The document outlines the specifications for a proposed inlet and outlet cut and cover structure, detailing hydraulic elements, dimensions, and elevations. It includes general notes on construction materials, reinforcing steel requirements, and manhole placements every 20 meters. Various sections and profiles are provided to illustrate the design and construction details at specified scales.

Uploaded by

Tadel Yunting
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
29 views1 page

3.tunnel Cut and Cover Plan

The document outlines the specifications for a proposed inlet and outlet cut and cover structure, detailing hydraulic elements, dimensions, and elevations. It includes general notes on construction materials, reinforcing steel requirements, and manhole placements every 20 meters. Various sections and profiles are provided to illustrate the design and construction details at specified scales.

Uploaded by

Tadel Yunting
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

PROP.

INLET CUT & COVER


HYDRAULIC ELEMENTS
Manhole in every 20 meters o.c. C A N A L
ELEM. UNIT
ABOVE BELOW

STA. 0 + 665.60

M A T C H L I N E
Q cu.m/s 0.1081 S
C C

B
V m/s 0.5408 A
A sq.m 0.224 M
700 b m. 0.70 E
d m. 0.321 A
D m. 0.60 S

B
t m. 0.60 A

M A T C H L I N E
r m. 0.1672 B

PROP. OUTLET CUT & COVER


S 0.0007 O
Ss vert. V.
Manhole in every 20 meters o.c.
n 0.015 E

STA. 0 + 665.60
P L A N
SCALE 1:100

Manhole in every 20 meters o.c.

ELEV. = (55.47) NEW ELEV. = 54.81


GENERAL NOTES:
GROUND · ALL DIMENSIONS ARE IN MILLIMETERS UNLESS
NATURAL
PROP. INLET CUT & COVER

(ELEV. = 53.23) NEW ELEV. = 52.57 OTHERWISE SPECIFIED.


· ALL CONCRETE SHALL BE 3000 PSI UNLESS

M A T C H L I N E
OTHERWISE SPECIFIED.
STA. 0 + 665.60

· CLEARANCE OF REINFORCING STEEL TO THE


NEAREST SURFACE OF CONCRETE SHALL BE 5
cm FOR FOUNDATIONS AND WARPED SURFACES,
REVISED ELEV.
TB ELEV. = 49.12 (TB ELEV. = 49.78) 7 cm FOR CONCRETE EXPOSED TO WATER, AND 4
WS ELEV. = 48.76 (WS ELEV. = 49.50) cm FOR OTHERS.
CB ELEV. = 48.52 (CB ELEV. = 49.18) ELEV. ELEV.
= (48.69) NEW ELEV. 48.03 = (48.67) NEW ELEV. 48.01 · LAPPING OF BARS SHALL BE 24d FOR DEFORMED
BARS AND 48d FOR PLAIN BARS; SPLICE SHALL
BE STAGGERED.
· ALL EXPOSED EDGES SHALL BE ROUNDED OR
CHAMFERED.
Manhole in every 20 meters o.c. · ALL BARS NOT OTHERWISE SPECIFIED SHALL BE
10 mm Ø SPACED @ 30 cm O.C. - B.W. OR 12 mm Ø
SPACED @ 45 cm O.C - B.W.
M A T C H L I N E

(ELEV. = 55.28) NEW ELEV. = 54.61


· ALL ELEVATIONS ARE IN METERS.
· ALL REINFORCING BAR SHALL BE DEFORMED (
COMFORMING TO ASTM A - 615 AND SHALL BE

PROP. OUTLET CUT & COVER


GRADE 40 ( Fy = 275 MPa) FOR 20 MM Ø BARS &
BELOW 25 MM Ø AND ABOVE, GRADE 60 (Fy = 414
NAT MPa) SHALL BE USED.

STA. 0 + 665.60
URA
LG
ROU
N D

(ELEV. = 50.33) NEW ELEV. = 49.65 150 1000 150


REVISED ELEV.
(TB ELEV. = 49.69) TB ELEV. = 49.03
(WS ELEV. = 49.41) WS ELEV. = 48.67
ELEV. ELEV. (CB ELEV. = 44.09) CB ELEV. = 48.43
= (48.65) NEW ELEV. 47.98 = (48.63) NEW ELEV. 47.97

SECTION A-A 150

SCALE 1:100

150 1000 150

12mm Ø RSB
LIFTING BAR
150 WS=700 150 600 700
CONSIDER 500mm from
N.G.L. ALL THROUGH
OUT
WS/4 WS/4
12mm Ø RSB
12mm Ø RSB
SP. @ 23 CM O.C. SP. @ 30 cm B.W.

150

VARIES REFER TO CUT AND


16mm Ø STEEL RUNG 150
HW/4
FILLET
10 cm x 10 cm
COVER PROFILE SP. @ 30 cm

12mm Ø RSB
15 X 15 FILLET 900
BARS 900
SP. @ 30 CM HW=600
O.C.
12mm Ø RSB
10mm Ø RSB
SP. @ 30 CM O.C. LIFTING BAR
150
HW/4

10mm Ø RSB
170
SP. @ 30 cm B.W.
300
12mm Ø RSB
12mm Ø RSB
SP. @ 18 CM O.C. 15 X 15 FILLET
SP. @ 30 CM O.C. 170 MANHOLE COVER
SCALE 1:10

12mm Ø RSB
SECTION B-B SP. @ 30 cm B.W.
SCALE 1:10
SECTION C-C
SCALE 1:20