1. INTRODUCTION
1
1.2 SYSTEM SPECIFICATION
CLIENT SIDE
RAM 512 MB
HARD DISK 10 GB
SERVER SIDE
RAM 1 GB
Hard disk 20 GB
2
1.2.2 SOFTWARE SPECIFICATION
CLIENT SIDE
SERVER SIDE
3
1.2.3 SOFTWARE DESCRIPTION
APACHE
The Apache HTTP Server Project is an effort to develop and maintain an open-source HTTP
server for modern operating systems including UNIX and Windows. The goal of this project
is to provide a secure, efficient and extensible server that provides HTTP services in sync
with the current HTTP standards.
The Apache HTTP Server ("httpd") was launched in 1995 and it has been the most
popularweb server on the Internet since April 1996. It has celebrated its 20th birthday as a
project inFebruary 2015.
PHP
• PHP supports many databases (MYSQL, Informix, Oracle, Sybase, Solid, Generic ODBC,
etc.).
MYSQL
4
CHAPTER 2
2. SYSTEM STUDY
The existing system is manual, paper-based process where bank staff managelocker
allocations, rental payments, and access control using physical records and keys. The
approach has several limitations:
The main purpose of the "Bank Locker Management System" is to offers better solution for
bank security system.It manages all the informationaboutassign bank locker.Banks offers
locker facilities to individuals at very small annual fee. These lockers are maintained in a
secure facility that is under constant surveillance and security.
2.3 SCOPE
The Software design document would demonstrate how the design will accomplish the
functional and non- functional requirements captured in the Software Requirement
specification (SRS). The document will provide a framework to the programmers through
describing the high-level components and architecture, sub systems, interfaces, database
design and algorithm design. This is achieved through the use of architectural patterns, design
patterns, sequence diagrams, class diagrams, relational models and user interfaces.
5
CHAPTER 3
3.1 FEASIBILITYS
The analysis of the requirement has led to a conclusion that the project is feasible with respect
to time and cost. The data collection from the field is assured by the client to provide. The
technology used to develop is almost Open Source, therefore less cost for implementation and
maintenance will be involved. A feasibility study is an analysis used in measuring the ability
and likelihood tocomplete a project successfully including all relevant factors. It must account
for factors that affect it such as economic, technological and time factors. It is used to assess
the strengths and weaknesses of a proposed project and present directions of activities which
will improve a project and achieve desired results.
The purpose of economic feasibility assessment is to determine the positive economic benefits
to the organization that the proposed system will provide. The assessment typically involves a
cost/benefits analysis.
Technical analysis is a trading tool employed to evaluate securities and attempt to forecast the
future movement. I am using java language and other tools like net beans to develop the
software.
6
3.1.3 OPERATIONAL FEASIBILITY
Operational feasibility is a measure of how well proposed system solves the problems, and
takes advantage of the opportunities identified during scope definition and how it satisfies the
requirements analysis phase of the system development.
3.2 ANALYSIS AND DESIGN
3.2.1 ANALYSIS
In present all doctor appointment work done on the paper. The whole year data is stored in the
registers. We can’t generate reports as per our requirements because its take more time to
calculate report of doctor appointments.
• Manual Control: All report calculation is done manually so there is a chance of error.
• Lots of paper work: Visitors maintain in the register so lots of paper require storing
details.
• Design is the first step in the development phase for any techniques and principles for
the purpose of defining a device, a process or system in sufficient detail to permit its physical
realization.
• Once the software requirements have been analysed and specified the software design
involves three technical activities - design, coding, implementation and testing that are
required to build and verify the software.
7
• The design activities are of main importance in this phase, because in this activity,
decisions ultimately affecting the success of the software implementation and its ease of
maintenance are made. These decisions have the final bearing upon reliability and
maintainability of the system. Design is the only way to accurately translate the customer’s
requirements into finished software or a system.
USER MODULES
In this project user is those who have locker in bank. With the help of locker number user can
see the details of lockers.
BANKER MODULES
DASHBOARD: In this section, Banker briefly views the Total assign lockers, Total Sub-
Banker and Total Locker Type.
SUB-BANKER: In this section, banker manage sub-banker (Add/Update/Delete).
LOCKER-TYPE: In this section, banker mange locker type (Add/Update/Delete).
ASSIGN LOCKER: In this section, banker assign the locker to customers or users with
providing unique locker number and key number of lockers through locker number users or
customer can view the details of their locker.
