variations and approvals during construction.

Uploaded by

Dave C
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views1 page

RCB - Eng.00191 C La 7001 01

The document outlines construction and earthworks specifications, including valve settings, benchmarks, and watermain reticulation details. It emphasizes compliance with relevant standards and notes the importance of inspecting the site before commencing work. Additionally, it includes guidelines for materials and workmanship, as well as requirements for variations and approvals during construction.

Uploaded by

Dave C
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

1 2 3 4 5 6 7 8

SILVACEL
CTC

L
FOSKOR

RIA
RTE
VALVE SETTING OUT TABLE BENCHMARKS COORDINATES LEGEND NOTES: EARTHWORKS GENERAL NOTES:- NOTES : WATERMAIN RETICULATION

LA
AY
W

TRA
RK
PA
SS

EN
HN
RO

JOH ID Y X Z DESCRIPTION

NC
JO

1. THE CONTRACTOR WILL BE DEEMED TO HAVE INSPECTED THE SITE 1. ALL CONSTRUCTION TO COMPLY WITH RELEVANT CLAUSES OF FOLLOWING SECTIONS OF

ER
POLA

THULAZIHLEKA PAN VALVE Y (m) X (m) 1. ANY DISCREPANCIES IN LEVELS AND SETTING OUT DATA TO BE

ST
RIS

N RBH8 -101059.188 3190452.480 9.120 PILLAR PROPOSED EXISTING DESCRIPTION

WE
RO AND BE IN AGREEMENT WITH THE WORKS REQUIRED AS PER THE TENDER SANS 1200. - LB : BEDDING FOR PIPES - DB : EARTHWORKS (TRENCHES) - L : MEDIUM
SS IV101 -10463647.85 329606.31 QUERIED WITH THE ENGINEER PRIOR TO COMMENCEMENT OF
STOP-B -99567.134 3188114.020 6.040 STUD PRESSURE PIPELINES - LD : SEWERS - LE : STORMWATER DRAINAGE - GA : CONCRETE

MEDWAY ROAD
HIG ANY WORK. DOCUMENTS, UNLESS ALTERNATIVE PROPOSALS WITH COST IMPLICATIONS
HW IV102 -10463994.76 329763.26 GUDRAIL - C -99583.160 3188121.660 6.099 STUD STORMWATER MANHOLE/ PIPE ARE RECEIVED TOGETHER WITH THE TENDER DOCUMENTS. ALTERNATIVE (SMALL WORKS)
600mmØ STORMWATER
PIPE
OPEN CHANNEL

A Y (R 2. ALL WORKMANSHIP TO BE IN ACCORDANCE WITH

PIPE
600mmØ STORMWATER PIPE

STORMWATER
2. HDPE PIPES SHALL BE WATER PRESSURE PIPES, TYPE 4 , CLASS 12.5 TO SABS 533-2. PIPES
NEWARK ROAD

EARTH DRAIN
600mmØ

EARTH DRAIN
HARBOUR BOUNDARY

OPEN CHANNEL EAST GATE

34) BRIDGE B -100914.096 3190106.197 12.753 10mm STUD ON CONCRETE STORMWATER CATCHPIT/ PIPE SANS 1200 PART D : EARTHWORKS AND THE RELEVANT PROPOSALS SUBMITTED DURING CONSTRUCTION SHALL BE ON A DESIGN AND

PIPE

PIPE
STORMWATER

STORMWATER

PIPE
STORMWATER
600mmØ

600mmØ
IV103 -10464024.66 329776.78

600mmØ
SHALL BE FLANGED OR BUTT-WELDED. BACKING RINGS ON FLANGED PIPES SHALL BE
STORMWATER PIPE

BAYVUE GATE
A04 ROTARY TIPPLER
SILV

CONSTRUCT BASIS, WITH THE DESIGN AT CONTRACTOR'S EXPENSE.


A03 ROTARY TIPPLER
ER OCE A02

AN
NEPTUNE LM1A

BRIDGE C -100913.001 3190107.203 12.731 10mm HOLE IN CONCRETE PROJECT SPECIFICATIONS AS INCLUDED IN THE CONTRACT.
SUBSTATION
PRE-TIPPLER YARD NEWARK ROAD

450mmØ STORMWATER PIPE


450mmØ STORMWATER PIPE
TENEDOS ROAD

FERRO SLAB

AV101 -10464606.47 330087.23 SEWER MANHOLE/ PIPE GALVANISED MILD STEEL..

