Date: 22 May 2024
REF #: 24-CHE-_____PRO-VRC, PDC
Dear Sir,
In response to the above subject, we are pleased to submit our quotation for your evaluation and approval.
GENERAL REQUIRMENTS
I GEN. REQUIREMENTS QTY UNIT Unit COST TOTAL
1.1 Mobilization/Demob 1 LOT 42,000.00 42,000.00
Bonds and
1.2
Insurances/documentations
Storage Area, Barracks and
1.3
Utilities, Temp Facils
Safety Requirements (PPEs/Safety
1.4 1 LOT 16,800.00 16,800.00
Signages and etc
1.5 Tools and Equipment 1 LOT 27,552.00 27,552.00
1.6 Clearing and Demobilization 1 LOT Included
Materials/unit/consumable with 2
1.7 1 LOT 244,272.00 244,272.00
Units FCU Ceiling Suspended 5TR
1.8 LABOR with Tech Supervision 1 LOT 23,688.00
TOTAL 354,312.00
TOTAL QUOTE 354,312.00
Discount: 17,715.60
TOTAL LESS DISCOUNT 336,596.40
Grand Total Price VAT-IN: 376,987.97
Amount in words:
THREE HUNDRED SEVENTY-SIX THOUSAND NINE HUNDRED EIGHTY-SEVEN PESOS AND
97/100
Validity: Fifteen (15) days upon submission of quotation.
2900, Maxville 12, Eusebio Ave., San Miguel,
1600 Pasig City, Philippines
E-mail:
[email protected] /
[email protected]Tel.: (02)8635-6920/ 8231-1216
Mobile: 0949-6799291/ 0995-6124397
CHEMSYSOLU-TECH ENTERPRISES
Chemicals, Projects, Refrig. Design & Build, Air-Con. & Services
Delivery: 15 to 20 days after of Down Payment mentioned below.
Work Durations: 3 TO 5 DAYS
Terms of Payment: 60% Down Payment/ 30% Upon Completion of Projects/10% Retention
Scope of Work:
1. Final Inspection And Coordination
2. Site and Safety Orientation
3. Mobilization
4. Delivery of Unit
5. Installations of Units
6. Installations of Accessories
7. Leak Testing
8. Flushing
9. Insulations
10. Quality Control
11. Run Testing and Commissioning
12. Turn Over of Projects and acceptance
13. Submission of WCOC and Other Documents as needed
14. Clean as you go SOP
Note: Chemical Flushing is on Separate quotations>
Sincerely yours, Conforme:
EDWARD M ALFARO MR. MANUEL E SACLAG
Asst Tech Service Manager /Tech Sales/EHS Manager GEN MANAGER JMS ENSVC INC
WTC/WTA, HVAC, Mechanical and Project.
Mobile: 09194646122/ 09356962281
E-mail:
[email protected]/
[email protected]Noted By:
Joshua P. Bulaso
President/ BD Sales Manager
Mobile:0995-6124397/ 0949-6799291
E-mail: [email protected]
2900, Maxville 12, Eusebio Ave., San Miguel,
1600 Pasig City, Philippines
E-mail:
[email protected] /
[email protected]Tel.: (02)8635-6920/ 8231-1216
Mobile: 0949-6799291/ 0995-6124397