8
REPORTS: In this section, two reports are available.
B/W DATES REPORT: Banker can view a number of assign lockers in particular periods.
SEARCH REPORT: Banker can search locker details by using Locker
Number/KeyNumberus and contact us pages.
ACCOUNT SETTINGS :
SUB-BANKER MODULES
Sub-Banker and Banker features are the same except Sub-Banker creation. Sub-banker can
view, allocate, and deallocate lockers for customers. sub-banker can add, edit, delete
customer information, including contact details and locker assigned. sub-banker can grant or
revoke access to lockers for customers and other bank staff. Sub-Banker can’t create the Sub-
Banker.
9
CHAPTER 4
After all phase have been perfectly done, the system will be implemented to the server and the
system can be used.
SYSTEM TESTING
The goal of the system testing process was to determine all faults in our project The program
was subjected to a set of test inputs and many explanations were made and based on these
explanations it will be decided whether the program behaves as expected or not. Our Project
went through two levels of testing
1. UNIT TESTING
2. INTEGRATION TESTING
Unit testing is commenced when a unit has been created and effectively reviewed.In order to
test a single module we need to provide a complete environment i.e. besides the section we
would require
• The procedures belonging to other units that the unit under test calls
• A procedure to call the functions of the unit under test with appropriate parameters
10
• Testing admin login form-This form is used for log in of administrator of the system.
In this form we enter the username and password if both are correct administration page will
open otherwise if any of data is wrong it will get redirected back to the login page and again
ask the details.
• Report Generation: admin can generate report from the main database.
In the Integration testing we test various combination of the project module by providing the
input.
The primary objective is to test the module interfaces in order to confirm that no errors are
occurring when one module invokes the other module.
11
CHAPTER 5
5. UML DIAGRAMS
5.1 ACTOR
A coherent set of roles that users of use cases play when interacting with the use cases.
A description of sequence of actions, including variants, that a system performs that yields an
UML stands for Unified Modelling Language. UML is a language for specifying, visualizing
and documenting the system. This is the step while developing any product after analysis. The
goal from this is to produce a model of the entities involved in the project which later need to
be built. The representation of the entities that are to be used in the product being developed
need to be designed.
12
5.3 USE CASE DIAGRAM
• Use case diagrams model behaviour within a system and helps the developers
understand of what the user require. The stick man represents what’s called an actor.
• Use case diagram can be useful for getting an overall view of the system and clarifying
who can do and more importantly what they can’t do.
• Use case diagram consists of use cases and actors and shows the interaction between the
use case and actors.
• The purpose is to show the interactions between the use case and actor.
13
5.3.1BANKER
Sign In
Dashboard
ManageSub-Banker
SearchAssign Lockers
GenerateReports
Update Profile
Change Password
Password Recovery
14
5.3.2 SUB-BANKER
Sign In
Dashboard
Generate Reports
Update Profile
Change Password
Password Recovery
5.3.3 USER
Visit Website
View Contact
View About Us
15
5.4 CLASS DIAGRAM
A description of set of objects that share the same attributes operations, relationships,
and semantics.
5.5 ER DIAGRAM
16
• It maps well to the relational model. The constructs used in the ER model can easily
be transformed into relational tables.
• It is simple and easy to understand with a minimum of training. Therefore, the model
can be used by the database designer to communicate the design to the end user.
• In addition, the model can be used as a design plan by the database developer to
implement a data model in specific database management software.
5.5.1 ER NOTATION
All notational styles represent entities as rectangular boxes and relationships as lines
connecting boxes. Each style uses a special set of symbols to represent the cardinality of a
connection. The notation used in this document is from Martin. The symbols used for the
basic ER constructs are:
• Entities are represented by labelled rectangles. The label is the name of the entity.
Entity names should be singular nouns.
• Relationships are represented by a solid line connecting two entities. The name of the
relationship is written above the line. Relationship names should be verbs.
• Attributes, when included, are listed inside the entity rectangle. Attributes which are
identifiers are underlined. Attribute names should be singular nouns.
• Cardinality of many is represented by a line ending in a crow's foot. If the crow's foot
is omitted, the cardinality is one.