CHELDANE
NEWARK ROAD SAFCOL SITE

3. BEFORE PLACING ANY FILL MATERIAL, THE EXISTING GROUND

CON
COLOMBO ROAD

VEY
PEGASUS ROAD

OR
M-CONT1 -101113.372 3190497.006 5.490 16mm HOLE IN CONCRETE

M
HO
BILLITON
3. uPVC PIPES SHALL BE WATER PRESSURE PIPES,CLASS 16 TO SAN S966 PART 1. (WAVISAFE "
CONVEYOR
NORTHMOOR

AD
RO
2. VARIATIONS DEEMED NECESSARY BY THE CONTRACTOR SHALL BE FORWARDED TO THE PROJECT MANAGER IN

NT
-100 300 Y

O
S.R.M.T.

ROAD
TING
SA
OPEN STOCKPILE AREA A (EAST)

PE
BAYSIDE SMELTER
SURFACE MUST BE CLEARED AND GRUBBED OF ALL VEGETATION
LEASE SITES OPEN STOCKPILE AREA A G-BLOCK PAVERS
(EXISTING)

NORMAN ROAD
FIRE HYDRANT/ WATER PIPE
MH

SV101 -10464884.47 330238.53


OPEN STOCKPILE AREA B OPEN STOCKPILE AREA B (EAST)

5.660
G-BLOCK PAVERS
REAR LEADING LIGHT

M-CONT2 -101075.621 3190443.386 16mm IRON PEG IN CONCRETE


(EXISTING)

Z-LOK")

OCTOPUS ROAD
OPEN STOCKPILE AREA B1 (EAST)
G-BLOCK PAVERS

WRITING FOR APPROVAL BEFORE ANY CONSTRUCTION BASED ON THE VARIATION COMMENCES.
OPEN STOCKPILE CHROME AREA C WEST

GORDON ROAD

CONVEYOR

WAYFARER ROAD
(PROPOSED NEW WORKS) 11431

AND ORGANIC MATTER.


OPEN STOCKPILE
G-BLOCK PAVERS
OPEN STOCKPILE CHROME AREA D WEST
(PROPOSED NEW WORKS)11431

SAXON ROAD
MULTI PURPOSE

CONVEYOR
OPEN CHANNEL

X = + 3 186 000 SLOTTED PIPE SLOTTED PIPE


OPEN STOCKPILE
AREA D (EAST)
G-BLOCK PAVERS
TERMINAL
4. STEEL PIPES AND FITTINGS SHALL BE HOT-DIP GALVANISED, MEDIUM DUTY STEEL TO

8
GENERAL PURPOSE SHED 2

CABLE DUCTS

70
VENTURA ROAD
SLOTTED PIPE SLOTTED PIPE

LM2A

AV102 -10465171.94 330395.27 BENCHMARKS TO BE VERIFIED ON SITE PRIOR TO ANY CONSTRUCTION TAKING
LB 23

DRY BULK TERMINAL


GENERAL PURPOSE SHED 1

NORMAN ROAD
SLOTTED PIPE
GENERAL PURPOSE SHED 4
SLOTTED PIPE
GUNDA ROAD
4. TOPSOIL 200mm MUST BE STRIPPED AND STOCKPILED.

7
STORAGE BINS

70
SANS 62 OR 719. PIPES AND FITTINGS SHALL BE FLANGED, UNLESS OTHERWISE INDICATED.
STORAGE SILOS LB 21

3. SERVICES SHOWN ON DRAWING ARE KNOWN OR SOURCED FROM EXISTING DRAWINGS.


SLOTTED PIPE GENERAL PURPOSE SHED 3 SLOTTED PIPE

TIM

BRIDGE
-14,7 m
5. WHERE THE MATERIAL GROUND LINE IS STEEPER THAN
AV PENGUIN ROAD

SECTION 2
O RO

PLACE
SLOTTED PIPE SLOTTED PIPE
AD

ELECTRICAL DUCTS
SHED
DUMRA ROAD

-10465503.83 330575.88
OPEN CHANNEL

SV102

TOWN ROA
MINERVA ROAD

70
MINERVA ROAD

THE CONTRACTOR MUST ENSURE THAT ALL SERVICES THAT INTERSECT OR RUN ALONGSIDE THE 5. COPPER PIPES FOR WATER SUPPLY TO FIRE HOSE REELS SHALL BE TO SANS 460 CLASS 2.