17
5.5.2 ER DAIGRAM
18
CHAPTER 6
CONCLUSION
This Application provides a computerized version of bank lockers facility which will benefit
the people who locker in bank. It makes entire process online and can generate reports. It has
a facility of bankers login, sub-banker login where banker can manage assign lockers and
generate assign lockers report. The application was designed in such a way that future
changes can be done easily. The following conclusions can be deduced from the development
of the project.
• It provides a friendly graphical user interface which proves to be better when compared to
the existing system.
• System security, data security and reliability are the striking features.
19
FUTURE ENHANCEMENT
I have tried to design the software in such a way that the user may not have any difficulty in
using this system and further expansion is also possible. New requirements will be added and
risk will be analysed in every phase until the requirement of user will not be fulfilled. The
most priority will be given to keep confidential data secure and easy and simple for use.
The further enhancements which can be made in the system are:
• Any requirement that will make system easy to use or make a system secure, this
requirement will be add using Spiral Model. Other requirement related to government or
municipality will be added when required.
• For the identity of user and for their data integrity, digital signature can be added to
this system.
• For the identity of user and for verification, image of user can be added to this system.
• A great concern will be given on frontend design which will make user to use system
easily and enjoy while using this system.
20
APPENDICES
A Data Flow Diagram (DFD) is a traditional visual representation of the information flows
within a system. A neat and clear DFD can depict the right amount of the system requirement
graphically. It can be manual, automated, or a combination of both.
It shows how data enters and leaves the system, what changes the information, and where data
is stored.
The objective of a DFD is to show the scope and boundaries of a system as a whole. It may be
used as a communication tool between a system analyst and any person who plays a part in
the order that acts as a starting point for redesigning a system. The DFD is also called as a
data flow graph or bubble chart.
All names should be unique. This makes it easier to refer to elements in the DFD.
Remember that DFD is not a flow chart. Arrows is a flow chart that represents the order of
events; arrows in DFD represents flowing data. A DFD does not involve any order of
events.
Suppress logical decisions. If we ever have the urge to draw a diamond-shaped box in a
DFD, suppress that urge! A diamond shaped box is used in flow charts to represents
decision points with multiple exists paths of which the only one is taken. This implies an
ordering of events, which makes no sense in a DFD.
Do not become bogged down with details. Defer error conditions and error handling until
the end of the analysis. Standard symbols for DFDs are derived from the electric circuit
diagram analysis and are shown in fig:
21
Circle: A circle (bubble) shows a process that transforms data inputs into data outputs.
Data Flow: A curved line shows the flow of data into or out of a process or data store.
Data Store: A set of parallel lines shows a place for the collection of data items. A data store
indicates that the data is stored which can be used at a later stage or by the other processes in
a different order. The data store can have an element or group of elements.
Source or Sink: Source or Sink is an external entity and acts as a source of system inputs or
sink of system outputs.
22
ZERO LEVEL DFD
Locker-Type Password
Management
Management
Banker Login
Management Management
BLMS
Sub-Banker
Authorization
Management
Management
Management Management
23
FIRST LEVEL DFD
Locker-Type Password
Management
Management
Banker Webpages
Management Management
BLMS
Sub-Banker Login
Management Management
Generate
Authorization
Report
Management
Management Management
24
SECOND LEVEL DFD
Manage Sub-
Banker
Manage Locker
Type
Forgot
Password Check
Credential Assign Locker