Ø1050
ACTIVE ROAD

PROPNET
60 LB 19
1:6, BENCHING MUST BE EXCAVATED INTO EXISTING SURFACE

AD
6 704

D
701 702 703 705

RO
CAPPILARY SOLDERED FITTINGS SHALL BE USED.
LB 30
BULK CARGO QUAYS

WATERMAIN PROPOSED WORKS ARE LOCATED BEFORE CONSTRUCTION COMMENCES. ANY CLASHES SHALL

A
AV103 -10466218.19 330965.12

OZ
60

PRIOR TO RECEIVING FILL.

ND
7
R ROAD

ME
9
SWAMP PIONEE

60
LB 28

BE REPORTED TO THE PROJECT MANAGER IN WRITING. THE CONTRACTOR SHALL BE HELD LIABLE 6. ALL FLANGES SHALL BE GALVANISED TO SANS 763.
A A
60

STEEL PALISADE FENCE


8

LB 26
LB 17

SV103 -10466738.29 331214.95 6. UNLESS OTHERWISE INDICATED,


-14,5 m -19,0 m
TUG
LB S7

ALL BANK BATTERS TO BE : 1:1.5 CUT AND 1:2 FILL FOR ANY DAMAGES TO EXISTING SERVICES DUE TO NEGLIGENCE. 7. ALL FLANGES SHALL BE STEEL FLANGES TO SANS 1123 TABLE 10, TYPE 3.
CONCRETE RETAINING STRUCTURE

DREDGE
LB 24 LB 15
RE
PA
IR
-7,0 m
AV104 -10467062.48 331392.10 7. THE UNCOMPACTED THICKNESS OF FILL LAYERS SHALL 8. GATE VALVES SHALL BE SUITABLE FOR USE IN WATERWORKS TO SANS 664. GATE VALVES

R
BE
RT LB S5
H
PELICAN ISLAND
-8,0 m
TUZI-GAZI
NOT EXCEED 300mm 4. ALL EXISTING PIPES AND MANHOLES INCORPORATED INTO THE NEW SYSTEM SHALL HAVE SHALL BE CAST-IRON, DOUBLE SOCKETED NON-RISING SPINDLE CLASS 16 . GATE VALVES
LB 13
LB S3
45 BEND 1 -100884.58 3190115.17 CONCRETE PAVING BELOW GROUND SHALL BE FITTED WITH CAPS AND ALL WITH NON- RISING SPINDLES. THE
DEFECTS RECTIFIED TO COMPLY TO STANDARDS FOR NEW WORKS.
LB S2
LB 22 (OLD 22A) LB S1

8. LOCATE ALL EXISTING SERVICES PRIOR TO ANY CONSTRUCTION


LB 20
LB 11
NAVAL ISLAND D8
45 BEND 2 -100880.83 3190127.44 EARTH BANKS TAKING PLACE. GATE VALVES SHALL BE CLASS 16 TO SANS SPECIFICATIONS.
LB 18
D6
RECLAIM
D3

RA
ND 5. DIMENSIONS SHOWN ON DRAWINGS SHALL TAKE PREFERENCE OVER DIMENSIONS SCALED. 9. FIRE HYDRANTS SHALL BE THE UPWARD OBLIQUE LANDIND VALE TYPE TO SANS 0400 TT35
LB 10
LB 9

LB 7
BERTHS
AL
KA
NT
ST
ELECTRICAL MANHOLE/PIPE AND SAN 1128: PART 1 AND PART 2. FIRE HOSE SHALL HAVE LENGTH OF 30m. THE MINIMUM
LB 16
D4

LB 12
NEWARK BEACH
6. ALL LEVELS AND DIMENSIONS SHALL BE CHECKED BEFORE ANY WORK COMMENCES. OPERATING PRESSURE SHALL BE 300kPa AND THE FLOW RATE 20 LITRE/SECOND.
PORT OF RICHARDS BAY LB 8
LB 5
COMMUNICATION MANHOLE/PIPE 10. FIRE HOSE REELS SHALL BE TO SANS 0400 TT34 AND SANS 543. THE MINIMUM OPERATING
CB 1
LB 14
ELEVATED
D2
D1
FAILURE TO DO SO SHALL DEEM THE CONTRACTOR LIABLE FOR ANY WORK REQUIRED TO
X = + 3 188 000
20
9 FOOTPATH
4043 LB 6
LB 3
NORT
H HE
ADLA
ND
RECTIFY ERRORS AS A RESULT OF THE FAILURE TO CHECK THE LEVELS AND DIMENSIONS. PRESSURE SHALL BE 300kPa AND THE FLOW RATE 0.5 LITRE/SECOND. THE LENGTH OF
RADAR TOWER

NA
TU
VISITORS
CENTRE LB 4 LB 1
HOSES SHALL BE 30m MINIMUM.
RA

1
CB 3
L
7. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS, UNLESS OTHERWISE INDICATED 11. WATER METERS SHALL BE SUITABLE FOR POTABLE WATER AND TO UMHLATHUZE

30
GROYNE
HE
RI WRECK BUOY
TA
DO GE
RO
TH
EA
RO
AD
EN
SI
TE MUNICIPALITY STANDARDS.
GE LB 2

30 S
CB 5
N 8. THE LATEST REVISION OF SANS SPECIFICATIONS SHALL APPLY. 12. THE TWIN PUMPING CONNECTION (BOOSTER CONNECTION) SHALL BE FITTED WITH A

AY
2
-19,0 m SOUT

AL
H HE

QU
ADLA
ND

PRESSURE GAUGE READING UP TO 2500kPa.

IN
ALL WORK SHALL BE DONE IN ACCORDANCE WITH RELEVANT SANS SPECIFICATIONS,

3 AL

RM
SWAMP

3 0 CO
13. THE POSITION OF FIRE-FIGHTING EQUIPMENT SHALL BE INDICATED BY SYMBOLIC SIGNS IN
MU

TE
UNLESS OTHERWISE INDICATED.
ND
CB 7 RA
RO
BE

AD
RM

LK

X
10
-10
049 -10

901
RO

0Y 109

AL
0Y

+31
ACCORDANCE WITH SABS 1186. (SEE MECHANICAL DWG)
AD

X
BU

10
-10
059 -10

903
0Y 119
0Y

+31
X
CO

X
10

10
-10

894
SANCTUARY AREA
069

905
0Y

+31

+31
SOUTH BREAKWATER

X
10
-10

896
14. CONCRETE SHALL BE 30MPa AT 28 DAYS.
079
0Y

+31
9. ALL LENGTHS SHOWN ARE APPROXIMATE AND SHALL BE CONFIRMED ON SITE BY CONTRACTOR.

X
10
Y
-10

898
CB 9 089
0Y

+31
4

BA

X
10
30 -10

900
099
0Y

+31
15. GALVANISING SHALL BE TO SANS 763.

X
10
-10
049 -10

902
0Y 109
0Y EXISTING RAILWAY LINE
C15

+31
E

X
SECTION 1

DS

10

10
-10

893
059

904
0Y

AG

+31
EXISTING RAILWAY LINE

+31
LINE
EXISTING RAILWAY

X
CONTROL POINT

10
EXISTING RAILWAY -10

895
EXISTING HML EXISTING HML EXISTING HML

D
EXISTING ROBOT EXISTING HML LINE 069
0Y

AR

+31
EXISTING HML EX SIGN POST

16. BACKFILL MATERIAL AND COMPACTION IN AREAS SUBJECT TO TRAFFIC INCLUDING ALL PIPE

A
RO
EX SIGN POST

X
OR
EXISTING HML EXISTING RAILWAY LINE EXISTING RAILWAY LINE EXISTING RAILWAY LINE

10
EX SIGN POST
5

EX SIGN POST -10 EXISTING RAILWAY LINE EXISTING RAILWAY LINE EXISTING RAILWAY LINE

897
079
CONTROL POINT

INE
EXISTING HML 0Y EXISTING HML

+31
EX SIGN POST
30

EXISTING HML EXISTING HML EXISTING HML EXISTING ROBOTEX ELEC BOX EXISTING HML EXISTING HML EXISTING HML EX ELEC BOX EXISTING ROBOT EXISTING HML