Manage
Modules Manage Web
Pages
25
B. TABLE STRUCTURE
26
Locker type Table: (Table name is table lockertype)
(Table name is table page) This table stores the details of website
27
C. SAMPLE CODING
<?php
include('banker/includes/config.php');
session_start();
error_reporting(0);
?>
<!DOCTYPE HTML>
<html lang="zxx">
<head>
28
<link rel="stylesheet" type="text/css" href="css1/demo.css"/>
<link
href="//fonts.googleapis.com/css?family=Dosis:200,300,400,500,600,700,800&subset=l
atin-ext" rel="stylesheet">
<link
href="//fonts.googleapis.com/css?family=Ubuntu+Condensed&subset=cyrillic,cyrillic-
ext,greek,greek-ext,latin-ext" rel="stylesheet">
</head>
<body>
<?phpinclude_once("includes/header.php");?>
<div class="container">
<div class="w3-agileits-about-grids">
</div>
<?php
29
$ret=mysqli_query($con,"select * from tblpage where PageType='aboutus' ");
$cnt=1;
while ($row=mysqli_fetch_array($ret)) {
?>
<?php } ?>
</div>
<div class="clearfix"></div>
</div>
</div>
</div>
<!--stats-->
<div data-vide-bg="video/coins">
<div class="container">
30
<div class="stats-info">
<div class="agile-one">
<h4 class="stats-info">Employees</h4>
<div class='numscrollernumscroller-big-bottom'
data-slno='1' data-min='0' data-max='12760' data-delay='.5' data-
increment="1">12760</div>
</div>
</div>
<div class="agile-one">
<h4 class="stats-info">Locations</h4>
<div class='numscrollernumscroller-big-bottom'
data-slno='1' data-min='0' data-max='12760' data-delay='.5' data-
increment="1">12760</div>
</div>
</div>
<div class="agile-one">
31
<div class='numscrollernumscroller-big-bottom'
data-slno='1' data-min='0' data-max='12760' data-delay='.5' data-
increment="1">12760</div>
</div>
</div>
<div class="clearfix"></div>
</div>
</div>
</div>
</div>
<!--//stats-->
<div class="container">
<div class="mail-w3l-agile">
<?php
$cnt=1;
32
while ($row=mysqli_fetch_array($ret)) {
?>
<div class="w3l-cont-mk">
<imgsrc="images1/img2.jpg">
</div>
<h3>Contact Info</h3>
<div class="visit">
</div>
<h4>Visit us</h4>
<p><?phpecho $row['PageDescription'];?></p>
</div>
<div class="clearfix"></div>
</div>
<div class="mail-w3">
33
<i class="fa fa-envelope-o" aria-
hidden="true"></i>
</div>
<h4>Mail us</h4>
<p><a
href="mailto:[email protected]"><?phpecho $row['Email'];?></a></p>
</div>
<div class="clearfix"></div>
</div>
<div class="call">
</div>
<h4>Call us</h4>
<p>+<?phpecho $row['MobileNumber'];?></p>
</div>
<div class="clearfix"></div>
</div>
</div><?php } ?>
34
<div class="col-md-6 col-sm-6 agileinfo_mail_grid_right">
<div class="wthree_contact_left_grid">
<input type="text"id="searchinput"
name="searchinput"placeholder="Search Locker Details by Locker Number/ Key Number"
required="">
</div>
<br>
</form>
</div>
<div class="clearfix"></div>
</div>
</div>
</div>
<?phpinclude_once("includes/footer.php");?>
35
<!--js files -->
<!--js -->
<!--responsiveslider -->
<script src="js1/responsiveslides.min.js"></script>
<script>
$(function () {
// Slideshow 4
$("#slider3").responsiveSlides({
auto: true,
pager:true,
nav:false,
speed: 500,
namespace: "callbacks",
before: function () {
},
36
after: function () {
});
});
</script>
<script type="text/javascript">
jQuery(document).ready(function($) {
$(".scroll").click(function(event){
event.preventDefault();
$('html,body').animate({scrollTop:$(this.hash).offset().top},1000);
});
});
37
</script>
<script src="js1/SmoothScroll.min.js"></script>
<script type="text/javascript">
$(document).ready(function() {
/*
var defaults = {
scrollSpeed: 1200,
easingType: 'linear'
};
*/
});
</script>
38
<!-- video-js -->
<script src="js1/jquery.vide.min.js"></script>
<!--gallery-js -->
<script src="js1/jquery.picEyes.js"></script>
<script>
$(function(){
//picturesEyes($('.demo li'));
$('.demo li').picEyes();
});
</script>
<!--//gallery-js -->
</body>
</html>
39
D. SCREENSHOT
HOME PAGE
40
SEARCH LOCKER DETAILS
41
VIEW LOCKER DETAILS
42
BANKER OR SUB BANKER LOGIN PAGE
FORGOT PASSWORD
43
DASHBOARD
PROFILE
44
CHANGE PASSWORD
ADD SUB-BANKER
45
MANAGE SUB-BANKER
UPDATE SUB-BANKER
46
ADD LOCKER TYPE
47
UPDATE LOCKER TYPE
ASSIGN LOCKER
48
MANAGE ASSIGN LOCKER
49
UPDATE ASSIGN LOCKER
50
UPDATE IMAGE
51
VIEW BETWEEN DATES AND REPORTS
SEARCH REPORT
52
VIEW SEARCH REPORTS
ABOUT US PAGE
53