X
EXISTING HML EXISTING HML EXISTING HML EXISTING HML EXISTING HML EXISTING HML EXISTING HML EXISTING HML EXISTING HML

CH
EX ELEC BOX EXISTING HML EXISTING HML EXISTING HML EXISTING HML

DU
EX ELEC BOX CONTROL POINT

10
EXISTING HML -10 EX MARKER

899
EX ELP 089 EX SIGN POST EX CHANNEL

ST
0Y EX MARKER
EX SIGN POST

+31
M M

EX ELP
CONTROL POINT

X
10
CROSSING OF ROADS AND PARKING AREAS SHALL BE TO SANS 1200DB CLAUSE 3.5b AND
-10

901
099

RI
EX ELECTRIAL MH
EX MARKER 0Y EX SIGN POST

+31
M
EX MARKER EX MARKER EX ELECTRIAL MH
M M EX MARKER M EX MARKERM M

X
EX MARKER M EX MARKER EX MARKER M
M
EX MARKER M EX MARKER M EX MARKER

10
-10
049 EX MARKER EX ELP M EX MARKER EX MARKER EX MARKER EX ELP EX ELECTRIAL MH EX ELP EX MARKER M EX MARKER M EX MARKER EX ELECTRIAL MH -10
M EX ELP M

903
M
0Y EX MARKER EX ELP EX ELP EX MARKER 109
EX ELP

EW
EX ELP 0Y

+31
M
EX ELECTRIAL MH EX ELP M
CONTROL POINT

X
BE

X
10

10
-10

894
059 EX ELP

905
RM

EX ELECTRIAL MH 0Y

+31

+31
5.7.2

X
VI
R

10
-10

896
OA

069 EX ELP
0Y

+31
SHEET 1 OF 3
D

SHEET 2 OF 3

X
10
SHEET 3 OF 3
-10

898
079
0Y

+31

X
10
ND
-10

900
089

17. ALL BOLTS, NUTS AND WASHERS FOR FLANGED CONNECTIONS SHALL BE TO SANS 136 AND
0Y

+31

X
10
-10
039 -10

902
0Y 099
0Y

LA

+31
X

X
10

10
-10

893
049 -10

904
0Y 109

+31
0Y

+31
X
IS

X
10
SHALL BE GRADE 316 STAINLESS STEEL.

10
895
0Y

906
+31
059

+31
-10

X = + 3 190 000

18. THE TEST PRESSURE FOR PRESSURE PIPES SHALL BE 16 BAR.


LM7 -10
LM3 05
90 19. WATER RETICULATION FOR FIRE FIGHTING PURPOSES SHALL BE TO SANS 0400, TT33.
LM8
LM5
Y
D
OA

RD
YA
KR

G
WIC

IN

X
AL

LM6 LM4
RD

H
RS
HA

MA

10
K
UC

-10
TR
AIL

94
06
R
.T.
.C

90
R.B

18
Y

+3
I ND I A N O C E A N

B B

X
10
TO SOUTH DUNES
SWAMP

TO RBCT

6
89
1
+3
LOCALITY PLAN
Y = - 105 000
Y = - 103 000

Y = - 107 000
NTS

SETTING OUT TABLE CH 0 - CH 480 TIE INTO EXISTING Ø200mm PIPE


-10
04 POSITION TO BE CONFIRMED ON
Y (m) X (m) 90
CHAINAGE Y TIE-IN TO EXISTING 450 AC.
SITE PRIOR CONSTRUCTION
SEE DETAIL DRAWING

EXISTING LEVEL CROSSING


0 3189315.31 -100461.94 RCB.ENG.00191-C-DE-7001-01
0X

-10
1

TIE-IN POINT TO BE CONFIRMED ON SITE


93

05
20 3189333.53 -100470.19 9 0Y
18

EXISTING RAILWAY LINE


+3

40 3189351.75 -100478.43

X
10
EXISTING RAILW -10
EXISTING HML

5
60 3189369.98 -100486.67 EXISTING HML AY LINE 06

89
90
Y

1
+3
80 3189388.20 -100494.92 EX SIGN POST

X
EXISTING HML EXISTING RAILWAY LINE EXISTING RAILWAY LINE

0
EX SIGN POST

71
100 3189406.42 -100503.16

9
T JUNCTION - SEE WATER DETAIL EXISTING HML

18
+3
120 3189424.64 -100511.41 LOCATION TO BE CONFIRMED ON SITE EXISTING HML EXISTING HML EXISTING HML EXISTING HML EXISTING HML EXISTING ROBOT EXISTING HML
EX ELEC BOX EX ELEC BOX
140 3189442.86 -100519.65 EX ELP
20

NEW Ø560 mm HDPE


PIPE
40

160 3189460.92 -100528.24 EX ELP


60

LEVEL CROSSING TIE IN


80
180 3189478.48 -100537.80

100
C NEW Ø560 mm HDPE PIPE C
ISOLATING VALVE-101

140
200 3189496.04 -100547.37 EX MARKER

160

180

220
200

240

260

280

300

320

340

360

380

400

420

440

460

480
SEE DETAIL DRAWING M M EX MARKER EX MARKER M

120
EX MARKER

154
M
EX MARKER

204
M
220 3189513.61 -100556.93 RCB.ENG.00191-C-DE-7005-01 -10
04
90 M EX MARKER EX ELP EX MARKER
Y EX ELP
240 3189531.17 -100566.50
ISOLATING VALVE-103 HORIZONTAL BEND 4.233° EX ELECTRIAL MH EX ELP
M
VERTICAL BEND 0.364°
260 3189548.73 -100576.07 0X SEE DETAIL DRAWING -10 SCOUR VALVE 101
41
RCB.ENG.00191-C-DE-7005-01 05 AIR VALVE-101
9

EX ELECTRIAL MH 90 SEE DETAIL DRAWING:


18

280 3189566.30 -100585.63 Y SEE DETAIL DRAWING:


+3

RCB.ENG.00191-C-DE-7002-01 RCB.ENG.00191-C-DE-7003-01

0X
300 3189583.86 -100595.20 ISOLATING VALVE-102

1
96
SEE DETAIL DRAWING

FOR CONTINUATION SEE SHEET 2 OF 3


18
320 3189601.43 -100604.77 RCB.ENG.00191-C-DE-7005-01

+3
340 3189618.99 -100614.33
BEGINNING OF SCOPE

360 3189636.55 -100623.90

380 3189654.12 -100633.46

400 3189671.68 -100643.03

420 3189689.24 -100652.60

440 3189706.81 -100662.16


LAYOUT PLAN
SCALE 1:500
460 3189724.37 -100671.73

480 3189741.94 -100681.30

D 8
D

7
NGL
6 NGL
NGL
LEGEND: Ø560mm x Ø200mm Tee
5
NATURAL GROUND LEVEL
4
PROPOSED PIPELINE ROUTE
3
NEW Ø560mm HDPE PIPE NEW Ø560mm HDPE PIPE
PIPE
SCOUR VALVE NEW Ø560mm HDPE PIPE NEW Ø560mm HDPE

AIR VALVE 101


ISOLATION VALVE 101

ISOLATION VALVE 103


ISOLATION VALVE 102

SCOUR VALVE 101


AIR VALVE
1

ISOLATING VALVE
0

-1

Datum -2
100.000

120.000

126.021

131.055
131.057

140.000

154.805

160.000

180.000

200.000

204.381

220.000

240.000

260.000

280.000

300.000

320.000

332.123

340.000

360.000

380.000

400.000

420.000

428.588

440.000

460.000

475.000
14.980
14.982
20.000

40.000

60.000

80.000
0.000

Chainage
2.538

2.505
2.505
2.494

2.450

2.407

2.363

2.319

2.275

2.262
2.262

2.251
2.251

2.232

2.199

2.188

2.144

2.101

2.091

2.156

2.239

2.323

2.406

2.489

2.573

2.623

2.557

2.387

2.218

2.049

1.880

1.808

1.953

2.209

2.401
Invert Level
E E
2.018

2.053
2.053
2.077

2.300

2.291

2.366

2.344

2.537

2.060

2.172
2.172

2.063

2.070

2.121

2.461

2.015

2.018

2.312

1.998

2.310

2.348

2.264

2.079

2.018

2.057

2.088

1.767

2.202

1.912

2.018

2.077

2.181

2.018
Pipe Depth

Horizontal Angle 4.233°

Vertical Angle 0.364° 0.723° 1.216°

14.980 m 0.002 m 111.039 m 5.034 m 0.002 m 23.749 m 49.576 m 127.744 m 96.468 m 46.416 m
Pipe Length/ Pipe Slope 0.219% 0.146% 0.219% 0.219% 0.146% 0.219% 0.219% 0.417% 0.845% 1.277%

560 560
Pipe Type/ Pipe Size HDPE PE 100 Class PN 12.5 HDPE PE 100 Class PN 12.5

LONGITUDINAL SECTION SV- 00 TO SV- 475


HORIZONTAL SCALE 1: 500
VERTICAL SCALE 1:50

NOTES
CONTRACTOR / CONSULTANT TRANSNET NATIONAL PORTS AUTHORITY Transnet National Ports Authority
1. DO NOT SCALE DRAWING - ONLY DIMENSIONS SHOWN TO BE USED. TITLE NAME SIGN DATE TITLE NAME SIGN DATE
TRANSNET SOC Ltd : REG No. 1990/000900/30
F 2. THE CONTRACTOR SHALL VERIFY ALL CONDITIONS, DIMENSIONS DRAWN . . . . DRAWN AM 27 09 24 (PORT PHYSICAL ADDRESS) F
AND LEVELS ON THE SITE AND NOTIFY THE NEC SUPERVISOR OF
CHECKED . . . . CHECKED SN 27 09 24 (CITY/TOWN) TEL: 000 000 0000
ANY VARIATIONS BEFORE CONSTRUCTION.
3. ALL LEVELS ARE IN METERS TO MEAN SEA LEVEL DESIGNED . . . . DESIGNED AM 27 09 24 (POSTAL ADDRESS)
PROJECT / AREA / ASSET / SUBJECT/DRAWING TITLE
CHECKED . . . . CHECKED SN 27 09 24

PR.ENG. / PR.TECH./PR. ARCH PR.ENG. / PR.TECH./PR. ARCH PORT OF RICHARDS BAY


NAME DATE NAME: SEKELA NDLAMLA DATE UPGRADE WATER RETICULATION AS PER WATER
RCB.ENG.00191-C-DE-7005-01 ISOLATING VALVE ASSEMBLY PIPEWORK AND CHAMBER DETAIL SIGNATURE . . . SIGNATURE 27 09 24
MASTER PLAN: PHASE 1
RCB.ENG.00191-C-DE-7003-01 SCOUR VALVE ASSEMBLY PIPEWORK AND CHAMBER DETAIL SHEET 1 OF 3
REG. NUMBER REG. NUMBER: 2020300860
RCB.ENG.00191-C-DE-7002-01 AIR VALVE ASSEMBLY PIPEWORK AND CHAMBER DETAIL 0A ISSUED FOR TENDER AM SN SN 27.09.24 LAYOUT AND LONGITUDINAL SECTION
TITLE TITLE
RCB.ENG.00191-C-DE-7001-01 OFF-TAKE AND TIE-IN DETAIL NO. DESCRIPTION BY CHKD APPD DATE FROM CHAINAGE 0m TO CHAINAGE 475m
DRAWING NO. DRAWING DESCRIPTION
SCALE : PAPER SIZE : A0
REVISIONS TRANSNET DRG. NO. REV. PROJECT DRG. NO. REV.

REFERENCE DRAWINGS 00 RCB.ENG.00191-C-LA-7001-01 00


1 2 3 4 5 6 7 8

You might also like